Laserfiche WebLink
NOTES: <br />1. If the distance between cross—cuts are less then 150' the entire area between <br />corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br />2. The resurfacing requirements shall be in addition to County Standard Drawing No. <br />R-29. <br />3. Resurfacing for Bell Holes shall meet these requirements. If excavation occurs within <br />the shoulder or lane, only that area shall be resufaced as shown. <br />4. If cross—cutting is performed on Local Roads at intervals less then 150' a Seal <br />Coat for that half of the roadway containing the trench can be used in lieu of <br />resurfacing. Section 2-5.03 (B-2). <br />Paved Shoulder <br />Working for YOU <br />Q) <br />U w <br />O o <br />It <br />7 t <br />N U <br />� G <br />1 <br />F FOA <br />n/l/mio <br />C) <br />U <br />0 <br />O <br />U <br />TRENCH CUTTING POLICY <br />CROSS CUTTING OF <br />COUNTY ROADWAYS No. Revision De: <br />COUNTY OF SANJOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />Date: DEC 2014 Std. Dwg. No. R-36 <br />