Laserfiche WebLink
NOTES: <br />1. If the distance between cross—cuts are less then 150' the entire area between <br />corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br />2. The resurfacing requirements shall be in addition to County Standard Drawing No. <br />R-29, <br />3. Resurfacing for Bell Holes shall meet these requirements. If excavation occurs within <br />the shoulder or lane, only that area shall be resufaced as shown. <br />4. If cross—cutting is performed on Local Roads at intervals less then 150' a Seal <br />Coat for that half of the roadway containing the trench can be used in lieu of <br />resurfacing. Section 2-5.03 (B-2). <br />c � <br />0 <br />�Q) <br />Uv U <br />O C <br />� <br />cU <br />CO o� <br />m� o <br />c•-� <br />U) 3 m <br />Paved Shoulder <br />U � <br />O a <br />PPPP <br />PAP <br />PAPA <br />III <br />CINESS; <br />7 t <br />V! <br />U C <br />U <br />m <br />U <br />• 1W TRENCH CUTTING POLICY Approved by: <br />CROSS CUTTING OF <br />COUNTY ROADWAYS No. Revis�cri trate <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />Wdr]dng for YOU Date: DEC 2014 Std. Dwg. No. R-36 <br />�1 <br />i <br />