Laserfiche WebLink
N OTES: <br />1. If the distance between cross—cuts are less then 150' the entire area between <br />corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br />2, The resurfacing requirements shall be in addition to County Standard Drawing No. <br />R-29. <br />3. Resurfacing for Bell Holes shall meet these requirements, If excavation occurs within <br />the shoulder or lane, only that area shall be resufaced as shown. <br />4. If cross—cutting is performed on Local Roads at intervals less then 150' a Seal <br />Coat for that half of the roadway containing the trench can be used in lieu of <br />resurfacing. Section 2-5,03 (B-2). <br />Paved Shoulder <br />Working for YOU <br />TRENCH CUTTING POLICY <br />CROSS CUTTING OF <br />COUNTY ROADWAYS <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />Date: DEC 2014 <br />Revision Description Date <br />Dwg. No. 1146 <br />