Laserfiche WebLink
Department of Public Works <br />MAr <br />JOAQUIN <br />Kris Balail, Director of Public Works <br />SAN <br />L I —COUNTY— a Fritz Buchman, Deputy DirectorlDevelopment <br />�Alex Chetley, Interim Deputy Director/Engineering <br />Greatness brows here, Wwkb3s ft YOU Jim Stone, Deputy Director/Operations <br />Kristi Rhea, Manager of Strategic Initiatives <br />AGI(nowledgement of Monument Preservation <br />I BENJAMIN H. SANTOS , a duly Licensed Land Surveyor or a Professional Engineer <br />(Please p(int) <br />authorized to perform Land Surveying in the State of California, Registration No. 9251 <br />hereby acknowledge and accept all responsibility for the monument preservation as required <br />per Section 8771(a -f) of the Business and Professions Code withinththe ��3ss o/f the <br />construction activity permitted by San Joaquin County Permit No.2340 Sanguinetti Ln. <br />I further acknowledge that I am hereby responsible for the Acknowledgement of Monument <br />Preservation prior to final acceptance of the construction activity. <br />Signature <br />January 24, 2020 <br />PS -MONUMENT PRESERVATION <br />1810 East Hazelton Avenue � Stockton, California 95205 � T 209 468 3000 � F 209 468 2999: . <br />