PS -2000488 <br />SPECIAL CONDITIONS FOR <br />ENCROACHMENT PERMIT <br />February 19, 2020 <br />Maintain traffic controls for all roads. Traffic control delays shall not exceed 10 minutes. <br />Two-way traffic shall be maintained during non -working hours with excavated areas backfilled or <br />plated. During working hours, two-way traffic control shall be maintained with one lane open and <br />appropriate flaggers. <br />2. Access <br />to all <br />properties shall <br />be maintained at all times <br />except <br />when work is occurring at the <br />access <br />point. <br />Minimal delays <br />will be allowed to provide <br />access <br />within the work zone area. <br />3. Any areas where <br />parking is <br />to be restricted shall have signs noting <br />the restrictions in place at <br />least 48 hours in <br />advance. <br />4. School Buses and Emergency Service Vehicles shall be passed through the work zone with <br />minimal delays. <br />5. All destroyed or obliterated pavement markings must be replaced in kind by the permittee. Typical <br />pavement markings include but not limited to lane lines, centerlines, stop and stop ahead <br />legends, limit lines, raised pavement markers and miscellaneous delineators. <br />6. The Permittee is responsible for the preservation of survey monuments located within the area of <br />work herein permitted. Prior to the start of construction, survey monuments that potentially may <br />be disturbed shall be located and referenced by a Licensed Land Surveyor, and a Corner Record <br />filed with the County Surveyor. Any Survey Monuments disturbed during the course of <br />construction shall be reestablished by a Licensed Land Surveyor and another Corner Record filed <br />with the County Surveyor. (Land Surveyors' Act Section 8771) <br />7. County roads shall be kept clean from mud and debris at all times along the access points and <br />work zone areas during entire project. All standard roadway striping and signage shall be clearly <br />visible, maintained and restored throughout the construction zone during and after the project. <br />8. In addition to standard dust control measures, streets shall be maintained in a clean condition, <br />free of dirt, mud and debris during construction activities. The contractor shall provide daily, and <br />as determined to be necessary by County inspectors, street sweeping using a modern <br />mechanical or vacuum -assisted street sweeper. <br />9. The contractor shall not conduct construction operations in rain or heavy fog conditions. <br />