Laserfiche WebLink
10" Min <br />RIGID CONDUIT <br />Note 1 Below <br />-Existing- \ <br />Pavement <br />See Note 2 Below <br />Compact in 12" mar <br />layers to a min rela <br />compaction of 95% <br />under pavement and <br />90% outside paveme <br />-Compact in <br />24" <br />mar <br />layers to a <br />min <br />relative <br />compaction <br />of <br />85%. <br />-Compact in <br />6" <br />layer <br />to a min relative <br />compaction <br />of <br />90%. <br />10" Min 10" <br />H <br />t zu min <br />FLEXIBLE CONDUIT <br />NOTES: <br />1. New pavement shall be 1" thicker than existing pavement, minimum <br />of 0.25 Ft. New base shall be 1" thicker than existing base, min of 0.50 Ft. <br />2. Select native material or imported granular material as approved by the Director <br />of Public Works. Backfill with materials equal to or better than the existing <br />pavement and base in quality. <br />3. Relative compaction of materials shall be tested in accordance with <br />the State of California, Dept. of Transportation Testing Manuals, test <br />method No. California 216 or 231. <br />4. All existing pavement shall be neatly cut to line prior to trench excavation. <br />5. Jetting or ponding will be permitted within the street right-of-way with <br />a 3 year bond, when approved by the Director of Public Works. <br />6. When shown by soil composition and compactability, ninety percent (90%) <br />compaction may be used, when approved by the Director of Public Works. <br />7. Special bedding and backfill requirements may be shown on the plans or <br />specified in the special provisions. <br />w�� for You <br />TYPICAL TRENCH BACKFILL ���-/� <br />No. Revision Description Date <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />Date: DEC 2014 Std. Dwg. No. R-29 <br />6.. <br />I <br />\ <br />3'-( <br />-------- <br />Var <br />It.\i <br />OD+12 <br />Min <br />OD <br />10" f <br />OD <br />t zu min <br />FLEXIBLE CONDUIT <br />NOTES: <br />1. New pavement shall be 1" thicker than existing pavement, minimum <br />of 0.25 Ft. New base shall be 1" thicker than existing base, min of 0.50 Ft. <br />2. Select native material or imported granular material as approved by the Director <br />of Public Works. Backfill with materials equal to or better than the existing <br />pavement and base in quality. <br />3. Relative compaction of materials shall be tested in accordance with <br />the State of California, Dept. of Transportation Testing Manuals, test <br />method No. California 216 or 231. <br />4. All existing pavement shall be neatly cut to line prior to trench excavation. <br />5. Jetting or ponding will be permitted within the street right-of-way with <br />a 3 year bond, when approved by the Director of Public Works. <br />6. When shown by soil composition and compactability, ninety percent (90%) <br />compaction may be used, when approved by the Director of Public Works. <br />7. Special bedding and backfill requirements may be shown on the plans or <br />specified in the special provisions. <br />w�� for You <br />TYPICAL TRENCH BACKFILL ���-/� <br />No. Revision Description Date <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />Date: DEC 2014 Std. Dwg. No. R-29 <br />