Laserfiche WebLink
NOTES: <br />1. If the distance between cross—cuts are less then 150' the entire area between <br />corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br />2. The resurfacing requirements shall be in addition to County Standard Drawing No. <br />R-29. <br />3. Resurfacing for Bell Holes shall meet these requirements. If excavation occurs within <br />the shoulder or lane, only that area shall be resufaced as shown. <br />4. If cross—cutting is performed on Local Roads at intervals less then 150' a Seal <br />Coat for that half of the roadway containing the trench can be used in lieu of <br />resurfacing. Section 2-5.03 (B-2). <br />c � <br />� � L <br />UvU <br />O 0 <br />� O O <br />O 0U <br />O O <br />c 3 a <br />�P� Q aved Shoulder I 'x e <br />000 <br />o1 o <br />c Z3t <br />O U <br />W � � I � Q) � C <br />T <br />+O <br />} <br />/O <br />1 <br />zl I <br />VII I W <br />Fm <br />O <br />oU <br />N <br />working for You <br />TRENCH CUTTING POLICY rr <br />CROSS CUTTING OF %�� <br />COUNTY ROADWAYS No. Revision De: <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />Date: DEC 2014 Std. DWg. No. <br />