Laserfiche WebLink
6" Mi <br />(TYp. <br />Cali <br />10" <br />See Note 1 <br />Existing - <br />6 <br />Pavement <br />n� <br />f� <br />Sae <br />0'..a\\. <br />10" <br />�/ COrr <br />layer <br />\\ <br />-------- <br />r com <br />\� und< <br />p - <br />\ Com <br />layer: <br />/2 <br />\\ corr <br />Corr <br />to c <br />corr <br />Min <br />OD <br />OD <br />RIGID CONDUIT <br />Below <br />Note 2 Below <br />pact in 12" max— <br />s to a min relative <br />paction of 95% <br />r pavement and <br />outside pavement. <br />oact <br />to a min relative \\ \ <br />paction of 85%. \\ <br />pact in 6" layers <br />min relative <br />paAin <br />ction of 90%. <br />10" Min <br />+ 20" Min <br />FLEXIBLE CONDUIT <br />0" Min <br />NOTES: <br />1. New pavement shall be 1" thicker than existing pavement, minimum <br />of 0.25 Ft. New base shall be 1" thicker than existing base, min of 0.50 Ft. <br />2. Select native material or imported granular material as approved by the Director <br />of Public Works. Backfill with materials equal to or better than the existing <br />pavement and base in quality. <br />3. Relative compaction of materials shall be tested in accordance with <br />the State of California, Dept. of Transportation Testing Manuals, test <br />method No. California 216 or 231. <br />4. All existing pavement shall be neatly cut to line prior to trench excavation. <br />5. Jetting or ponding will be permitted within the street right-of-way with <br />a 3 year bond, when approved by the Director of Public Works, <br />6, When shown by soil composition and compactability, ninety percent (90%) <br />compaction may be used, when approved by the Director of Public Works. <br />7. Special bedding and backfill requirements may be shown on the plans or <br />specified in the special provisions. <br />Working for YOU <br />COUNTY OF SAN TOAQUIN <br />DEPARTMENT OF PUBLiC WORKS <br />Date: DEC 2014 <br />Dwg. No. R`29 <br />