My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2020_PS-2001001 thru PS-2001500_ - PS-2001320
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2020
>
PS-2001001 thru PS-2001500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2020_PS-2001001 thru PS-2001500_ - PS-2001320
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2023 11:10:45 AM
Creation date
1/20/2023 11:08:47 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2001320
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2020
Notes2
Jack Tone Rd. 2700' S/O Harney Ln. (Paddy Creek)
Address
2020 L St., Ste. 400, Sacramento,CA
Application
AECOM-Marcus Moreno
Type
Traffic Control Devices
Supplemental fields
Cross Ref
PWP110005
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A'COM <br />• Potential health hazards from asphalt fumes, concrete and rock dust. <br />Lead paint on old bridge work and overpasses. <br />High noise levels. <br />Heat or cold stress. <br />Work over water (bridges, causeways) <br />• Work at elevation (overpasses and bridges). <br />Tunneling and blasting. <br />4.3.2 Applicable procedures shall be consulted and appropriate control measures established. Additional <br />specific plans may be necessary for specialized work. <br />4.3.3 PPE selection shall be based on the THA. Refer to the S3AM-208-PRI Personal Protective <br />Equipment. <br />4.4 Traffc accommodation equipment, as required by the Traffic Protection Plan <br />4.4.1 The traffic accommodation equipment may entail: <br />A rooftop beacon light for the vehicle, <br />Pylons, Glo-posts, flags, barricades and/or flagging tape, warning lights, flashing light boards <br />Advance signage <br />• Flagging equipment, as required: <br />o Daytime: <br />• Flag person's "Stop and Slow" paddle. <br />• PPE including high -visibility clothing meeting local legislation. <br />• Drinking water. <br />• Bug repellent and/or sun screen as conditions warrant. <br />• Optional radio communication (if required). <br />o <br />Nighttime (additional requirements): <br />• A retro -reflective "Stop and Slow" paddle. <br />• A flashlight fitted with a red signaling baton. <br />• Flashing yellow beacons set up in advance of the flag person. <br />• Additional nighttime PPE as per jurisdictional requirements. <br />4.5 Traffic Protection Plan <br />4.5.1 Each Manager shall prepare a project Traffic Protection Plan addressing traffic controls and worker <br />protection appropriate for the team's exposures. PPE requirements for all types of workers on the <br />road project shall be specified including surveyors, environmental, QA, inspectors and engineers. <br />The Traffic Protection Plan may be a stand-alone document, or contained within the safety plan if <br />allowed by legislation. Plans shall address the following if applicable: <br />Closure zones within the project boundaries <br />Work zone protections: various styles of concrete, water, sand, collapsible barriers, crash <br />cushions, and truck mounted attenuators. <br />Guide vehicles. <br />Communication methods and systems. <br />Highway 8 Road Work (S3AM-308-PR1) <br />Revision 3 December 15, 2016 <br />PRINTED COPIES ARE UNCONTROLLED. CONTROLLED COPY IS AVAILABLE ON COMPANY INTRANET. Page 3 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.