My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2020_PS-2001501 thru PS-2002000_ - PS-2001592
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2020
>
PS-2001501 thru PS-2002000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2020_PS-2001501 thru PS-2002000_ - PS-2001592
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2023 9:27:34 AM
Creation date
1/23/2023 9:25:19 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2001592
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2020
Notes2
Both Sides of Horner Ave. Between Walker Ln. and Anteros Ave.
Address
PO Box 930, Stockton,CA 95201
Application
Pacific Gas & Electric-Stockton
Type
Lower/Raise Lids
Supplemental fields
Cross Ref
PWP730052
Type (2)
Encroachment Permit (EP)
Callout
ID:
1
Creator:
Created:
1/23/2023 9:25 AM
Modified:
1/23/2023 9:25 AM
Text:
LOCATION #3: Ex. Deep Well Anode (PM30148281-2001)
Rectangle
ID:
1
Creator:
Created:
1/23/2023 9:25 AM
Modified:
1/23/2023 9:25 AM
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3006-D1 <br />3 <br />4 <br />24 <br />3005-D847 <br />7 26 <br />25 <br />5 <br />ARDELLE <br />AVE <br />S <br /> W <br />A <br />L <br />K <br />ER <br /> <br />LN <br />CARMELLIA <br />ST <br />HORNER AVE <br />¥40 0 40 80 120 <br />Feet <br />SCALE : 1 inch = 100 feet <br />Printed on: 5/20/2020 <br />PACIFIC GAS & ELECTRIC COMPANY"WARNING: Confidential, Proprietary Information <br />This document contains confidential, proprietaryinformation that is the sole property of Pacific Gasand Electric Company (PG&E) and is intended foruse only by authorized PG&E employees and agents. <br />Copyright Pacific Gas and Electric Company 2020" <br />Location 3 <br />Reference PG&E's GIS for the most current information <br />No engineering decisions related to proposed acceptable facility clearances from PG&E facilities, construction methods over or under PG&E facilities, wheel loading, or cuts/fills over PG&E facilities should be determined from these maps. All improvement plans must be reviewed by PG&E engineering
The URL can be used to link to this page
Your browser does not support the video tag.