Laserfiche WebLink
C9A(CA)ROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4250’250’250’ <br />250’ <br />250’ <br />50’ <br />JOB#/PM# <br />JB347734 <br />PRIME CONTRACTOR <br />SEFNCO <br />PREPARED BY <br />CITY RISE, INC <br />DATE PREPARED <br />06-08-2020 <br />SHEET# <br />TC -5 <br />INITIALS <br />AWS <br />AGENCY <br />San Joaquin Co / Caltrans <br />SCALE <br />NOT TO SCALE <br />TCP QUESTIONS CALL: <br />209-400-7075 <br />PROJECT LOCATION <br />23265 CA 99, Acampo <br />MPH TAPER SIGN SPACING TAPER TANGENT <br />SHIFT TAPER = 1/2TAPER <br />SHOULDER TAPER = 1/3TAPER <br />WORK AREA <br />Ÿ HOURS OF WORK TO BE DETERMINED BY <br />AGENCY. <br />Ÿ TRAFFIC CONTROL PER LATEST CA MUTCD. <br />Ÿ IF FLAGGERS ARE ON SITE, ALL FLAGGERS <br />TO COMMUNICATE THROUGH HAND <br />SIGNALS AND RADIO DEVICES. <br />Ÿ PEDSTRIAN, BICYCLE, AND DRIVEWAYS TO <br />REMAIN OPEN UNLESS NOTED ON TRAFFIC <br />PLAN. <br />GENERAL NOTES <br />35 245’250’35’70’N 99 Frontage Rd 35Peltier Rd 30 <br />TRAFFIC TO BE STOPPED <br />10-15 MINUTES FOR <br />TRANSFER O.H. WIRE <br /> <br />On Ramp <br />Off Ramp <br />ONE LANEROADAHEADW20-450’250’C9A(CA)ROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4250’250’250’ONE LANEROADAHEADW20-4250’ <br />ROAD <br />WORK <br />AHEAD <br />W20-1ROADWORKAHEADW20-1 <br />C9A(CA)BEPREPAREDTOSTOPW3-4ROADWORKAHEADW20-1 <br />ROADWORKAHEADW20-1 <br />C9A <br />( <br />C <br />A <br />)ROADWORKAHEADW20-1 <br />250’ <br />250’ <br />EXP 9/30/20 <br /> 6/08/20N 99 Frontage Rd 35