My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2020-PS-2001501 thru PS-2002000_ - PS-2001765
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2020
>
PS-2001501 thru PS-2002000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2020-PS-2001501 thru PS-2002000_ - PS-2001765
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2023 10:54:53 AM
Creation date
1/23/2023 10:52:06 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2001765
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2020
Notes2
S/S of Kettleman Ln. 355' E/O Wells Ln.
Address
5555 E. Olive RM#300111, Fresno,CA 93727
Application
AT&T-Fresno
Type
Ground Bell Install
Supplemental fields
Cross Ref
PWP730079
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Special Conditions for -2- <br />ENCROACHMENT PERMIT <br /> <br /> <br />12. All trenches/bell holes shall be completely backfilled or shored and plated at the end of each <br />workday, and the roadway restored to two-way traffic. If plating is to be used, a trench shoring <br />and plating plan suitable for traffic loadings shall be prepared by a registered civil engineer and <br />submitted for prior approval by the County. <br /> <br />13. The contractor shall use San Joaquin County Improvement Standard R-29 when backfilling <br />trenches/bell holes within the County right-of-way. <br /> <br />14. County roads shall be kept clean from mud and debris at all times along the access points and <br />work zone areas during entire project. All standard roadway striping and signage shall be clearly <br />visible, maintained and restored throughout the construction zone during and after the project. <br /> <br />15. In addition to standard dust control measures, streets shall be maintained in a clean condition, <br />free of dirt, mud and debris during construction activities. The contractor shall provide daily, and <br />as determined to be necessary by County inspectors, street sweeping using a modern <br />mechanical or vacuum-assisted street sweeper. <br /> <br />16. The contractor shall not conduct construction operations in rain or heavy fog conditions.
The URL can be used to link to this page
Your browser does not support the video tag.