My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2020-PS-2001501 thru PS-2002000_ - PS-2001906
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2020
>
PS-2001501 thru PS-2002000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2020-PS-2001501 thru PS-2002000_ - PS-2001906
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2023 3:39:21 PM
Creation date
1/23/2023 3:36:14 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2001906
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2020
Notes2
S/S of Tenth St. 100' E/O Beighle St.
Address
PO Box 930, Stockton,CA 95201
Application
Pacific Gas & Electric-Stockton
Type
Bell Hole
Supplemental fields
Cross Ref
PWP730052
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
APPLICATION FOR ENCROACHMENT PERMIT <br />PLEASE PRINT <br />Date 7/1/2020 <br />To: San Joaquin County <br />Department of Public Works <br />PG&E - PM 44321459 <br />(Applicant Name) <br />220 Channel St <br />(Mailing Address) <br />STOCKTON, CA, 95202 <br />(City, State, Zip Code) <br />925-701-1564 <br />(Area Code - Telephone Number) <br />GXJL@PGE.COM <br />(Email Address) <br />Sketch (Detailed plans may be submitted) <br />JOB # <br />APN <br />EXP. DATE <br />VALID <br />STREET <br />AREA <br />TYPE <br />FORMS <br />NOTES <br />OFFICE USE ONLY <br />730052-6 REF # <br />CR # <br />11/1/2020 <br />8/3/2020 TO 11/1/2020 DRIVEWAYS: <br />Tenth St. <br />Stockton QUAD SS <br />Bell Hole (Leak Repair) <br />SSMNV, R-29, Trench Cut Policy <br />Special Conditions <br />Crew to call SJ County Inspector at (209) 953-7421 48 to 72 hours before work starts. <br />When calling, crew shall request "rain clearance" for any work during winter months <br />November through March <br />The undersigned hereby applies for permission to excavate, construct and/or otherwise encroach on County Highway Right -of -Way on <br />the South side of E 10TH ST approximately 100' feet/mile East <br />of S BIEGHLE ST 1810 E 10TH AT STOCKTON by performing the following work (description of work): <br />PG&E to excavate 4x4 bell hole to perform leak repairs. <br />Work will commence on or after 8/3/2020 for approximately 1 days. <br />I, the undersigned, certify that I am the owner of the respective property, or am qualified to represent the owner and agree to do the <br />work described above in accordance with the rules and regulations of San Joaquin County and subject to inspection and approval. <br />�� QB2.GL/.csL <br />Signature of Applicant - Title <br />V]FORN6&TENPIATEIENCROACHMEN T PERMIT APPLICATION dov(W&OP <br />Date <br />7/1/2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.