Laserfiche WebLink
California MUTCD 2014 Edition Page 1117 <br />(FHWA's MUTCD 2009 Edition, including Revisions 1 & 2, as amended for use in California) <br />Table 6F-101(CA). Maximum Spacing of Channelizinq Devices <br />Speed <br />(mph) <br />Maximum Channelizing Devices Spacing <br />Taper" <br />(feet) <br />Tangent <br />(feet <br />Conflict" <br />(feet) <br />20 <br />20 <br />40 <br />10 <br />25 <br />25 <br />50 <br />12 <br />30 <br />30 <br />60 <br />15 <br />35 <br />35 <br />70 <br />17 <br />40 <br />40 <br />80 <br />20 <br />45 <br />45 <br />90 <br />22 <br />50 <br />50 <br />100 <br />25 <br />55 <br />50 <br />100 <br />25 <br />60 <br />50 <br />100 <br />25 <br />65 <br />50 <br />100 <br />25 <br />70 <br />50 <br />100 <br />25 <br />75 <br />L 50 <br />100 <br />25 <br />Maximum channelizing device spacing for all speeds on one-laneltwo-way tapers is <br />20 feet. <br />Maximum channellzing device spacing for all speeds on downstream tapers is 20 <br />feet. <br />All other tapers are as shown. <br />Use on intermediate and short-term projects for taper and tangent sections where <br />there are no pavement markings or where there is a conflict between existing <br />pavement markings and channellzing devices. <br />Chapter OF — Temporary 'traffic Control Zone Devices November 7, 2014 <br />Part 6 — Temporary Traffic Control <br />a <br />