My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2020_PS-2002001 thru PS-2002500_ - PS-2002107
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2020
>
PS-2002001 thru PS-2002500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2020_PS-2002001 thru PS-2002500_ - PS-2002107
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2023 10:44:18 AM
Creation date
1/24/2023 10:41:49 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2002107
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2020
Notes2
28555 S. Lehman Rd.
Address
PO Box 930, Stockton,CA 95201
Application
Pacific Gas & Electric- Stockton
Type
Bore (over 12 inch Dia)
Supplemental fields
Cross Ref
PWP730052
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
California MUTCD 2014 Edition <br />(FHWA’s MUTCD 2009 Edition, including Revisions 1 & 2, as amended for use in California) <br />Chapter 6H – Typical Applications November 7, 2014 <br />Part 6 – Temporary Traffic Control <br />Page 1137 <br />Table 6H-4(CA). Taper Length Criteria for Temporary Traffic Control Zones <br />(for 12 feet Offset Width) <br />Speed* <br />S <br />(mph) <br />Minimum Taper Length** <br />for Width of Offset 12 feet (W) <br />Merging <br />L <br />(feet) <br />Shifting <br />L/2 <br />(feet) <br />Shoulder <br />L/3 <br />(feet) <br />Down <br />Stream <br />(feet)*** <br />20 80 40 27 50 <br />25 125 63 42 50 <br />30 180 90 60 50 <br />35 245 123 82 50 <br />40 320 160 107 50 <br />45 540 270 180 50 <br />50 600 300 200 50 <br />55 660 330 220 50 <br />60 720 360 240 50 <br />65 780 390 260 50 <br />70 840 420 280 50 <br />75 900 450 300 50 <br /> <br />* - Posted speed limit, off-peak 85th-percentile speed prior to work starting, or the anticipated operating <br />speed in mph. <br />** - For other offsets use the following merging taper length formula for L: <br />For speeds of 40 mph or less, L=WS2/60 <br />For speeds of 45 mph or more, L=WS <br />Where: L = taper length in feet <br /> W = width of offset in feet <br /> S = posted speed limit, off-peak 85th-percentile speed prior to work <br />starting, or the anticipated operating speed in mph <br />*** - Maximum downstream taper length is 100 feet. See Section 6C.08.
The URL can be used to link to this page
Your browser does not support the video tag.