Laserfiche WebLink
L <br />C <br />PHASE <br />T <br />7. <br />1n <br />O <br />IL <br />o0 <br />w <br />EL <br />O <br />O U <br />1 <br />9 <br />10 <br />I <br />2 <br />I 3 <br />o <br />DEVELOPER, GENERAL CONTRACTOR & ELECTRICAL CONTRACTOR PLEASE NOTE: <br />> <br />Y <br />N <br />LOC 9 & 11 PAD DETAIL <br />°I <br />°I <br />°I <br />°I <br />N <br />PLEASE CALL 2 WORKING DAYS IN ADVANCE: <br />Lu <br />N <br />��t.C4v, <br />C4 <br />3-1101&Y <br />qV <br />I:i <br />Of <br />PG&E UNDERGROUND INSPECTION DESK O <br />4 <br />45 <br />c <br />N <br />N <br />o <br />� <br />c <br />O <br />CINE <br />pN� <br />CINE� <br />141 <br />c <br />O <br />v <br />rn <br />FOR JOB SCHEDULING INFORMATION PLEASE CALL PG&E <br />a <br />Lu <br />z <br />LAND RIGHTS AND EASMENTS: <br />3-0 12W <br />rA <br />• <br />4 <br />OL 7 <br />10 <br />IF THERE ARE CONFLICTS BETWEEN LANDSCAPINGS <br />L; <br />• FIXED BARRIER POST <br />(MOUNDS, BERMS, TREES, BUSHES,..) AND SUBSTRUCTURE <br />0 <br />y <br />INSTALLATIONS (SPLICE BOXES, TRANSFORMER PAD,..) <br />SAFETY AND WORKMANSHIP: <br />z <br />a <br />'c <br />c <br />15) CALL 811 (UNDERGROUND SERVICE AIM 48 HOURS PRIOR TO EXCAVATION FOR UNDERGROUND UTILITY <br />M <br />LOCATION WIRIONG. <br />M <br />UL <br />3-1/BA EPR 13Y 4 <br />• <br />E <br />u <br />LO <br />3-1 A EPR 12IN <br />N5 <br />PLACEMENT AND NEED OF BARRIERS <br />gs <br />Y8$ <br />• gJ Ig <br />8 <br />n <br />MORADA PRODUCE <br />11 , <br />1 <br />2 <br />4 <br />A EPR 13N W r <br />KN/J <br />Iffing <br />ff/49 <br />I= <br />2071/42 <br />5 <br />7 <br />FUTURE 4000A MN <br />LOCATION. WITHIN 2 YEARS <br />FEED FROM NEW J <br />10 <br />CUSTOMER TO INSTALL 20' 7-5' CONDUITS PER <br />DWG 063928. PG&E TO INSTALL 35 CIRCUIT <br />FEET 6 SETS 1000CU QPX CABLE <br />T540964 <br />n <br />COORDINATE <br />10000000249s2 <br />LOADING DISTRICT <br />TX SIZE -I= <br />WA1e- <br />KVA 30 - 997 <br />SLF. -9D <br />/ TX O 37.97601 -121.14440 <br />O <br />CUSTOMER TO INSTALL 4' CONDUIT PER GREEN BOOK SECTION 3. <br />3' MIN, RADIUS VERTICAL AND 5' MIN, RADIUS HORIZONTAL BENDS. <br />PG&E TO INSTALL 25 CIRCUIT FEET 3-t/OA <br />EPR-CONC-ENCAP PE 12KV CABLE. <br />INSTALL 45'CL 3 JOINT POLE PER PG180123XT-2 eL <br />INSTALL J45087• <br />SET MIN 7' DEEP O 37.97599 -121.14440 <br />INSTALL 900A SCADA UAB SW 717053 PER TD -0762538-001 WITH SEL-70OGT OPTION KIT. I <br />O 37.97509 -121.14894 <br />i <br />INSTALL 50'CL3 POLE 5' N/0 & 13' E/0 CORNER POST. I <br />INSTALL 20M ANCHOR 17 LEAD, 900A USB BYPASS SWATCH 298947. <br />AND NOVA SCADA RECLOSER 773114 WITH PT 57HSB DISC 899167. i <br />O 37.97484 -121.14867 I <br />INSTALL 55 -CI -4 POLE 5' N/0 FENCE <br />INSTALL 50'CL4 POLE 5' N/0 FENCE INSTALL 50'CL4 POLE 5' N/0 FENCE O 37.97489 -121.14539 2 CUSTOMER <br />O 37.97485 -121.14758 O 37.97487 -121.14648 <br />3' MIN. R <br />PG&E TO <br />2 EPR -CON <br />m I <br />6 <br />I <br />3P5_ _ O <br />315' p�pPP� P P S <br />-PSP_ P315 P�p-PP�P�P-P� 7 <br />P 3P5_P_P_p P <br />LARGE WALNUT TREES <br />C 3 ) O <br />FA <br />O <br />PG&E TO INSTALL 1340 CIRCUIT FEET <br />3-4/OA 12KV ALL ON APPLICANT'S PR <br />384 <br />,49 <br />6 <br />INSTALL AS BETTERMENT 45'CI_ H2 POLE SETT DEEP PER PG180123XT-1. <br />TRANSFER PT CABLES REMOVE m'CI.4 PG030041-3 <br />SET & SOLD 2003 23' OR. CAN O 24'. <br />O 37.97472 -121.14894 <br />FOREMAN NOTE: CONTACT Steve Jackson, Planner, <br />3 weeks prior for Recloser settings at 559-263-7348. <br />LOCATION 8 <br />RISER DETAIL <br />NTS <br />I I4' COIDUT <br />IFN POLE <br />TO IN a CONDUIT PER GREEN BOOK SECTION 3. <br />RA VERTICAL AND 5' MIN. RADIUS HORIZONTAL BENDS. <br />INSTALL 455 CIRCUIT FEET 3-1/OA <br />C-ENCAP PE 12KV CABLE ALL ON APPLICANT'S PROPERTY. <br />8 <br />9 <br />10 <br />c <br />�-12CEO <br />10) CONDUITS ENTERING PRIMARY BOXES SWILL BE AT A RIGHT ANGLE TO THE WINDOW OR WNL <br />o <br />DEVELOPER, GENERAL CONTRACTOR & ELECTRICAL CONTRACTOR PLEASE NOTE: <br />> <br />Y <br />N <br />LOC 9 & 11 PAD DETAIL <br />°I <br />°I <br />°I <br />°I <br />N <br />PLEASE CALL 2 WORKING DAYS IN ADVANCE: <br />Lu <br />N <br />��t.C4v, <br />C4 <br />g�i <br />I:i <br />Of <br />PG&E UNDERGROUND INSPECTION DESK O <br />NTS <br />W <br />c <br />N <br />N <br />o <br />� <br />c <br />O <br />CINE <br />pN� <br />CINE� <br />c <br />O <br />v <br />rn <br />FOR JOB SCHEDULING INFORMATION PLEASE CALL PG&E <br />Lu <br />H <br />LAND RIGHTS AND EASMENTS: <br />PROJECT MANAGER: BRAD JOAQUIN O 209-272-8618 <br />O <br />0 REMOVABLE BARRIER POST <br />14) APPLICANT TO PROVIDE ADEQUATE P.U.E'S AND/OR ROW'S FOR PG&E FACILITIES. ANY ADDITIONAL REQUIRED <br />IF THERE ARE CONFLICTS BETWEEN LANDSCAPINGS <br />RIGHTS OF WAY ARE TO BE SURVEYED AND DOCUMENTED BY PG&E AT THE APPLICANT'S EXPENSE. <br />• FIXED BARRIER POST <br />(MOUNDS, BERMS, TREES, BUSHES,..) AND SUBSTRUCTURE <br />0 <br />Io <br />INSTALLATIONS (SPLICE BOXES, TRANSFORMER PAD,..) <br />SAFETY AND WORKMANSHIP: <br />Q <br />a <br />'c <br />c <br />15) CALL 811 (UNDERGROUND SERVICE AIM 48 HOURS PRIOR TO EXCAVATION FOR UNDERGROUND UTILITY <br />� <br />C) <br />LOCATION WIRIONG. <br />M <br />INSPECTOR SHALL DETERMINEv <br />E <br />u <br />LO <br />PLACEMENT AND NEED OF BARRIERS <br />c <br />n <br />V <br />E47 <br />O <br />O <br />c <br />Sj <br />2500A MN <br />cc <br />tt 277/480V 30 <br />L11 <br />CL <br />W <br />a <br />z <br />Sd <br />y <br />RE <br />5.OVd <br />FUTURE 2500A MN <br />LOCATION. WITHIN 5 YEARS <br />FEED OH FROM LOC 6 <br />16" 42" <br />• <br />106' <br />G- 24" <br />to <br />CODE 040292 <br />DWG 045292 SH 8 <br />n <br />:7 <br />STUB OUT <br />4' CONDUIT <br />FOR FUTURE <br />42"01240 <br />I <br />o • <br />o t <br />36" <br />3 WARE J PAD <br />CODE 360038 PER -4 <br />• DWG 066212 ^; <br />36" <br />0 <br />N <br />L;• <br />a� <br />42 42" 4 " 27' <br />. <br />I <br />a <br />IL y <br />O <br />NOTES: 09-18-13 y <br />REFER TO ELECTRIC & GAS SERVICE REQUIREMENTS (GREEN BOOK) OR SEPARATE PG&E STANDARD > o <br />DRAWINGS. CONTACT YOUR PG&E REPRESENTATIVE FOR COPIES, OR ACCESS www.pge.com/greenbook W <br />INSTALL 55'CL3 POLE 5' N/0 & 5' E/0 CORNER POST. <br />INSTALL 15M ANCHOR 1T LEAD AND PT 57HSB DISC 814833, CONDUIT, TRENCHING, AND BACKFILL: <br />O 37.97490 -121.14434 1) ALL DIMENSIONS AND LOCATIONS ARE ESTIMATED, APPROXIMATE ARD MAY BE SUPERSEDED BY A JOINT TRENCH <br />DRAWING. REFER TO THE JOINT TRENCH COMPOSITE DRAWING FOR EXACT TRENCH LOCATION <br />2) MAINTAIN MAXIMUM PRACTICABLE HOWZONTAL CLEARANCE BETWEEN PG&E FACILITIES AND VW UTILITIES (WATER, <br />SEWER. STORM DRAIN. ETC.). THE MIN. ALLOWABLE SEPARATION BETWEEN PG&E FACILITIES AND ANY PARALLEL 'WEY <br />UTILITY 6 3/FI. WITH A PRESENCE OF 1/Fr. OF UNDISTURBED EARTH OR THE INSTALLATION OF A SUITABLE BARRIER. <br />THIS MEASUREMENT 5 BETWEEN THE OUTER EDGE OF THE PGMME FACILITY AND THE OUTER EDGE OF THE PARALLEL <br />VEr FACILITY. IF 3/Fr. CANNOT BE MAINTAINED, A FORMAL VARIANCE MUST BE OBTAINED FROM PO&E WOR( WITH <br />THE PG&E INSPECTOR (REFERENCE PG&E UO STANDAR) S%53). <br />3) BOX, PAD, AND CONDUIT SIZES AND LOCATIONS SHALL COWORM TO THE PG&E ELECMC CDNSI wcnON DRAWING. <br />4) PROVIDE LONG CONDUIT SWEEPS WHERE INDICATED. RECOMMENDED SWEEP RADIUS (IV OF RADIUS PER INCH OF <br />CONDUIT DIAMETER) EXAMPLE V CONDUIT - 40' RADIUS -L4 <br />5) DO NOT EXCEED 300 DEGREES OF BENDS N ANY CONDUIT RUN (INCLUDING FEED LOCATION). NOTE SECONDARY <br />AND SERVICE RUNS OF 200 FEET OR LESS MAY HAVE UP TO 315 DEGREES OF BENDS (REFERENCE PG&E <br />DOCUMENT 038193, REV. 7. DATED 6-28-13). <br />6) MANUFACTURED BENDS OR APPLICATION OF HEAT SHALL NOT BE USED TO OBTAIN LONG CONDUIT SWEEPS <br />7) ALL CONDUITS SHALL BE PROVEN AND A POLYESTER PULLING TAPE INSTALLED. <br />8) MANUFACTURED BENDS ARE NOT TO BE CUT. SHORTENED. OR ALTERED IN ANY WAY. <br />9) IDENTIFY ENDS OF BURIED CONDUIT WITH AN ELECTRONIC MARKER AND A VERTICIL CONDUIT SCRAP INSTALLED <br />IMPORTANT! <br />FROM RIGID CLP TO GROUND LEVEL <br />! <br />c <br />10) CONDUITS ENTERING PRIMARY BOXES SWILL BE AT A RIGHT ANGLE TO THE WINDOW OR WNL <br />o <br />DEVELOPER, GENERAL CONTRACTOR & ELECTRICAL CONTRACTOR PLEASE NOTE: <br />> <br />Y <br />N <br />BEFORE BEGINNING TRENCHING AND SUBSTRUCTURE WORK, <br />AGENT IS TO EXCAVATE TO TRENCH DEPTH AND WALL A 30r DIAMETER CARDBOARD TUBE. THE RISER CONDUIT <br />Z <br />N <br />PLEASE CALL 2 WORKING DAYS IN ADVANCE: <br />Lu <br />C <br />g�i <br />I:i <br />PG&E UNDERGROUND INSPECTION DESK O <br />12) 1% STREET LIGHT CONDUIT GOING TO PG&E BOXES OR PEDESTALS NOT DESIGNATED AS P.O.S. <br />W <br />c <br />� <br />(INCLUDING TRANSFORMERS) WILL NOT BE ACCEPTED OR CONNECTED. <br />o <br />p <br />c <br />O <br />Lu <br />Z <br />c <br />O <br />v <br />rn <br />FOR JOB SCHEDULING INFORMATION PLEASE CALL PG&E <br />Lu <br />H <br />LAND RIGHTS AND EASMENTS: <br />PROJECT MANAGER: BRAD JOAQUIN O 209-272-8618 <br />O <br />Z <br />14) APPLICANT TO PROVIDE ADEQUATE P.U.E'S AND/OR ROW'S FOR PG&E FACILITIES. ANY ADDITIONAL REQUIRED <br />IL y <br />O <br />NOTES: 09-18-13 y <br />REFER TO ELECTRIC & GAS SERVICE REQUIREMENTS (GREEN BOOK) OR SEPARATE PG&E STANDARD > o <br />DRAWINGS. CONTACT YOUR PG&E REPRESENTATIVE FOR COPIES, OR ACCESS www.pge.com/greenbook W <br />INSTALL 55'CL3 POLE 5' N/0 & 5' E/0 CORNER POST. <br />INSTALL 15M ANCHOR 1T LEAD AND PT 57HSB DISC 814833, CONDUIT, TRENCHING, AND BACKFILL: <br />O 37.97490 -121.14434 1) ALL DIMENSIONS AND LOCATIONS ARE ESTIMATED, APPROXIMATE ARD MAY BE SUPERSEDED BY A JOINT TRENCH <br />DRAWING. REFER TO THE JOINT TRENCH COMPOSITE DRAWING FOR EXACT TRENCH LOCATION <br />2) MAINTAIN MAXIMUM PRACTICABLE HOWZONTAL CLEARANCE BETWEEN PG&E FACILITIES AND VW UTILITIES (WATER, <br />SEWER. STORM DRAIN. ETC.). THE MIN. ALLOWABLE SEPARATION BETWEEN PG&E FACILITIES AND ANY PARALLEL 'WEY <br />UTILITY 6 3/FI. WITH A PRESENCE OF 1/Fr. OF UNDISTURBED EARTH OR THE INSTALLATION OF A SUITABLE BARRIER. <br />THIS MEASUREMENT 5 BETWEEN THE OUTER EDGE OF THE PGMME FACILITY AND THE OUTER EDGE OF THE PARALLEL <br />VEr FACILITY. IF 3/Fr. CANNOT BE MAINTAINED, A FORMAL VARIANCE MUST BE OBTAINED FROM PO&E WOR( WITH <br />THE PG&E INSPECTOR (REFERENCE PG&E UO STANDAR) S%53). <br />3) BOX, PAD, AND CONDUIT SIZES AND LOCATIONS SHALL COWORM TO THE PG&E ELECMC CDNSI wcnON DRAWING. <br />4) PROVIDE LONG CONDUIT SWEEPS WHERE INDICATED. RECOMMENDED SWEEP RADIUS (IV OF RADIUS PER INCH OF <br />CONDUIT DIAMETER) EXAMPLE V CONDUIT - 40' RADIUS -L4 <br />5) DO NOT EXCEED 300 DEGREES OF BENDS N ANY CONDUIT RUN (INCLUDING FEED LOCATION). NOTE SECONDARY <br />AND SERVICE RUNS OF 200 FEET OR LESS MAY HAVE UP TO 315 DEGREES OF BENDS (REFERENCE PG&E <br />DOCUMENT 038193, REV. 7. DATED 6-28-13). <br />6) MANUFACTURED BENDS OR APPLICATION OF HEAT SHALL NOT BE USED TO OBTAIN LONG CONDUIT SWEEPS <br />7) ALL CONDUITS SHALL BE PROVEN AND A POLYESTER PULLING TAPE INSTALLED. <br />8) MANUFACTURED BENDS ARE NOT TO BE CUT. SHORTENED. OR ALTERED IN ANY WAY. <br />9) IDENTIFY ENDS OF BURIED CONDUIT WITH AN ELECTRONIC MARKER AND A VERTICIL CONDUIT SCRAP INSTALLED <br />IMPORTANT! <br />FROM RIGID CLP TO GROUND LEVEL <br />O <br />10) CONDUITS ENTERING PRIMARY BOXES SWILL BE AT A RIGHT ANGLE TO THE WINDOW OR WNL <br />DEVELOPER, GENERAL CONTRACTOR & ELECTRICAL CONTRACTOR PLEASE NOTE: <br />11) STUB CONDUITS AT RISER POLES N QUADRANTS AS SHOWN. AT IDENTIFIED POLE LOCATIONS, THE TRENCHING <br />N <br />BEFORE BEGINNING TRENCHING AND SUBSTRUCTURE WORK, <br />AGENT IS TO EXCAVATE TO TRENCH DEPTH AND WALL A 30r DIAMETER CARDBOARD TUBE. THE RISER CONDUIT <br />Z <br />PLEASE CALL 2 WORKING DAYS IN ADVANCE: <br />BEND IS TO BE PLACED OUTSIDE AND ADJACENT TO THE TUBE AT THE POLE QUADRANT INDICATED. BACKFILL <br />C <br />AROUND AND INSIDE TRIBE WITH CLEW NATIVE FILL <br />PG&E UNDERGROUND INSPECTION DESK O <br />12) 1% STREET LIGHT CONDUIT GOING TO PG&E BOXES OR PEDESTALS NOT DESIGNATED AS P.O.S. <br />W <br />c <br />(209) 272-8643 or StocktonDivisionlnspectionRequestOpge.com <br />(INCLUDING TRANSFORMERS) WILL NOT BE ACCEPTED OR CONNECTED. <br />p <br />c <br />O <br />13) ONLY ONE LS2 SIREEI LIGHT (P.03.) CONNECTION PER BOX OR PEDESTAL <br />Z <br />WORK NOT PROPERLY INSPECTED MAY BE REJECTED. <br />O <br />v <br />c <br />FOR JOB SCHEDULING INFORMATION PLEASE CALL PG&E <br />H <br />LAND RIGHTS AND EASMENTS: <br />PROJECT MANAGER: BRAD JOAQUIN O 209-272-8618 <br />O <br />Z <br />14) APPLICANT TO PROVIDE ADEQUATE P.U.E'S AND/OR ROW'S FOR PG&E FACILITIES. ANY ADDITIONAL REQUIRED <br />IF THERE ARE CONFLICTS BETWEEN LANDSCAPINGS <br />RIGHTS OF WAY ARE TO BE SURVEYED AND DOCUMENTED BY PG&E AT THE APPLICANT'S EXPENSE. <br />Q <br />(MOUNDS, BERMS, TREES, BUSHES,..) AND SUBSTRUCTURE <br />Io <br />INSTALLATIONS (SPLICE BOXES, TRANSFORMER PAD,..) <br />SAFETY AND WORKMANSHIP: <br />Q <br />PLEASE CONTACT THE INSPECTOR PRIOR TO INSTALLATION. <br />15) CALL 811 (UNDERGROUND SERVICE AIM 48 HOURS PRIOR TO EXCAVATION FOR UNDERGROUND UTILITY <br />� <br />C) <br />LOCATION WIRIONG. <br />M <br />16) 48 HDUR NOTICE REOUIRED FOR UNDERGROUND NSPECTIONI. <br />CONTACT UNDERGROUND SERVICE ALERT (U.S.A.) 17) MA,7MALS AND WORKMANSHIP SWILL BE FIRST QUALITY N EVERY RESPECT, PLUMB AND TRUE, AND AVOIDING <br />TO THE SPECIFIC REQUIREMENTS OF THE DRAWINGS AND THE ABOVE APPLICABLE NOTES AND SPECIFICATIONS. <br />2 WORKING DAYS PRIOR TO DIGGING 18) THE APPLICANT IS TO VERIFY ALL PROPOSED INSTALLATIONS, CONDITIONS & SPECIFICATIONS PRIOR TO <br />COMMENCING WITH ANY PORTION OF WORK. ANY DISCREPANCIES, DELETIONS OR INCO149SIENCES ARE TO BE <br />REPORTED TO THE PG&E REPRESENTATIVE IMMEDIATELY. THE APPLICANT SHALL COMPLY WITH ALL APPLICABLE <br />(800)227-2600 SPECIFICATIONS. ANY VARIATIONS FROM PLANS OR SPECIFICATIONS RELIEVES PG&E OF ALL RESPONSIBILITY FOR THE <br />SUBSTRUCTURE OR DESIGN. <br />5 5 4 3 2 <br />J <br />H <br />z <br />Lu <br />zw z <br />O Cn <br />5 Cn <br />Z Cn <br />w <br />1 INICH ' IO <br />