L
<br />C
<br />PHASE
<br />T
<br />7.
<br />1n
<br />O
<br />IL
<br />o0
<br />w
<br />EL
<br />O
<br />O U
<br />1
<br />9
<br />10
<br />I
<br />2
<br />I 3
<br />o
<br />DEVELOPER, GENERAL CONTRACTOR & ELECTRICAL CONTRACTOR PLEASE NOTE:
<br />>
<br />Y
<br />N
<br />LOC 9 & 11 PAD DETAIL
<br />°I
<br />°I
<br />°I
<br />°I
<br />N
<br />PLEASE CALL 2 WORKING DAYS IN ADVANCE:
<br />Lu
<br />N
<br />��t.C4v,
<br />C4
<br />3-1101&Y
<br />qV
<br />I:i
<br />Of
<br />PG&E UNDERGROUND INSPECTION DESK O
<br />4
<br />45
<br />c
<br />N
<br />N
<br />o
<br />�
<br />c
<br />O
<br />CINE
<br />pN�
<br />CINE�
<br />141
<br />c
<br />O
<br />v
<br />rn
<br />FOR JOB SCHEDULING INFORMATION PLEASE CALL PG&E
<br />a
<br />Lu
<br />z
<br />LAND RIGHTS AND EASMENTS:
<br />3-0 12W
<br />rA
<br />•
<br />4
<br />OL 7
<br />10
<br />IF THERE ARE CONFLICTS BETWEEN LANDSCAPINGS
<br />L;
<br />• FIXED BARRIER POST
<br />(MOUNDS, BERMS, TREES, BUSHES,..) AND SUBSTRUCTURE
<br />0
<br />y
<br />INSTALLATIONS (SPLICE BOXES, TRANSFORMER PAD,..)
<br />SAFETY AND WORKMANSHIP:
<br />z
<br />a
<br />'c
<br />c
<br />15) CALL 811 (UNDERGROUND SERVICE AIM 48 HOURS PRIOR TO EXCAVATION FOR UNDERGROUND UTILITY
<br />M
<br />LOCATION WIRIONG.
<br />M
<br />UL
<br />3-1/BA EPR 13Y 4
<br />•
<br />E
<br />u
<br />LO
<br />3-1 A EPR 12IN
<br />N5
<br />PLACEMENT AND NEED OF BARRIERS
<br />gs
<br />Y8$
<br />• gJ Ig
<br />8
<br />n
<br />MORADA PRODUCE
<br />11 ,
<br />1
<br />2
<br />4
<br />A EPR 13N W r
<br />KN/J
<br />Iffing
<br />ff/49
<br />I=
<br />2071/42
<br />5
<br />7
<br />FUTURE 4000A MN
<br />LOCATION. WITHIN 2 YEARS
<br />FEED FROM NEW J
<br />10
<br />CUSTOMER TO INSTALL 20' 7-5' CONDUITS PER
<br />DWG 063928. PG&E TO INSTALL 35 CIRCUIT
<br />FEET 6 SETS 1000CU QPX CABLE
<br />T540964
<br />n
<br />COORDINATE
<br />10000000249s2
<br />LOADING DISTRICT
<br />TX SIZE -I=
<br />WA1e-
<br />KVA 30 - 997
<br />SLF. -9D
<br />/ TX O 37.97601 -121.14440
<br />O
<br />CUSTOMER TO INSTALL 4' CONDUIT PER GREEN BOOK SECTION 3.
<br />3' MIN, RADIUS VERTICAL AND 5' MIN, RADIUS HORIZONTAL BENDS.
<br />PG&E TO INSTALL 25 CIRCUIT FEET 3-t/OA
<br />EPR-CONC-ENCAP PE 12KV CABLE.
<br />INSTALL 45'CL 3 JOINT POLE PER PG180123XT-2 eL
<br />INSTALL J45087•
<br />SET MIN 7' DEEP O 37.97599 -121.14440
<br />INSTALL 900A SCADA UAB SW 717053 PER TD -0762538-001 WITH SEL-70OGT OPTION KIT. I
<br />O 37.97509 -121.14894
<br />i
<br />INSTALL 50'CL3 POLE 5' N/0 & 13' E/0 CORNER POST. I
<br />INSTALL 20M ANCHOR 17 LEAD, 900A USB BYPASS SWATCH 298947.
<br />AND NOVA SCADA RECLOSER 773114 WITH PT 57HSB DISC 899167. i
<br />O 37.97484 -121.14867 I
<br />INSTALL 55 -CI -4 POLE 5' N/0 FENCE
<br />INSTALL 50'CL4 POLE 5' N/0 FENCE INSTALL 50'CL4 POLE 5' N/0 FENCE O 37.97489 -121.14539 2 CUSTOMER
<br />O 37.97485 -121.14758 O 37.97487 -121.14648
<br />3' MIN. R
<br />PG&E TO
<br />2 EPR -CON
<br />m I
<br />6
<br />I
<br />3P5_ _ O
<br />315' p�pPP� P P S
<br />-PSP_ P315 P�p-PP�P�P-P� 7
<br />P 3P5_P_P_p P
<br />LARGE WALNUT TREES
<br />C 3 ) O
<br />FA
<br />O
<br />PG&E TO INSTALL 1340 CIRCUIT FEET
<br />3-4/OA 12KV ALL ON APPLICANT'S PR
<br />384
<br />,49
<br />6
<br />INSTALL AS BETTERMENT 45'CI_ H2 POLE SETT DEEP PER PG180123XT-1.
<br />TRANSFER PT CABLES REMOVE m'CI.4 PG030041-3
<br />SET & SOLD 2003 23' OR. CAN O 24'.
<br />O 37.97472 -121.14894
<br />FOREMAN NOTE: CONTACT Steve Jackson, Planner,
<br />3 weeks prior for Recloser settings at 559-263-7348.
<br />LOCATION 8
<br />RISER DETAIL
<br />NTS
<br />I I4' COIDUT
<br />IFN POLE
<br />TO IN a CONDUIT PER GREEN BOOK SECTION 3.
<br />RA VERTICAL AND 5' MIN. RADIUS HORIZONTAL BENDS.
<br />INSTALL 455 CIRCUIT FEET 3-1/OA
<br />C-ENCAP PE 12KV CABLE ALL ON APPLICANT'S PROPERTY.
<br />8
<br />9
<br />10
<br />c
<br />�-12CEO
<br />10) CONDUITS ENTERING PRIMARY BOXES SWILL BE AT A RIGHT ANGLE TO THE WINDOW OR WNL
<br />o
<br />DEVELOPER, GENERAL CONTRACTOR & ELECTRICAL CONTRACTOR PLEASE NOTE:
<br />>
<br />Y
<br />N
<br />LOC 9 & 11 PAD DETAIL
<br />°I
<br />°I
<br />°I
<br />°I
<br />N
<br />PLEASE CALL 2 WORKING DAYS IN ADVANCE:
<br />Lu
<br />N
<br />��t.C4v,
<br />C4
<br />g�i
<br />I:i
<br />Of
<br />PG&E UNDERGROUND INSPECTION DESK O
<br />NTS
<br />W
<br />c
<br />N
<br />N
<br />o
<br />�
<br />c
<br />O
<br />CINE
<br />pN�
<br />CINE�
<br />c
<br />O
<br />v
<br />rn
<br />FOR JOB SCHEDULING INFORMATION PLEASE CALL PG&E
<br />Lu
<br />H
<br />LAND RIGHTS AND EASMENTS:
<br />PROJECT MANAGER: BRAD JOAQUIN O 209-272-8618
<br />O
<br />0 REMOVABLE BARRIER POST
<br />14) APPLICANT TO PROVIDE ADEQUATE P.U.E'S AND/OR ROW'S FOR PG&E FACILITIES. ANY ADDITIONAL REQUIRED
<br />IF THERE ARE CONFLICTS BETWEEN LANDSCAPINGS
<br />RIGHTS OF WAY ARE TO BE SURVEYED AND DOCUMENTED BY PG&E AT THE APPLICANT'S EXPENSE.
<br />• FIXED BARRIER POST
<br />(MOUNDS, BERMS, TREES, BUSHES,..) AND SUBSTRUCTURE
<br />0
<br />Io
<br />INSTALLATIONS (SPLICE BOXES, TRANSFORMER PAD,..)
<br />SAFETY AND WORKMANSHIP:
<br />Q
<br />a
<br />'c
<br />c
<br />15) CALL 811 (UNDERGROUND SERVICE AIM 48 HOURS PRIOR TO EXCAVATION FOR UNDERGROUND UTILITY
<br />�
<br />C)
<br />LOCATION WIRIONG.
<br />M
<br />INSPECTOR SHALL DETERMINEv
<br />E
<br />u
<br />LO
<br />PLACEMENT AND NEED OF BARRIERS
<br />c
<br />n
<br />V
<br />E47
<br />O
<br />O
<br />c
<br />Sj
<br />2500A MN
<br />cc
<br />tt 277/480V 30
<br />L11
<br />CL
<br />W
<br />a
<br />z
<br />Sd
<br />y
<br />RE
<br />5.OVd
<br />FUTURE 2500A MN
<br />LOCATION. WITHIN 5 YEARS
<br />FEED OH FROM LOC 6
<br />16" 42"
<br />•
<br />106'
<br />G- 24"
<br />to
<br />CODE 040292
<br />DWG 045292 SH 8
<br />n
<br />:7
<br />STUB OUT
<br />4' CONDUIT
<br />FOR FUTURE
<br />42"01240
<br />I
<br />o •
<br />o t
<br />36"
<br />3 WARE J PAD
<br />CODE 360038 PER -4
<br />• DWG 066212 ^;
<br />36"
<br />0
<br />N
<br />L;•
<br />a�
<br />42 42" 4 " 27'
<br />.
<br />I
<br />a
<br />IL y
<br />O
<br />NOTES: 09-18-13 y
<br />REFER TO ELECTRIC & GAS SERVICE REQUIREMENTS (GREEN BOOK) OR SEPARATE PG&E STANDARD > o
<br />DRAWINGS. CONTACT YOUR PG&E REPRESENTATIVE FOR COPIES, OR ACCESS www.pge.com/greenbook W
<br />INSTALL 55'CL3 POLE 5' N/0 & 5' E/0 CORNER POST.
<br />INSTALL 15M ANCHOR 1T LEAD AND PT 57HSB DISC 814833, CONDUIT, TRENCHING, AND BACKFILL:
<br />O 37.97490 -121.14434 1) ALL DIMENSIONS AND LOCATIONS ARE ESTIMATED, APPROXIMATE ARD MAY BE SUPERSEDED BY A JOINT TRENCH
<br />DRAWING. REFER TO THE JOINT TRENCH COMPOSITE DRAWING FOR EXACT TRENCH LOCATION
<br />2) MAINTAIN MAXIMUM PRACTICABLE HOWZONTAL CLEARANCE BETWEEN PG&E FACILITIES AND VW UTILITIES (WATER,
<br />SEWER. STORM DRAIN. ETC.). THE MIN. ALLOWABLE SEPARATION BETWEEN PG&E FACILITIES AND ANY PARALLEL 'WEY
<br />UTILITY 6 3/FI. WITH A PRESENCE OF 1/Fr. OF UNDISTURBED EARTH OR THE INSTALLATION OF A SUITABLE BARRIER.
<br />THIS MEASUREMENT 5 BETWEEN THE OUTER EDGE OF THE PGMME FACILITY AND THE OUTER EDGE OF THE PARALLEL
<br />VEr FACILITY. IF 3/Fr. CANNOT BE MAINTAINED, A FORMAL VARIANCE MUST BE OBTAINED FROM PO&E WOR( WITH
<br />THE PG&E INSPECTOR (REFERENCE PG&E UO STANDAR) S%53).
<br />3) BOX, PAD, AND CONDUIT SIZES AND LOCATIONS SHALL COWORM TO THE PG&E ELECMC CDNSI wcnON DRAWING.
<br />4) PROVIDE LONG CONDUIT SWEEPS WHERE INDICATED. RECOMMENDED SWEEP RADIUS (IV OF RADIUS PER INCH OF
<br />CONDUIT DIAMETER) EXAMPLE V CONDUIT - 40' RADIUS -L4
<br />5) DO NOT EXCEED 300 DEGREES OF BENDS N ANY CONDUIT RUN (INCLUDING FEED LOCATION). NOTE SECONDARY
<br />AND SERVICE RUNS OF 200 FEET OR LESS MAY HAVE UP TO 315 DEGREES OF BENDS (REFERENCE PG&E
<br />DOCUMENT 038193, REV. 7. DATED 6-28-13).
<br />6) MANUFACTURED BENDS OR APPLICATION OF HEAT SHALL NOT BE USED TO OBTAIN LONG CONDUIT SWEEPS
<br />7) ALL CONDUITS SHALL BE PROVEN AND A POLYESTER PULLING TAPE INSTALLED.
<br />8) MANUFACTURED BENDS ARE NOT TO BE CUT. SHORTENED. OR ALTERED IN ANY WAY.
<br />9) IDENTIFY ENDS OF BURIED CONDUIT WITH AN ELECTRONIC MARKER AND A VERTICIL CONDUIT SCRAP INSTALLED
<br />IMPORTANT!
<br />FROM RIGID CLP TO GROUND LEVEL
<br />!
<br />c
<br />10) CONDUITS ENTERING PRIMARY BOXES SWILL BE AT A RIGHT ANGLE TO THE WINDOW OR WNL
<br />o
<br />DEVELOPER, GENERAL CONTRACTOR & ELECTRICAL CONTRACTOR PLEASE NOTE:
<br />>
<br />Y
<br />N
<br />BEFORE BEGINNING TRENCHING AND SUBSTRUCTURE WORK,
<br />AGENT IS TO EXCAVATE TO TRENCH DEPTH AND WALL A 30r DIAMETER CARDBOARD TUBE. THE RISER CONDUIT
<br />Z
<br />N
<br />PLEASE CALL 2 WORKING DAYS IN ADVANCE:
<br />Lu
<br />C
<br />g�i
<br />I:i
<br />PG&E UNDERGROUND INSPECTION DESK O
<br />12) 1% STREET LIGHT CONDUIT GOING TO PG&E BOXES OR PEDESTALS NOT DESIGNATED AS P.O.S.
<br />W
<br />c
<br />�
<br />(INCLUDING TRANSFORMERS) WILL NOT BE ACCEPTED OR CONNECTED.
<br />o
<br />p
<br />c
<br />O
<br />Lu
<br />Z
<br />c
<br />O
<br />v
<br />rn
<br />FOR JOB SCHEDULING INFORMATION PLEASE CALL PG&E
<br />Lu
<br />H
<br />LAND RIGHTS AND EASMENTS:
<br />PROJECT MANAGER: BRAD JOAQUIN O 209-272-8618
<br />O
<br />Z
<br />14) APPLICANT TO PROVIDE ADEQUATE P.U.E'S AND/OR ROW'S FOR PG&E FACILITIES. ANY ADDITIONAL REQUIRED
<br />IL y
<br />O
<br />NOTES: 09-18-13 y
<br />REFER TO ELECTRIC & GAS SERVICE REQUIREMENTS (GREEN BOOK) OR SEPARATE PG&E STANDARD > o
<br />DRAWINGS. CONTACT YOUR PG&E REPRESENTATIVE FOR COPIES, OR ACCESS www.pge.com/greenbook W
<br />INSTALL 55'CL3 POLE 5' N/0 & 5' E/0 CORNER POST.
<br />INSTALL 15M ANCHOR 1T LEAD AND PT 57HSB DISC 814833, CONDUIT, TRENCHING, AND BACKFILL:
<br />O 37.97490 -121.14434 1) ALL DIMENSIONS AND LOCATIONS ARE ESTIMATED, APPROXIMATE ARD MAY BE SUPERSEDED BY A JOINT TRENCH
<br />DRAWING. REFER TO THE JOINT TRENCH COMPOSITE DRAWING FOR EXACT TRENCH LOCATION
<br />2) MAINTAIN MAXIMUM PRACTICABLE HOWZONTAL CLEARANCE BETWEEN PG&E FACILITIES AND VW UTILITIES (WATER,
<br />SEWER. STORM DRAIN. ETC.). THE MIN. ALLOWABLE SEPARATION BETWEEN PG&E FACILITIES AND ANY PARALLEL 'WEY
<br />UTILITY 6 3/FI. WITH A PRESENCE OF 1/Fr. OF UNDISTURBED EARTH OR THE INSTALLATION OF A SUITABLE BARRIER.
<br />THIS MEASUREMENT 5 BETWEEN THE OUTER EDGE OF THE PGMME FACILITY AND THE OUTER EDGE OF THE PARALLEL
<br />VEr FACILITY. IF 3/Fr. CANNOT BE MAINTAINED, A FORMAL VARIANCE MUST BE OBTAINED FROM PO&E WOR( WITH
<br />THE PG&E INSPECTOR (REFERENCE PG&E UO STANDAR) S%53).
<br />3) BOX, PAD, AND CONDUIT SIZES AND LOCATIONS SHALL COWORM TO THE PG&E ELECMC CDNSI wcnON DRAWING.
<br />4) PROVIDE LONG CONDUIT SWEEPS WHERE INDICATED. RECOMMENDED SWEEP RADIUS (IV OF RADIUS PER INCH OF
<br />CONDUIT DIAMETER) EXAMPLE V CONDUIT - 40' RADIUS -L4
<br />5) DO NOT EXCEED 300 DEGREES OF BENDS N ANY CONDUIT RUN (INCLUDING FEED LOCATION). NOTE SECONDARY
<br />AND SERVICE RUNS OF 200 FEET OR LESS MAY HAVE UP TO 315 DEGREES OF BENDS (REFERENCE PG&E
<br />DOCUMENT 038193, REV. 7. DATED 6-28-13).
<br />6) MANUFACTURED BENDS OR APPLICATION OF HEAT SHALL NOT BE USED TO OBTAIN LONG CONDUIT SWEEPS
<br />7) ALL CONDUITS SHALL BE PROVEN AND A POLYESTER PULLING TAPE INSTALLED.
<br />8) MANUFACTURED BENDS ARE NOT TO BE CUT. SHORTENED. OR ALTERED IN ANY WAY.
<br />9) IDENTIFY ENDS OF BURIED CONDUIT WITH AN ELECTRONIC MARKER AND A VERTICIL CONDUIT SCRAP INSTALLED
<br />IMPORTANT!
<br />FROM RIGID CLP TO GROUND LEVEL
<br />O
<br />10) CONDUITS ENTERING PRIMARY BOXES SWILL BE AT A RIGHT ANGLE TO THE WINDOW OR WNL
<br />DEVELOPER, GENERAL CONTRACTOR & ELECTRICAL CONTRACTOR PLEASE NOTE:
<br />11) STUB CONDUITS AT RISER POLES N QUADRANTS AS SHOWN. AT IDENTIFIED POLE LOCATIONS, THE TRENCHING
<br />N
<br />BEFORE BEGINNING TRENCHING AND SUBSTRUCTURE WORK,
<br />AGENT IS TO EXCAVATE TO TRENCH DEPTH AND WALL A 30r DIAMETER CARDBOARD TUBE. THE RISER CONDUIT
<br />Z
<br />PLEASE CALL 2 WORKING DAYS IN ADVANCE:
<br />BEND IS TO BE PLACED OUTSIDE AND ADJACENT TO THE TUBE AT THE POLE QUADRANT INDICATED. BACKFILL
<br />C
<br />AROUND AND INSIDE TRIBE WITH CLEW NATIVE FILL
<br />PG&E UNDERGROUND INSPECTION DESK O
<br />12) 1% STREET LIGHT CONDUIT GOING TO PG&E BOXES OR PEDESTALS NOT DESIGNATED AS P.O.S.
<br />W
<br />c
<br />(209) 272-8643 or StocktonDivisionlnspectionRequestOpge.com
<br />(INCLUDING TRANSFORMERS) WILL NOT BE ACCEPTED OR CONNECTED.
<br />p
<br />c
<br />O
<br />13) ONLY ONE LS2 SIREEI LIGHT (P.03.) CONNECTION PER BOX OR PEDESTAL
<br />Z
<br />WORK NOT PROPERLY INSPECTED MAY BE REJECTED.
<br />O
<br />v
<br />c
<br />FOR JOB SCHEDULING INFORMATION PLEASE CALL PG&E
<br />H
<br />LAND RIGHTS AND EASMENTS:
<br />PROJECT MANAGER: BRAD JOAQUIN O 209-272-8618
<br />O
<br />Z
<br />14) APPLICANT TO PROVIDE ADEQUATE P.U.E'S AND/OR ROW'S FOR PG&E FACILITIES. ANY ADDITIONAL REQUIRED
<br />IF THERE ARE CONFLICTS BETWEEN LANDSCAPINGS
<br />RIGHTS OF WAY ARE TO BE SURVEYED AND DOCUMENTED BY PG&E AT THE APPLICANT'S EXPENSE.
<br />Q
<br />(MOUNDS, BERMS, TREES, BUSHES,..) AND SUBSTRUCTURE
<br />Io
<br />INSTALLATIONS (SPLICE BOXES, TRANSFORMER PAD,..)
<br />SAFETY AND WORKMANSHIP:
<br />Q
<br />PLEASE CONTACT THE INSPECTOR PRIOR TO INSTALLATION.
<br />15) CALL 811 (UNDERGROUND SERVICE AIM 48 HOURS PRIOR TO EXCAVATION FOR UNDERGROUND UTILITY
<br />�
<br />C)
<br />LOCATION WIRIONG.
<br />M
<br />16) 48 HDUR NOTICE REOUIRED FOR UNDERGROUND NSPECTIONI.
<br />CONTACT UNDERGROUND SERVICE ALERT (U.S.A.) 17) MA,7MALS AND WORKMANSHIP SWILL BE FIRST QUALITY N EVERY RESPECT, PLUMB AND TRUE, AND AVOIDING
<br />TO THE SPECIFIC REQUIREMENTS OF THE DRAWINGS AND THE ABOVE APPLICABLE NOTES AND SPECIFICATIONS.
<br />2 WORKING DAYS PRIOR TO DIGGING 18) THE APPLICANT IS TO VERIFY ALL PROPOSED INSTALLATIONS, CONDITIONS & SPECIFICATIONS PRIOR TO
<br />COMMENCING WITH ANY PORTION OF WORK. ANY DISCREPANCIES, DELETIONS OR INCO149SIENCES ARE TO BE
<br />REPORTED TO THE PG&E REPRESENTATIVE IMMEDIATELY. THE APPLICANT SHALL COMPLY WITH ALL APPLICABLE
<br />(800)227-2600 SPECIFICATIONS. ANY VARIATIONS FROM PLANS OR SPECIFICATIONS RELIEVES PG&E OF ALL RESPONSIBILITY FOR THE
<br />SUBSTRUCTURE OR DESIGN.
<br />5 5 4 3 2
<br />J
<br />H
<br />z
<br />Lu
<br />zw z
<br />O Cn
<br />5 Cn
<br />Z Cn
<br />w
<br />1 INICH ' IO
<br />
|