My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2020_PS-2002001 thru PS-2002500_ - PS-2002455
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2020
>
PS-2002001 thru PS-2002500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2020_PS-2002001 thru PS-2002500_ - PS-2002455
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2023 9:38:49 AM
Creation date
1/26/2023 9:31:54 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS2002455
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2020
Notes2
E/S of Manteca Rd. & S/S of Division Ave. Between Trahern Rd. and Two Rivers Rd.
Address
201 Flynn Rd., Camarillo,CA 93012
Application
Frontier CA Inc.
Type
Aerial Work & Trenching
Supplemental fields
Cross Ref
PWP110005
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DWG BY:DATE:WIRE CENTER NAME:FRONTIER WORK ORDERSCALE:W.O. TITLE:AND DESCRIPTIONSHEETNTS05/05/2020 01 OF 12CYIENT70228WO848720_5261000CITYMANTECATRAFFIC CONTROL PLAN GENERAL NOTESA. IT IS THE RESPONSIBILITY OF THE CONTRACTOR PERFORMING WORK ON A PUBLIC STREET TO INSTALL AND MAINTAIN THE TRAFFIC CONTROL DEVICES AS SHOWN HEREIN, AS WELL AS ANY SUCH ADDITIONAL TRAFFIC CONTROL DEVICES AS MAY BE REQUIRED TO ENSURE THE SAFE MOVEMENT OF TRAFFIC AND PEDESTRIANS THROUGH OR AROUND THE CLOSURE AREA AND PROVIDE MAXIMUM PROTECTION AND SAFETY TO CONSTRUCTION WORKERS.B. CONTRACTOR SHALL LEAVE ACCESS OPEN TO DRIVEWAYS AT ALL TIMES.C. ALL DELINEATORS SHALL BE EQUIPPED WITH REFLECTIVE BAND AT NIGHT TIME.D. ALL WARNING SIGNS SHALL BE EQUIPPED WITH FLASHING YELLOW WARNING LIGHTS FOR ANY NIGHTTIME OPERATIONS.E. ALL SIGNS, CONES, DELINEATORS, BARRICADES, ETC. AND THEIR INSTALLATION SHALL CONFORM TO CALIFORNIA MANUAL OF TRAFFIC CONTROL DEVICES (CAMUTCD) LATEST EDITION.F. CONTRACTOR SHALL PROVIDE FLAGGERS AS DEEMED NECESSARY.G. ALL TEMPORARY TRAFFIC CONTROL DEVICES SHALL BE REMOVED FOLLOWING COMPLETION OF EACH CONSTRUCTION STAGE AND PERMANENT TRAFFIC CONTROL DEVICES SHALL BE RESTORED BY THE CONTRACTOR UPON COMPLETION OF PROJECT.H. CONTRACTOR SHALL MAINTAIN SAFE PEDESTRIAN ACCESS AT ALL TIMES.I. CONTRACTOR SHALL COVER OR REMOVE ALL CONFLICTING SIGNS.VICINITY MAPLASHING OF NEW FIBER TO NEW STRANDALONG MANTECA RD AND DIVISION RDFROM TRAHERN RD TO 2 RIVERS RDPHASE 01 & 02LAT: 37.707267LONG: -121.214985PHASE 03LAT: 37.702853LONG: -121.214960PHASE 04LAT: 37.698936LONG: -121.214941PHASE 05LAT: 37.693282LONG: -121.214914PHASE 06LAT: 37.688963LONG: -121.220642PHASE 07LAT: 37.686124LONG: -121.222561PHASE 09LAT: 37.680818LONG: -121.227315PHASE 10LAT: 37.680487LONG: -121.228415PHASE 08LAT: 37.682856LONG: -121.225268PHASE 11LAT: 37.680634LONG: -121.234723
The URL can be used to link to this page
Your browser does not support the video tag.