Laserfiche WebLink
12020 CAF II OSP ESTIMATE - 49504STATE/WIRECENTER: CA/MANTECASITE NAME / #: TWO RIVERS /SITE#12SITE ADDRESS: TWO RIVERS ROAD & DIVISION ROAD, MANTECA, CA 95336SITE CLLI/EQ CLLI: MNTCCATR/MNTCCATRH02SHAREPOINT CLLI: MNTCCATRLAT/LONG: 37.682885, -121.238037CO/OA/EXCHANGE/BLDG: 152/001/70228/28507COMPANY/PLANT/SUB: 9WP-4784-413EQ TYPE/CAB TYPE: 7367 SX-48V/ COOLPEDFIBER FOOTAGE: 14,800'RELATED PROJECTS: ISP EST 49421IN SERV TARGET DATE: 8/2020POWER REQUIRED: NOEXISTING SITE, NO POWER REQUIREDPERMITS REQUIRED: YES: PERMITS TYPE: SAN JOAQUIN COUNTYPERMIT SUBMISSION DATE:IPTV/VANTAGE TV MARKET: NFOA=Y/N: NOSPARE EQUIPMENT: NO SPARE EQUIPMRNTUPSTREAM PROJECT: NOACCOUNT CODES: 2221.201, 2422.201, 2411.001, 2441.001JUSTIFICATION CODE: 08LINK CODE: CAFPHASEII**DSLAM ENGINEERED FOR 10/1 SPEED FOR CAF II CUSTOMERS TO 10KFT**WHAT:THIS PROJECT PROVIDES FOR THE PLACEMENT AND SPLICING OF FIBER AND HAND HOLE TO A PROPOSED DSLAM SITE AT THE EXISTING LOCATION ON TWO RIVERS RD & DIVISION RD.WHY:CAF II IS A STRATEGIC PLAN THAT FRONTIER IS PARTICIPATING IN TO PROVIDE ADDITIONAL BANDWIDTH AND NEW HSI TO CUSTOMERS THAT CURRENTLY DO NOT HAVE BROADBAND SERVICE.PLANNER: RANDY CROSLIN 209-239-0336OSP ENGINEER: JAMES CARTER 209-239-0655ISP ENGINEER: MATT BUSCH 916-512-4011PROJECT MANAGER: THERESA YAMAMOTO 805-484-3179ENGINEERING NOTES:PLACE NEW 144F FROM S. MANTECA RD & TRAHERN SOUTH ON S MANTECA RD TO DIVISION RD, THEN SW ON DIVISION TO THE RT SITE AT TWO RIVERS & DIVISION, USE THE EXISTING AERIAL POWER LEAD, THEN PLACEUNDERGROUND TO SITE FROM FIRST JP TO THE EAST OF SITE. ENERGIZE F0005,1-46. PLACE THE 6 PORT XPAC THAT WAS PURCHASED ON ASSOCIATED EQUIPMENT ESTIMATE 49421 FROM THE TERMINATION POINT OF THE 144 FIBERCABLE INTO THE NEW DSLAM. SPLICE STRANDS F0005,45-46 TO THE XPAC CABLE AND INTO THE DSLAM CABINET. F0005,45-46 IS LOCATED IN MNTCCAXG @ RR: 10501 MS: 27 POS: 45-46 ST-UPC. LEAVE 100' LOOPS EVERY 4,000 <br />' AND/OR ATINTERSECTIONS.AT THE PROPOSED LOCATION THE ASSOCIATED ISP PROJECT 49421 WILL PROVIDE CONDUITS, PADS AND ALL MISC MATERIAL AND LABOR TO ESTABLISH A COOLPED, AND AC POWER. PLACE A 400X24 COPPER CABLE FROM THECOOLPED TO THE 400PR CROSS CONNECT. THE XT WILL NEED TO BE REPLACED TO 900PR. SPLICE THE TAILS FROM THE SX-48V TO THE 400-24. SEE DERIVED COUNT BELOW, ALL COPPER COUNT NEEDS IN AND OUT OF NEW 900PR XT.NOK413:1-48+2XD. (POTS IN)NOK413:501-548+2XD. (POTS+DSL OUT)ONLY CHANNELS 1-48 AND 501-548 WILL BE EQUIPPED ON THIS PROJECT.THE SX-48V, COOLPED, & 6 PORT XPAC, WERE ORDERED ON ASSOCIATED EQUIPMENT ESTIMATE # 49421. THIS MATERIAL WILL NEED TO BE OBTAINED FROM THE COEI TEAM.THE COST ESTIMATE FOR THE SITE PREP WILL BE PROVIDED TO THE ISP ENGINEER FOR ALL THE LABOR TO MOUNT THE EQUIPMENT COORDINATE THE CONNECTION OF THE POWER TRANSFER SWITCH AND AC OUTLETS IN THENEW DSLAM CABINET. OSP CONSTRUCTION WILL CHARGE ALL SITE PREP LABOR TO THE ASSOCIATED ISP PROJECT 49421. POWER FEED FROM PED TO CABINET IS 120V. WORK WITH THE T&P TEAM TO DETERMINE GROUNDINGREQUIREMENTSLABOR ESTIMATED HOURS:*NOTE ACTUALS TBD BY ENGINEERING280 ENGINEERING: 8281 PLACING: 192281 SPLICING 24343 PLANNING $2,500345 ENGINEERING 40MILESTONES:ENGINEERING COMPLETE: 04/03/2020IN-SERVICE: 8/28/20201:2.4UNITS / ACCT CODESREVISIONSENGR:DRAWN DATE:SCALE:TAX DISTRICT:PROJECTNUMBER:C.O. AREA:DWGOFCNTY:TWNSHP:RNG:SEC:FILE:TWO RIVERS ROAD & DIVISION ROADMANTECA_SITE#12_5261000_OSP.DWGPHONE:EXCH. CODE:------------------JAMES CARTER209-239-0655MANTECA70228SAN JOAQUIN5261000CA CAF II MANTECA SITE #123/18/2020--