Laserfiche WebLink
1:100UNITS / ACCT CODESREVISIONSENGR:DRAWN DATE:SCALE:TAX DISTRICT:PROJECTNUMBER:C.O. AREA:DWGOFCNTY:TWNSHP:RNG:SEC:FILE:COMSTOCK RD & COX RDLINDEN_SITE_03_COMSTOCK RD & COXRD_5262350_OSP.DWGPHONE:EXCH. CODE:------------------JIMMY CARTER209-239-0655LINDEN70221SAN JOAQUIN5262350CA CAF II LINDEN SITE 305/18/2020--2020 CAF II OSP ESTIMATE - XXXXSTATE/WIRECENTER: CA/LINDENSITE NAME / #: COMSTOCK RD & COX RD/SITE #3SITE ADDRESS: COMSTOCK RD & COX RD, LINDEN, CA 95236SITE CLLI/EQ CLLI: LNDNCABJ/LNDNCABJH00LAT/LONG: 38.045135, -121.082544CO/OA/EXCHANGE/BLDG: 152/001/70221/29931COMPANY/PLANT/SUB: 9WP-4626-703EQ TYPE/CAB TYPE: 7367 SX-48V/COOLPEDFIBER FOOTAGE: 6,400'RELATED PROJECTS: ISP EST 50997IN SERV TARGET DATE: 9/2020POWER REQUIRED: YESNEW SITE, POWER REQUIRED: LINE POWERPERMITS REQUIRED: YES: PERMITS TYPE: COUNTYPERMIT SUBMISSION DATE:IPTV/VANTAGE TV MARKET: NFOA=Y/N: NOUPSTREAM PROJECT: NOACCOUNT CODES: 2232.501JUSTIFICATION CODE: 08LINK CODE: CAFPHASEII**DSLAM ENGINEERED FOR 10/1 SPEED FOR CAF II CUSTOMERS TO 10KFT**WHAT:THIS PROJECT PROVIDES FOR THE PLACEMENT AND SPLICING OF FIBER AND HAND HOLE TO A PROPOSED DSLAM SITE AT COMSTOCK RD & COX RD. THIS PROJECT ALSO PROVIDES FOR SITE PREPEST TO ADD A COOLPED CABINET E/W SX-48 DSL OVERLAY EQUIPMENT.WHY:CAF II IS A STRATEGIC PLAN THAT FRONTIER IS PARTICIPATING IN TO PROVIDE ADDITIONAL BANDWIDTH AND NEW HSI TO CUSTOMERS THAT CURRENTLY DO NOT HAVE BROADBAND SERVICE.Planner: Randy Croslin 209-239-0336OSP Engineer: JIMMY CARTER209-239-0655ISP Engineer: Matt Busch 916-512-4011Project Manager: Theresa Yamamoto 805-484-3179ENGINEERING NOTES:PLACE A 24F FROM AN EXISTING SPLICE ON THE EAST SIDE OF N WALL RD & WALNUT DR NORTH ON WALL RD, THEN WEST ON COMSTOCK TO THE RT SITE. ENERGIZE F0001,43-44. PLACE THE 6 PORTXPAC THAT WAS PURCHASED ON ASSOCIATED EQUIPMENT ESTIMATE 50997 FROM THE TERMINATION POINT OF THE 24 FIBER CABLE INTO THE NEW DSLAM CABINET. SPLICE STRANDS F0001,43-44TO THE XPAC CABLE AND INTO THE DSLAM CABINET. F0001,43-44 IS LOCATED IN LNDNCAXF @ RR: SLC-1 MS: 64 POS:43-44 SC-UPC.AT THE PROPOSED LOCATION THE ASSOCIATED ISP PROJECT 50997 WILL PROVIDE CONDUITS, PADS AND ALL MISC MATERIAL AND LABOR TO ESTABLISHAN COOLPED CABINET. PLACE A 400X24 COPPER CABLE FROM THE COOLPED TO THE EXISTING XT-1000 CROSS CONNECT. THE EXISTING XT 600PR XT WILL NEED TO BE EXPANDED TOACCOMONDATE THE DSLAM COUNT. SPLICE THE TAILS FROM THE SX-48 TO THE 400 PAIR. PLACE 2 6PR DB DROPS FROM THE COPPER SPLICE TO THE COOLPED FOR LINE POWER. SEE DERIVEDCOUNT BELOWNOK703,1-48+2XD+51-98+2XD. (POTS IN)NOK703,501-548+2XD+551-598+2XD. (POTS+DSL OUT)ONLY CHANNELS 1-96 AND 501-596 WILL BE EQUIPPED ON THIS PROJECT.THE COOLPED CABINET, & 6 PORT XPAC, WERE ORDERED ON ASSOCIATED EQUIPMENT ESTIMATE # 50997. THIS MATERIAL WILL NEED TO BE OBTAINED FROM THE COEI TEAM.THE COST ESTIMATE FOR THE SITE PREP WILL BE PROVIDED TO THE ISP ENGINEER FOR ALL THE LABOR TO MOUNT THE EQUIPMENT COORDINATE THE CONNECTION OF THE LINE POWER IN THENEW COOLPED CABINET. OSP CONSTRUCTION WILL CHARGE ALL SITE PREP LABOR TO THE ASSOCIATED ISP PROJECT 50997. WORK WITH THE T&P TEAM TO DETERMINE GROUNDINGREQUIREMENTS.LABOR ESTIMATED HOURS:*NOTE ACTUALS TBD BY ENGINEERING280 Engineering: 1281 Placing: 40281 Splicing 24345 Engineering 40MILESTONES:Engineering Complete: 4/24/2020In-Service: 9/18/2020