Laserfiche WebLink
19 <br /> <br />4.4.7 Installing Cable Assembly <br /> <br />Place the cable assembly through the cable anchor bracket and through the base of post #1. <br />Note that for the MSKT, the cable assembly is fed inside through the feeder chute of the <br />impact head. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Place the bearing plate at the base of post 1 with the 5" dimension up and 3" dimension down. <br />The bearing plate will rest on the angle spacer welded to post #1. See Figure 4. Secure the <br />bearing plate with a retainer/tie to prevent the plate from rotating. Secure both ends of the <br />cable assembly with a 1" hex nut and washer. While tightening the cable, use a hammer to tap <br />the cable anchor bracket from the downstream end to ensure that it is securely interlocked with <br />the shoulder bolts. Restrain the cable at the end being tightened with vice grips or channel lock <br />pliers to avoid twisting the cable. <br /> <br />Upon completion of the installation, the cable should be taut and the cable anchor bracket <br />should be fully seated on the shoulder portion of the cable anchor bolts. <br /> <br />NOTE: It is very important that the cable anchor bracket be fully seated on the shoulder <br />portion of the cable anchor bolts as shown in Figure 7. <br />Anchor cable is fed <br />inside through the <br />MSKT feeder chute.