My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2020_PS-2002001 thru PS-2002500_ - PS-2002480
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2020
>
PS-2002001 thru PS-2002500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2020_PS-2002001 thru PS-2002500_ - PS-2002480
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2023 9:54:08 AM
Creation date
1/26/2023 9:50:18 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2002480
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2020
Notes2
Lower Sacramento Rd. @ Bear Creek Slough and Ranier Ave@ Stockton City Limits
Address
10096 Ahart Rd., Oroville,CA 95966
Application
Frank Medina
Type
Guardrail Replacements
Supplemental fields
Cross Ref
PWP110005
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
19 <br /> <br />4.4.7 Installing Cable Assembly <br /> <br />Place the cable assembly through the cable anchor bracket and through the base of post #1. <br />Note that for the MSKT, the cable assembly is fed inside through the feeder chute of the <br />impact head. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Place the bearing plate at the base of post 1 with the 5" dimension up and 3" dimension down. <br />The bearing plate will rest on the angle spacer welded to post #1. See Figure 4. Secure the <br />bearing plate with a retainer/tie to prevent the plate from rotating. Secure both ends of the <br />cable assembly with a 1" hex nut and washer. While tightening the cable, use a hammer to tap <br />the cable anchor bracket from the downstream end to ensure that it is securely interlocked with <br />the shoulder bolts. Restrain the cable at the end being tightened with vice grips or channel lock <br />pliers to avoid twisting the cable. <br /> <br />Upon completion of the installation, the cable should be taut and the cable anchor bracket <br />should be fully seated on the shoulder portion of the cable anchor bolts. <br /> <br />NOTE: It is very important that the cable anchor bracket be fully seated on the shoulder <br />portion of the cable anchor bolts as shown in Figure 7. <br />Anchor cable is fed <br />inside through the <br />MSKT feeder chute.
The URL can be used to link to this page
Your browser does not support the video tag.