My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP7519 - SP7529
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP7508 -
>
SP7519 - SP7529
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 10:02:39 AM
Creation date
1/30/2023 1:46:02 PM
Metadata
Fields
Template:
Small Plans - SP
Project
Chip Seal 2021-2022
Limits
Mariposa Rd.
Airport Wy., Louise Ave. and Roth Rd.
Alpine Rd., Collier Rd., Escalon-Bellota Rd., Lone Tree Rd.
Airport Wy., Durham Ferry Rd., Lone Tree Rd. S/S, MacArthur
Year
2022
Project Engineer
Terrance Powers
Roads Worked
Mariposa Rd., Airport Wy., Louise Ave., Roth Rd., Alpine Rd.
Collier Rd., Escalon-Bellota Rd., Lone Tree Rd. N/S & S/S
Mariposa Rd., McAllen Rd., Durham Ferry Rd. S/S
MacArthur Rd., North Ripon Rd., River Rd., Roth Rd.
Red Lines
Yes
Project #
222104
Districts
District 1
District 3
District 4
District 5
Supplemental fields
Classification
Record Drawings
Cross Ref
SP7519 - SP7529
Type
Chip Seal
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ni <br />POLYMER MODIFIED ASPHALTIC EMULSION <br />Location Quantity (TON) <br />District 1 41.3 <br />District 3 41.2 <br />District 4 337.1 <br />District 5 265.6 <br />Total 685.2 <br />AGGREGATE <br />(CHIP SEAL) <br />Location <br />Quantity (TON) <br />District 1 <br />363.5 <br />District 3 <br />362.5 <br />District 4 <br />2,967.8 <br />District 5 <br />2,338.2 <br />Collier Rd <br />Total 6,032.0 <br />HOT MIX ASPHALT (TYPE A) <br />Location Quantity (TON) <br />PAVEMENT REPAIR <br />District 1 95.5 <br />District 4 275.5 <br />District 5 66.3 <br />Total 437.3 <br />COUNTY OF SAN JOAQUIN <br />DRAWN BY DATE PROJECT ENGINEER <br />Terrance Powers 1/2022 <br />PAVEMENT REPAIR <br />Location Quantity (SQYD) <br />District 1 <br />Mariposa <br />Rd (8 Locations) <br />286.4 <br />District 4 <br />Alpine Rd <br />(23 Locations) <br />403.9 <br />Collier Rd <br />(5 Locations) <br />86.5 <br />Lone Tree <br />Rd N/S (3 Locations) <br />92.4 <br />Mariposa <br />Rd (8 Locations) <br />116.1 <br />McAllen Rd (8 Locations) <br />127.5 <br />District 5 <br />Durham Ferry <br />Rd (2 Locations) <br />35.5 <br />Lone Tree <br />Rd S/S (3 Locations) <br />163.4 <br />Total 1,311.7 <br />RECORD D w N <br />Any Pot Ug ft Ibb DnmM g 91ftId verity <br />AM 8V Iwoctinq T%& AM Cp vrr+.a <br />PLACE MONUMENT FRAME AND COVER <br />Location Quantity (EA) <br />District 1 <br />Mariposa Rd @ Pock Ln 1 <br />District 4 <br />Alpine Rd 0.01 mile N/0 Cherokee Rd 1 <br />District 5 <br />River Rd 0.50 mile E/0 Harrold Rd 1 <br />Total 3 <br />NO SCALE I SUMMARY OF QUANTITIES <br />DATE CHECKED DATE <br />1/31/22 /� 1/31/22 <br />ADJUST FRAME AND COVER (MONUMENT) <br />Location Quantity (EA) <br />District 4 <br />Lone Tree Rd 0.50 mile E/0 Brennan Ave 1 <br />Total 1 <br />REMOVE THERMOPLASTIC TRAFFIC <br />STRIPE (F) <br />Location Quantity (LF) <br />District 3 <br />Roth Rd 1,680 <br />LoL,6se Ave <br />District 4 <br />Lone Tree Rd N/S 200 <br />-Muripusu -Rd 2 <br />District 5 <br />Lone Tree Rd S/S 200 <br />Total 2,082 <br />REMOVE THERMOPLASTIC PAVEMENT <br />MARKING (F) <br />Location Quantity (SQFT) <br />District 3 <br />Roth Rd (Yellow) 246 <br />District 5 <br />Lone Tree Rd 79 <br />Total 325 <br />Note: (F) Denotes Final Pay Quantity. <br />CHIP SEAL 2021-2022 Sheet No. <br />arious Roads in Districts 1, 3, 4 and 5) 1 11 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.