Laserfiche WebLink
SI]N <br />Var <br />Const <br />Limits of Clearinl g and Grubbing <br />Limits of Polymer Modified Asphaltic I Emulsion and Aggregate (Chip Seal) <br />Var <br />1'-2' Refer to Table on Sheet No. 9 1'-2' <br />U <br />PCC Curb &Gutter I Center Divide/Curb (Where exists) <br />E w ia� <br />(Where exists) -- o Q' Match F- Chip Seal Chip Seal Match o AC Dike or PCC <br />w Existing I Existing <br />o � -, 9 � � Curb (Where exists) <br />-- - - - -- -� v © L Slope — �- -L _� --Slope w <br />SHOULDER DETAIL Existing Roadway SHOULDER DETAIL <br />With Curb & Gutter Without Curb & Gutter <br />TYPICAL SECTION <br />GENERAL NOTES: <br />1. Chip seal must be placed in a single layer on existing or prepared asphalt concrete pavement <br />surface. Chip seal is not allowed on existing bridge decks Portland Cement Concrete surfaces <br />including pavement, railroad crossings, etc. <br />2. Aggregate must have fine gradation of i" maximum. <br />3. Two weeks prior to the start of work, furnish to the Engineer a schedule showing proposed street <br />closures on each half-day basis. No work will commence until this schedule is approved by the <br />Engineer. <br />4. All intersection radii within project limits must be sealed to existing edge of pavement, face of <br />dike or lip of curb and gutter. <br />5. Before chip seal is to be applied to any area, protect all utility covers, including, but not limited <br />to: maintenance holes, water valves and survey monument frames and covers. Remove protective <br />covers after completing the chip seal operation. Full compensation for said work must be <br />considered as included in the contract unit price for various items of work and no separate <br />payment will be made therefor. <br />6. Surface preparation work must be as directed by the Engineer. Locations and dimensions of <br />Pavement Repair will be determined by the Engineer and must be placed 18 hours prior to <br />placing chip seal. <br />7. Remove and dispose of all existing Thermoplastic Traffic Stripes and Pavement Markings in all <br />project areas. The Contractor is responsible for verifying the quantities within the Project's limits <br />of work. See sheet 9 and 11 for locations and quantities. <br />8. Perform street sweeping throughout the duration of the chip seal operations of the project per <br />the specifications. Full compensation for these sweeping operations must be considered as <br />included in the contract unit price paid for various items of work and no separate payment will <br />be made therefor. <br />COUNTY OF SAN JOAQUIN I NO SCALE <br />DRAWN BY DATE PROJECT ENGINEER DATE <br />Terrance Powers 1/2022 7,__, u� 1/31/22 <br />9. Unless allowed by written approval from the Engineer, perform chip seal operations on <br />streets where schools are situated, or in close proximity to the work, on the weekend <br />or when school is not in session. <br />10. Unless allowed by written approval from the Engineer, cease all chip seal operations at <br />1:00 pm. <br />11. Place Monument Frame and Cover at various locations, see Summary of Quantities for locations. <br />12. Areas proposed for staging and/or storage of materials within the County right-of-way <br />require written approval from the Engineer. The areas utilized staging and/or storage <br />area must be restored to their original condition. Any damages or unclean conditions <br />to staging or storage areas must be repaired at the Contractor's own expense. Obtain <br />permission from the property owner to stage equipment or store materials on private <br />property. Provide the Engineer a letter of release from the property owner of the <br />areas utilized for staging and/or storage of materials. <br />13. Traffic delays due to construction operations must not exceed 10 minutes, or J mile of vehicle <br />queue, whichever occurs first. <br />14. The Contractor must perform final roadway sweeping operations on all chip sealed roads fifteen <br />(15) working days after application. All sweeping operations within or adjacent to a travel lane <br />require traffic ctn6 4.CORD DRAW� NG <br />awrosom y <br />_5, <br />_ <br />Alyftl V0ftWft y e°ty <br />AN Nwiwal"ftepumv A we* <br />TYPICAL SECTION AND <br />GENERAL NOTES <br />CHECKED I DATE <br />/19 /� 11/31/22 <br />CHIP SEAL 2021-2022I Sheet No. <br />arious Roads in Districts 1, 3, 4 and 5) 2 of 11 <br />