Laserfiche WebLink
J <br />I <br />0 <br />SHOULDER BACKING <br />Location Quantity (TON) <br />Mainline <br />Sta 10+10 to Sta 95+56 Total 1,143 <br />EARTHWORK <br />(MISCELLANEOUS AREAS) <br />Location Quantity (STA) <br />Sta 90+15 (Rt) to 91 +15 (Rt) Total 1 <br />PENETRATION TREATMENT <br />Location Quantity (SQYD) <br />4 Locations (Van Allen Rd) Total 162 <br />DRIVEWAY (TYPE D) <br />Location Quantity (SQYD) <br />1 Locations Total 20 <br />DRIVEWAY (TYPE E) <br />Location Quantity (SQYD) <br />10 Locations Total 413 <br />HOT MIX ASPHALT (TYPE A) <br />Location Quantity (TON) <br />Mainline 3,520 <br />Tapered Edge 68 <br />Driveways (Types D & E) 46 <br />Pavement Repair 684 <br />Total 4,318 <br />EOSYNTHETIC PAVEMENT INTERLAYE <br />(PAVING FABRIC) <br />Location Quantity (SQYD) <br />Sta 10+60 to 62+54 10,965 <br />Sta 63+75 to 95+06 6,610 <br />Total 17,575 <br />COLD PLANE PAVEMENT <br />Location <br />Quantity (EA) <br />Sta 14+65 <br />Quantity (SQYD) <br />Sta <br />10+10 <br />to <br />Sta <br />10+60 <br />162 <br />Sta <br />62+54 <br />to <br />Sta <br />63+04 <br />161 <br />Sta <br />63+25 <br />to <br />Sta <br />63+75 <br />150 <br />Sta <br />95+06 <br />to <br />Sta <br />95+56 <br />132 <br />COUNTY OF SAN JOAQUIN <br />DRAWN BY DATE PROJECT ENGINEER DATE <br />Hw*ig Hc, 2/2022 I . "� ;! /3/r, <br />Total 605 <br />PAVEMENT REPAIR <br />Location Quantity (SQYD) <br />124 Locations Total 2,050 <br />PLACE MONUMENT FRAME AND COVER <br />Location Quantity (EA) <br />Sta 10+00 � (Carrolton Rood) 1 <br />Sta 36+60 1 ' (Rt) 1 <br />Sta 76+40 2' (Lt) 1 <br />Sta 89+70 3' (Lt) 1 <br />Total 4 <br />ADJUST FRAME AND COVER <br />(SSJID UTILITY VAULT) <br />Location Quantity (EA) <br />Sta 14+51 (12' Lt) 1 <br />Sta 76+72 (14' Lt) 1 <br />Sta 91 +58 (14' Lt) 1 <br />Total 3 <br />RECORD DRAWING <br />Oa�reaMoite lily <br />ilio Cl w*" BY ' ��.✓ <br />Dewe <br />Any Person using this Drowitig 4hou ft <br />All Information 8V Inspecting The ills 011M1►w <br />NO SCALE SUMMARY OF QUANTITIES <br />CHECKED DATE <br />T.u.- 0%000*., 3/1 I*t <br />ADJUST FRAME AND COVER <br />(SSJID CATHODIC PROTECTION TEST) <br />Location <br />Quantity (EA) <br />Sta 14+65 <br />(4' <br />Lt) 1 <br />Sta 40+01 <br />(7' <br />Lt) 1 <br />Sta 60+42 <br />(7' <br />Lt) 1 <br />Sta 76+54 <br />(7' <br />Lt) 1 <br />Total 4 <br />ADJUST FRAME AND COVER <br />(SSJID WATER VALVE) <br />Location Quantity (EA) <br />Sta 14+51 (7' Lt) 1 <br />Sta 76+72 (7' Lt) 1 <br />Sta 91 +58 (7' Lt) 1 <br />Sta 95+84 (1 1 ' Lt) 1 <br />Total 4 <br />ADJUST FRAME AND COVER <br />(SSJID MAINTENANCE HOLE) <br />Location Quantity (EA) <br />Sta 95+85 (25' Lt) Total 1 <br />DODDS ROAD RESURFACING <br />(Carrolton Road to Marbosa Road) <br />Sheet No. <br />6 of 6 <br />