Laserfiche WebLink
PORTABLE CHANGEABLE MESSAGE SIGN <br />Location Quantity (EA) <br />State Route 120 <br />West of Henry Road 1 <br />State Route 120 <br />East of Henry Road 1 <br />Henry Road <br />South of Lone Tree Road 1 <br />Total 3 <br />EARTHWORK (MISCELLANEOUS AREAS) <br />Location Quantity (STA) <br />TYPE 1 <br />Sta 11 +50 to Sta 36+50 (Rt) 25.00 <br />Sta 37+50 to Sta 42+50 (Lt) 5.00 <br />Sta 80+55 to Sta 80+90 (Rt) 0.35 <br />Su btota 1 30.35 <br />TYPE 2 <br />Sta 10+27 to Sta 15+27 (Lt) 5.00 <br />(along west radius at S.R. 120) <br />Sta 81 +25 to Sta 81 +90 (Rt) 0.65 <br />Subtotal 5.65 <br />Total 36.00 <br />COUNTY OF SAN JOAQUIN <br />DRAWN BY DATE PROJECT ENGINEER DATE <br />Dan G'am6ini 3/2022 <br />PENETRATION TREATMENT <br />Location Quantity (SQYD) <br />Begin Conform <br />Sta 10+27 to Sta 11 +55 (Lt & Rt) 165 <br />Norton Avenue <br />Sta 9+38 to Sta 9+88 (Lt & Rt) 101 <br />Chapman Way <br />Sta 9+38 to Sta 9+88 (Lt & Rt) 98 <br />End Conform <br />Sta 132+23 to Sta 133+17 (Lt & Rt) 99 <br />DRIVEWAY (TYPE D) <br />Location Quantity (SQYD) <br />42 Locations Total 1,103 <br />DRIVEWAY (TYPE E) <br />Location Quantity (SQYD) <br />18 Locations Total 425 <br />HOT MIX ASPHALT (TYPE A) <br />Location Quantity (TON) <br />Begin Conform <br />REMOVE <br />CONCRETE <br />Location <br />Quantity (SQYD) <br />Sta <br />42+14 (Rt) <br />16 <br />Sta <br />60+86 (Lt) <br />14 <br />Sta <br />66+87 (Rt) <br />33 <br />Sta <br />75+93 (Lt) <br />68 <br />Sta <br />89+24 (Rt) <br />35 <br />Sta <br />108+62 (Rt) <br />18 <br />Sta <br />119+52 (Rt) <br />16 <br />Sta <br />121 +73 (I -t) <br />9 <br />Sta <br />123+35 (Rt) <br />25 <br />132+67 to Sta 133+17 <br />Pavement Repair <br />Total 234 <br />EARTHWORK (MISCELLANEOUS AREAS) <br />Location Quantity (STA) <br />TYPE 1 <br />Sta 11 +50 to Sta 36+50 (Rt) 25.00 <br />Sta 37+50 to Sta 42+50 (Lt) 5.00 <br />Sta 80+55 to Sta 80+90 (Rt) 0.35 <br />Su btota 1 30.35 <br />TYPE 2 <br />Sta 10+27 to Sta 15+27 (Lt) 5.00 <br />(along west radius at S.R. 120) <br />Sta 81 +25 to Sta 81 +90 (Rt) 0.65 <br />Subtotal 5.65 <br />Total 36.00 <br />COUNTY OF SAN JOAQUIN <br />DRAWN BY DATE PROJECT ENGINEER DATE <br />Dan G'am6ini 3/2022 <br />PENETRATION TREATMENT <br />Location Quantity (SQYD) <br />Begin Conform <br />Sta 10+27 to Sta 11 +55 (Lt & Rt) 165 <br />Norton Avenue <br />Sta 9+38 to Sta 9+88 (Lt & Rt) 101 <br />Chapman Way <br />Sta 9+38 to Sta 9+88 (Lt & Rt) 98 <br />End Conform <br />Sta 132+23 to Sta 133+17 (Lt & Rt) 99 <br />DRIVEWAY (TYPE D) <br />Location Quantity (SQYD) <br />42 Locations Total 1,103 <br />DRIVEWAY (TYPE E) <br />Location Quantity (SQYD) <br />18 Locations Total 425 <br />HOT MIX ASPHALT (TYPE A) <br />Location Quantity (TON) <br />Begin Conform <br />COLD PLANE ASPHALT <br />Sta 10+27 to <br />Sta 10+77 <br />Mainline Paving <br />Henry <br />Sta 10+77 to <br />Sta 106+50 <br />Sta 106+50 to <br />Sta 132+67 <br />(Includes paved <br />frontage) <br />Cross Street Conforms <br />Norton Avenue <br />Sta <br />Chapman Way <br />667 <br />End Conform <br />Sto 132+67 to <br />Sta 133+17 <br />Tapered Edge <br />Chapman <br />Sta 10+27 to <br />Sta 133+17 (both sides) <br />Driveway (Type <br />Di <br />42 Locations <br />Henry <br />Driveway_(T,voe <br />EE) <br />18 Locations <br />132+67 to Sta 133+17 <br />Pavement Repair <br />84 <br />4,255 <br />1,332 <br />30 <br />28 <br />49 <br />200 <br />232 <br />45 <br />77 <br />Total 6,332 <br />NO SCALE I SUMMARY OF QUANTITIES <br />CHECKED DATE <br />mss 3 3�1//" <br />PAVEMENT REPAIR <br />Location Quantity (SQYD) <br />5 Locations Total 323 <br />PLACE MONUMENT FRAME AND COVER <br />Location Quantity (EA) <br />Sta 53+98 (CL) 1 <br />Sta 106+79 (CL) 1 <br />Total 2 <br />ADJUST FRAME AND COVER (MONUMENT) <br />Location Quantity (EA) <br />Sta 80+32 (CL) 1 <br />SHOULDER BACKING <br />Location Quantity (TON) <br />Sta 10+27 to Sta 133+17 (Lt) 784 <br />Sta 10+27 to Sta 133+17 (Rt) 886 <br />Total 1,670 <br />i • i <br />M <br />HENRY ROAD RESURFACING <br />(State Route 120 to Lone Tree Road) <br />Sheet No. <br />5 of 5 <br />COLD PLANE ASPHALT <br />CONCRETE <br />Location <br />Quantity (SQYD) <br />Henry <br />Road Begin Conform <br />Sta <br />10+27 to Sta 10+77 <br />505 <br />Henry <br />Road ® Minor Structure <br />Sta <br />79+50 to Sta 82+00 <br />667 <br />Norton Avenue ® Henry Road <br />Sta <br />9+38 to Sta 9+88 (Lt) <br />181 <br />Chapman <br />Way ® Hen[y Road <br />Sta <br />9+38 to Sta 9+88 (Lt) <br />170 <br />Henry <br />Road End Conform <br />Sta <br />132+67 to Sta 133+17 <br />296 <br />Total 1,819 <br />PAVEMENT REPAIR <br />Location Quantity (SQYD) <br />5 Locations Total 323 <br />PLACE MONUMENT FRAME AND COVER <br />Location Quantity (EA) <br />Sta 53+98 (CL) 1 <br />Sta 106+79 (CL) 1 <br />Total 2 <br />ADJUST FRAME AND COVER (MONUMENT) <br />Location Quantity (EA) <br />Sta 80+32 (CL) 1 <br />SHOULDER BACKING <br />Location Quantity (TON) <br />Sta 10+27 to Sta 133+17 (Lt) 784 <br />Sta 10+27 to Sta 133+17 (Rt) 886 <br />Total 1,670 <br />i • i <br />M <br />HENRY ROAD RESURFACING <br />(State Route 120 to Lone Tree Road) <br />Sheet No. <br />5 of 5 <br />