Laserfiche WebLink
DUST CONTROL <br />(NON—WORKING HOURS) <br />Location Quantity (EA) <br />Patton Avenue �0 <br />Sibley Avenue ;i, - <br />Total 2 <br />SHOULDER BACKING <br />Location Quantity (TON) <br />Patton Avenue <br />Mainline 81 <br />Sibley Avenue <br />Mainline 60 <br />Total 141 <br />PENETRATION TREATMENT <br />Location Quantity (SQYD) <br />Patton Avenue <br />4 Locations (Intersection Radii) 280 <br />.Sibley Avenue <br />4 Locations (Intersection Radii) 304 <br />Total 584 <br />COUNTY OF SAN JOAQUIN <br />DRAWN BY DATE PROJECT ENGINEER <br />DRIVEWAY (TYPE D) <br />Location Quantity (SQYD) <br />Patton Avenue <br />23 Locations 125 <br />Sibley Avenue <br />1 Location 5 <br />Total 130 <br />DRIVEWAY (TYPE ES) <br />Location Quantity (SQYD) <br />Patton Avenue <br />34 Locations 179 <br />Sibley Avenue <br />25 Locations 165 <br />Total 344 <br />HOT MIX ASPHALT (TYPE A) <br />Location Quantity (TON) <br />Patton Avenue <br />Mainline 1,249 <br />Sibley Avenue <br />Mainline 1,018 <br />Driveways 93 <br />Pavement Repair 17 <br />Total 2,377 <br />REMOVE SUBBASE, BASE AND SURFACING <br />Location Quantity (SQYD) <br />Patton Avenue <br />Sta 10+16 to Sta 38+60 7,492 <br />Sibley Avenue <br />Sta 50+20 to Sta 76+42 6,1 1 1 <br />Tota 1 13,603 <br />PAVEMENT REPAIR <br />Location Quantity (SQYD) <br />Misc Locations Total 100 <br />PLACE MONUMENT FRAME AND COVER <br />Location Quantity (EA) <br />Sibley Avenue <br />Sto 63+25 (IP) 1 <br />Sta 76+51 (IP) 1 <br />Total 2 <br />"ka <br />#. to <br />ago <br />+w�■Ilio�o► � 41 "{�Mr4 � �IMMR <br />NO SCALE SUMMARY OF QUANTITIES ROAD DISTRICT 4 STREETS RESURFACING 2021-2022 sheet No. <br />(Patton Avenue and Sibley Avenue: Copperopolis Road to Ada Avenue) 5 of 5 <br />DATE CHECKED DATE <br />/2/, �.., 'l/..�./►t �/fit/„ <br />