Laserfiche WebLink
GENERAL NOTES: <br />1. Two weeks prior to the start of work, the Contractor must furnish to the Engineer a <br />schedule showing proposed street closures on each half—day basis. No work will <br />commence until this schedule is approved by the Engineer. <br />2. All intersection radii within project limits must be slurry sealed to lip of existing curb <br />and gutter, face of dike or edge of pavement. <br />3. Surface preparation work must be as directed by the Engineer. Locations and <br />dimensions of Pavement Repair will be determined by the Engineer. <br />4. The aggregate for slurry seal must be Type II. <br />5. Slurry seal must not begin until the HMA used in Pavement Repair and Place HMA <br />(Miscellaneous Areas) has been in place for a minimum of 18 hours. <br />6. The Contractor must perform street sweeping throughout the duration of the slurry seal <br />operations of the project per the specifications. Full compensation for sweeping <br />operations must be considered as included in the contract unit price paid for Slurry <br />Seal (Type ll) item of work and no separate payment will be made therefor. <br />7. The Contractor must perform slurry seal operations on streets where schools are <br />situated on the weekend or when school is not in session unless allowed by written <br />approval from the Engineer. <br />8. The Contractor must stop slurry seal operations at 1:00 pm unless prior approval from <br />the Engineer is obtained. <br />9. Areas for staging and/or storage of materials and equipment within the County <br />right—of—way must be approved by the Engineer. The areas utilized by the Contractor <br />for staging and/or storage must be restored to their original conditions. Any damages <br />or unclean conditions to staging or storage areas must be repaired at the Contractor's <br />own expense. It will be the Contractor's responsibility to obtain permission from the <br />property owner to stage equipment or store materials on private property. The <br />Contractor must provide a letter of release from the property owner of the areas <br />utilized for staging and/or storage of materials. <br />10. Placement of "No Parking" signs/barricades must be placed no less than 72 hours <br />prior to slurry seal work and the final sweeping. <br />11. Existing highway and utility facilities must remain in place unless otherwise noted. <br />12. Existing trees, shrubs, fences, mailboxes and other frontage improvements must remain <br />in place unless otherwise noted. <br />13. Existing drainage facilities must remain in place unless otherwise noted. The Contractor <br />must conduct earthwork operations so as not to modify or obstruct the existing <br />drainage. <br />COUNTY OF SAN JOAQUIN <br />DRAWN BY I DATE I PROJECT ENGINEER <br />Shawn Davis 1 12/21 <br />14. The Contractor will be responsible for adequately scheduling inspection and testing of all <br />facilities constructed under this contract with a minimum 24—hour notice to the County. <br />All testing must conform to the Standard Specifications. All re—testing will be paid by <br />the Contractor. <br />15. The Contractor must obtain an Encroachment Permit from Caltrans, the City of <br />Stockton, the City of Tracy, and CCTC RR for traffic control or any work within their <br />jurisdictions. Payment for this will be considered as included in contract prices paid for <br />the various items of work included. <br />16. The Contractor must obtain all permits and licenses required for the construction and <br />completion of the project, and must perform all work in accordance with the <br />requirements and conditions of all permits and approvals applicable to the project. <br />17. Hand grinding of asphalt concrete pavement will be required at locations where existing <br />highway and utility facilities are within the Pavement Repair limits. Payment for hand <br />grinding will be considered as included in the contract unit price paid for Pavement <br />Repair. <br />18. The Contractor must exercise due caution and carefully preserve survey bench marks, <br />control points, reference points and all survey stakes, and must bear all expenses for <br />replacement and/or errors caused by their unnecessary loss or disturbance. <br />CA- <br />Owntions By_ —� <br />No Changes By, ' { <br />Const leteli_t7_z� <br />a PWSOn Using This Dr WT; Shou <br />TC farmation By �napgc+i- Y ;� Site <br />�— Limits of Clearing and Grubbing <br />Lip/EP <br />—I VarE - Road Width Varies <br />L.- <br />0 <br />— Slurry Seal <br />o (Type II) i <br />r U <br />Existing PCC Curb, I <br />Gutter and/or Sidewalk <br />SHOULDER DETAIL <br />with Curb, Gutter <br />and/or Sidewalk <br />NO SCALE GENERAL NOTES AND <br />TYPICAL SECTION <br />DATE <br />I <br />CHECKED DATEIII/ <br />Existing <br />Roadway <br />EP <br />0 <br />4-. <br />c <br />0 <br />0 <br />Existing <br />Surface <br />SHOULDER DETAIL <br />without Curb, Gutter <br />TYPICAL SECTION and/or Sidewalk <br />All Roads <br />SLURRY SEAL LOCAL ROADS 2021-2022 Sheet No. <br />(Road Districts 1, 2, 3, 4 and 5) f 2 of 12 <br />