My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2020 - PS-2002501 thru PS-2003000_ - PS-2002622
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2020
>
PS-2002501 thru PS-2003000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2020 - PS-2002501 thru PS-2003000_ - PS-2002622
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2023 9:25:33 AM
Creation date
2/1/2023 9:24:25 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2002622
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2020
Notes2
S/S of Atkinson Rd. 265' E/O Hibbard Rd.
Address
PO Box 930, Stockton,CA 95201
Application
Pacific Gas & Electric-Stockton
Type
Pole Replacement
Supplemental fields
Cross Ref
PWP730052
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Special Conditions for -2- <br />ENCROACHMENT PERMIT <br /> <br /> <br /> <br />12. County roads shall be kept clean from mud and debris at all times along the access points and <br />work zone areas during entire project. All standard roadway striping and signage shall be clearly <br />visible, maintained and restored throughout the construction zone during and after the project. <br /> <br />13. In addition to standard dust control measures, streets shall be maintained in a clean condition, <br />free of dirt, mud and debris during construction activities. The contractor shall provide daily, and <br />as determined to be necessary by County inspectors, street sweeping using a modern <br />mechanical or vacuum-assisted street sweeper. <br /> <br />14. The contractor shall not conduct construction operations in rain or heavy fog conditions.
The URL can be used to link to this page
Your browser does not support the video tag.