My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2020 - PS-2002501 thru PS-2003000_ - PS-2002642
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2020
>
PS-2002501 thru PS-2003000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2020 - PS-2002501 thru PS-2003000_ - PS-2002642
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2023 4:29:56 PM
Creation date
2/1/2023 4:27:20 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2002642
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2020
Notes2
N/S of Mariposa rd. 0.6 Mile E/O Mariposa Rd.
Address
PO Box 930, Stockton,CA 95201
Application
Pacific Gas & Electric-Stockton
Type
Trench
Supplemental fields
Cross Ref
PWP730052
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Always indicate specific section on sketch if multiple values for material, method of installation, size, or year installed (if year is available) are applicable to a single service. <br />Not intended to be inclusive <br />of all possible symbols. <br />This section is <br />for reference only. <br />----GasLine(New) ® Meter Anode <br />-4- Reducer 1W0R-0-EFV-()--ValvewithFrame and Cover <br />�„E�•, <br />Gas Line (Existing) ® Meter Manifold ® Electronic Marker <br />�ServiceTee � OR Cap Pipe Size and Material (Casing Size and Material) Inser <br />•Main <br />•Material <br />• Name of nearest cross street <br />Instructions <br />for Deactivations: <br />v <br />•Service pipe <br />El <br />• Method of install per <br />•Name of street <br />The <br />following is the minimum Information require <br />•Servicetee <br />*2 <br />v <br />TD -4461M: Trench, HDD, <br />.North arrow <br />when <br />documenting deactivations on the GSR. <br />• Pressure classification: High pressure (HP), <br />M <br />V <br />splitting, dry bore, insert <br />_ <br />• Street address <br />• Location ofgas fiowtermination <br />2 <br />semi -high pressure (SHP), law pressure <br />d <br />U <br />•Pipe size <br />a <br />• Dimension service tee to service end <br />• Installed assets related to deactivation(e.g. <br />(LP), transmission pressure (TP) <br />• Status: New or existing <br />• Dimension service tee to nearest cross street <br />electronic markers, end caps, plugs) <br />`o <br />• Existing pipe: Year <br />= <br />o <br />• Deactivated pipe: Length, material, size <br />• Mother/branch service= <br />Casing length <br />.n <br />c <br />• New cathodic protection (e.g. anode) <br />v <br />installed, if available <br />Deactivated pipe length <br />• Deactivated pipe: Year installed, if available <br />cL <br />• Casing material <br />v <br />°1 <br />— <br />n <br />• Deactivated pipe <br />V <br />E <br />• Width of cross street <br />`o <br />• Date deactivation work was completed in <br />• Electronic markers <br />a <br />g <br />•Casing size <br />w <br />Repairs: Dimension from service tee or riser <br />.0- <br />• <br />accordance with TD-950OP-16 <br />. Fittings per TD -4461M <br />gs p <br />= <br />•Joint trench (JT) <br />= <br />and length of repair <br />S <br />v <br />L <br />,LAN ID and signature' or printed name of <br />m <br />d <br />- <br />•Curbvalve <br />• Excessflowvalve <br />Pipe <br />P <br />c <br />°1 <br />• Partial replacement: Dimension from service <br />..•g <br />c <br />m <br />thequalifledfield representative <br />performing required testis) and/or <br />F <br />A <br />• Meter/manifold <br />if <br />2 <br />•Material <br />• Type: Main or service <br />a <br />3 <br />tee or riser and length of installation <br />. Stub completion: Dimension from service <br />o <br />m <br />inspection(s) <br />, <br />n <br />• Pie casing <br />P 8 <br />m <br />$ <br />• status: New <br />o <br />- <br />tee or riser and lenth of installation <br />g <br />• IAN ID and signature or printed name of <br />w <br />•Regulating stations involved in or within <br />d <br />'Q <br />system status: Tied or <br />' Ys (TI <br />3 <br />,r <br />, Manifold or large meter: Dimension <br />the person in charge responsible for <br />close proximity to work <br />s <br />g <br />°� <br />dead end (DE) <br />_ <br />minimum distance required between <br />installing assets and performing work <br />e <br />, Meter guards <br />• Existing pipe: year <br />structure and riser <br />related to deactivation <br />m <br />• Met hod connection per <br />o <br />installed, ifavailable <br />.Lateral offset: Dimensionfrom servicetee <br />'Ezcevation Agent: PG&E or Applicant <br />4-t <br />TD-9500P-1P-14JA01A <br />ai <br />•Casing material <br />or riser <br />•Deactivation order reference <br />$ <br />•Deactivated non -pipe assets, if <br />= <br />9. <br />•LAN ID' ofqualified individual performing <br />a' <br />•Casing size <br />. Valves and fittings: Dimension from service <br />8 <br />connection <br />Joint trench (Inn <br />tee or riser <br />available: material, size. <br />
The URL can be used to link to this page
Your browser does not support the video tag.