Laserfiche WebLink
Pacific Gas and <br />ce Record (GSR) orml➢-95°aP-14-4/15/ 20 <br />Gas Servl0 <br />Publication Date: 04/15/2020 <br />Electric Company <br />If completing this form by hand, use non—erasable blue or black ink Effective Date: 07/15/2020 <br />Lot <br />J: N/A <br />Notif. �: 115101824 <br />PM Order : 35181540 <br />Address 18678 N HWY 99 City: ACAMPO <br />Applicant/Tract Name: TOM ALEXANDER / 209-334-9112 Est, IAN ID: FWf2 Date <br />Issued: 71212020 <br />Leak )f: N/A <br />Install Pipe: ❑No ❑Yes <br />Install Pipe: ❑ND El Yes <br />El New Phased Service <br />Type: ❑PE2406/27D8 ❑ Other : <br />E <br />Type: ❑PE2406/270B El Other <br />El Stub <br />Mfg' F-] Performance/ <br />Ce/ ❑Other: <br />Mfg: ❑Peirforma Ce/ ❑Other: <br />Completion <br />s <br />s <br />New❑Servibe <br />Mfg Date: <br />Mfg Date: <br />XFull Service <br />❑Branch Service Ref. <br />Replacement: <br />Type: ❑Stub XOther: COMPLETE SERVICE <br />Type: ❑Com letion ❑Other: <br />Excavation Agent: XPG&E El Applicant <br />Installation Agent: XPG&E El Applicant <br />n <br />Excavation Agent: E: PG&E El Applicant <br />Installation Agent: E: PG&E El Applicant <br />❑Full Service <br />❑Partial Service <br />[:]Brunch Service - Ref. <br />B <br />By: <br />B y' <br />Person in charge LAN ID and signature or printed name' <br />Person in charge LAN ID and signature or printed <br />name' <br />❑ Riser <br />Date, <br />Date: <br />❑ Transfer <br />❑ Alteration <br />E] Soap Test <br />❑ Soo p Test <br />E] Repair <br />Tested by: <br />`" <br />Tested by:❑Abandonment <br />Qualified field rep. IAN IN and signature or printed <br />Date: <br />name' <br />Qualified field rep. IAN IN and signature <br />Date: <br />or printed name' <br />l <br />W <br />❑Uprate <br />Convert to: El Main El Service <br />Pressure: psig Duration: <br />min. <br />Pressure: psig Duration, <br />min. <br />El Other: <br />Main: in. <br />Status: <br />❑None ❑Existing ❑Installed <br />1800 <br />W. <br />i <br />Status, XNone El Existing El Installed <br />Installed Stub/Service:-in. <br />w <br />Reason <br />None: Flow Series: <br />Mat'l ❑Plastic ❑Metallic Mfg: <br />Nat'l: <br />XPlastic ❑Metallic Size:❑Y n.XI in.❑Other: <br />in. <br />82 <br />Size, ❑Y in. ❑l in. LJOthec In. <br />s <br />Existing Stub/Service: in. <br />Mfg: <br />❑Elster-Perfection El Other <br />a'.o <br />Critical Isolation Valve: El No El Yes El Unknown <br />Status: ❑None ❑Exlst'Ing ❑Installed <br />Status: E] Existing El Installed Size:l-1 4° x 1 <br />Type: ❑Cathodic Protection Size: <br />XLocating Size: #10 <br />Location: XOutside E] Inside Bypass: ❑No XYes <br />Start: XMain ❑Branch ❑Other: <br />Connection Method: XBond ❑Strap/Wrap <br />Type: XPrefabricated ❑Service Head Adapter El Steel <br />End: XRlser ❑Branch ❑Other: <br />Connection Method: ❑Bond XStrap/Wrap <br />Riser Valve Mfg.: ❑Jamar ❑Other: <br />Isolated Steel Service (ISS): XNo ❑Yes El Existing <br />CP Read Required: XNo El Yes <br />Weld Inspection Required: El No XYes <br />Anode: XNo ❑Existing ❑Installed Size: <br />Ibs. <br />By: <br />By: <br />(Qualified field rep, LAN ID and signature or printed name') <br />(Qualified field rep. IAN ID and signature or printed name') <br />Type: El Zinc E] Magnesium ✓) Installed: <br />Pipe -to -Soil: mV Date: <br />Date: <br />Location: El Riser ❑Valve ❑Service <br />Reading Location: ❑Riser El Valve El Service <br />Type: ❑Radlographic ❑Visual ❑Mag. Particle <br />12 <br />As -Built By: Contractor: <br />Date: <br />Z <br />(IAN I0 <br />(Name and company name) <br />As -Built By: Contractor: <br />Date: <br />(IAN ID) <br />(Nome and company name) <br />INSTALL NEW GAS SERVICE. PG&E TO PERFORM ALL EXCAVATION. PG&E TO INSTALL 75' OF <br />1" PL HE SERVICE FROM EXISTING 2" STL HP MAIN AND CONNECT SERVICE. INSTALL (1) 1800 EFV, <br />(1) 1-1/4" x 1" RISER WITH 3/4" BYPASS AND (1) ALSOO METER. ENCROACHMENT PERMIT REQUIRED. <br />'It <br />IAN ID is not available, write name and company name; Include employee Identifier if available. <br />Draw sketch in space below. <br />a <br />E CLARKSDALE <br />RD (45) <br />P/L <br />(T) HP <br />HP HP HP <br />HP (DE) <br />EX. 2" ST H P — <br />10' <br />P/L <br />497'—i— 25' <br />I <br />I <br />I <br />I <br />a -i <br />I <br />NI <br />z� <br />I <br />I <br />I <br />I <br />I <br />i <br />I <br />I <br />1 <br />� <br />On, <br />la' <br />I <br />18678 <br />z <br />N HWY 99 <br />J <br />� <br />d <br />J <br />� <br />C1_ <br />PG&E Internal <br />0 2020 Pacific Gas and Electric Company. All rights reserved, <br />