Laserfiche WebLink
1.ALL TRAFFIC DEVICES SHALL CONFORM TO THE LATEST EDITION OF CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) AND <br />THE STANDARD SPECIFICATIONS FOR PUBLIC WORK. <br />2.HIGH LEVEL WARNING DEVICES (FLAG TREES) SHALL CONSIST OF MINIMUM OF TWO FLAGS. <br />3.ALL WORKERS SHALL BE EQUIPPED WITH A REFLECTIVE VEST AND HARD HAT. ALL FLAGGERS SHALL ALSO BE EQUIPPED WITH A C28 "STOP/SLOW" <br />PADDLE AND BE TRAINED IN THE PROPER FUNDAMENTALS OF FLAGGING TRAFFIC. <br />4.NO PARKING SIGNS SHALL BE PLACED 72 HOURS PRIOR TO SET UP. SIGNS SHALL BE POSTED EVERY 50-100 LINEAR FEET OF OCCUPIED SPACE WITH <br />AT LEAST ONE SIGN AT EACH END OF OCCUPIED SPACE. <br />5.ANY CONFLICTING SIGNS WILL BE COVERED FOR THE DURATION OF THE JOB. <br />6.ACCESS TO RESIDENCES AND BUSINESSES SHALL BE MAINTAINED AT ALL TIMES. ACCESS TO BE DETERMINED IN FIELD. <br />7.MUST MAKE PRIOR ARRANGEMENT WITH THE PROPERTY OWNER BEFORE CLOSING DOWN ANY DRIVEWAYS. <br />8.MAINTAIN A SAFE PEDESTRIAN ROUTE. MAINTAIN 12 FEET LANE UNLESS OTHERWISE NOTED. <br />9.ALL TRENCHES MUST BE BACK FILLED OR PLATED DURING NON-WORKING HOURS. W8-24 "STEEL PLATE AHEAD" SIGN MUST BE POSTED 250 FEET <br />ADVANCE OF ANY PLATE THAT IS IN THE ROAD WAY. <br />10.THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO ALLOW EMERGENCY VEHICLES TO PASS THROUGH THE CONSTRUCTION ZONES <br />WITHOUT ANY DELAYS. <br />11.PLACE W20-1 "ROAD WORK AHEAD" SIGN ON ANY SIDE STREET OR HIGH VOLUME DRIVEWAY THAT IS WITHIN TRAFFIC CONTROL ZONE. <br />12.TPR TRAFFIC SOLUTIONS ASSUMES NO LIABILITY WHEN CONTRACTOR DOES THEIR OWN SET UP OR MAKES CHANGES TO THE ORIGINAL TRAFFIC <br />CONTROL PLAN. <br />13.A TEMPORARY OCCUPANCY PERMIT IS REQUIRED FOR WORK THAT INVOLVES THE USE OF THE SIDEWALK OR A PORTION OF THE STREET <br />PAVEMENT, UP TO ONE FULL DAY, TO PERFORM BUILDING MAINTENANCE WORK (E.G., USING A CRANE OCCUPYING A PARKING SPACE OR PRUNING <br />TREES). <br />14.A SPECIAL TRAFFIC PERMIT (STP) IS REQUIRED FOR ANY WORK THAT INVLOVES THE CLOSING OF A STREET, ALLEY, OR SIDEWALK. A CONTRACTOR <br />MUST APPLY FOR AN STP A MINIMUM OF TWO BUSINESS DAYS BEFORE UNDERTAKING SAID WORK. <br />15.THE CONTRACTOR IS REQUIRED TO CONTACT AGENCIES SUCH AS CALTRANS, PORT, RECREATION AND PARK DEPARTMENT FOR WORK ON CERTAIN <br />STREETS THAT INCLUDE BUT NOT LIMITED TO FREEWAYS,OFF-RAMPS/ON-RAMPS, STREETS ALONG WATERFRONT(TYPICALLY ONE BLOCK AWAY), <br />STREETS THROUGH PARKS (E.G. GOLDEN GATE PARK) AND OTHERS. <br />16.CITY OF MANTECA ENGINEER OR HIS REPRESENTATIVE HAS THE AUTHORITY TO INITIATE FIELD CHANGES TO ASSURE PUBLIC SAFETY. <br />TRAFFIC CONTROL GENERAL NOTES: <br />28" TRAFFIC CONE <br />TEMPORARY SIGN STAND (SHOWING FACING RIGHT) <br />TYPE 1 BARRICADE <br />DIRECTION OF TRAFFIC <br />FLASHING ARROW SIGN (FAS) <br />WORK ZONE <br />FLAGGER STATION <br />LEGEND: <br />PROJECT LOCATION: <br />PRIME CONTRACTOR:CONTACT: <br />PROJECT SCOPE:ENGINEER STAMP:DESIGNED BY: <br />REVISION NO. <br />AS SHOWN <br />SAN LEANDRO / 72 <br />REVIEWED BY / APPROVED BY: <br />CITY ENGINEER: <br />SCALE: <br />DATE: <br />BRANCH: <br />DRAWING NO. <br />FRENCH CAMP ROAD AND S AIRPORT WAY, MANTECA, CA <br />KNIFE RIVER CONSTRUCTION FRANCISCO SALCEDO <br />PROJECT MANAGER <br />209.932.2100 <br />SAWCUT AND REMOVE CORNER PAVEMENT GUSTAVO PEREZ <br />855.351.1114 <br />gperez@tprco.com <br />2020 <br />20-001-KR-SL <br />0 <br />1 <br />REMOVE AND REPLACE STRIPING <br />NOTES: <br />1.WORK TO INCLUDE SAWCUT AND REMOVAL OF PAVEMENT AT SOUTH CORNER OF FRENCH <br />CAMP ROAD AND AIRPORT WAY; REMOVE AND REPLACE STRIPING. <br />2.WORK HOURS WILL BE FROM 7AM TO 3PM. <br />3.TWENTY FOUR HOUR CONTACT FOR THIS PROJECT WILL BE: <br /> FRANCISCO SALCEDO 209.932.2100 <br />TRAFFIC CONTROL PLAN <br />FOR <br />CITY OF MANTECA