My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2020 - PS-2002501 thru PS-2003000_ - PS-2002951
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2020
>
PS-2002501 thru PS-2003000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2020 - PS-2002501 thru PS-2003000_ - PS-2002951
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2023 1:45:29 PM
Creation date
2/2/2023 1:43:29 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2002951
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2020
Notes2
Lammers Road & Grant Line Road, Tracy
Address
7275 National Drive, Suite A2 94550
Application
Tennyson Electric
Type
Traffic Signal Pole Installation
Supplemental fields
Cross Ref
PWP7110005
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PS-2002951 September 25, 2020 <br />SPECIAL CONDITIONS FOR <br />ENCROACHMENT PERMIT <br /> <br />1. The applicant or contractor shall verify that all traffic signal poles are located in either City of <br />Tracy or San Joaquin County right-of -way. Verification must be provided to San Joaquin County <br />Public Works Department. <br /> <br />2. Maintain traffic controls for all roads. Traffic control delays shall not exceed 15 minutes. <br />Two-way traffic shall be maintained during non-working hours with excavated areas backfilled or <br />plated. During working hours, two-way traffic control shall be maintained with one lane open and <br />appropriate flaggers. The contractor shall submit traffic control plans for all signing, detours, and <br />any lane closure impacting County right-of -way. Traffic control plans shall be submitted two <br />weeks prior to the closure date. <br /> <br />3. Access to all properties shall be maintained at all times except when work is occurring at the <br />access point. Minimal delays will be allowed to provide access within the work zone area. <br />Driveway access shall be fully restored at the end of each workday. Driveways disturbed by the <br />contractor shall be replaced with in-kind or better materials. <br /> <br />4. Residents and businesses shall be notified in writing, as approved by the County, 48 hours in <br />advance of any impacts to their access. <br /> <br />5. Any areas where parking is to be restricted shall have signs noting the restrictions in place at <br />least 48 hours in advance. <br /> <br />6. Existing fences shall not be removed without written consent of the property owner. Such consent <br />shall be submitted to the County prior to the removal. Fences removed shall be restored with in- <br />kind or better materials. Restored fences shall not encroach into County right-of -way. <br /> <br />7. All destroyed or obliterated pavement markings must be replaced in kind by the permittee. Typical <br />pavement markings include but not limited to lane lines, centerlines, stop and stop ahead <br />legends, limit lines, raised pavement markers and miscellaneous delineators. <br /> <br />8. The Permittee is responsible for the preservation of survey monuments located within the area of <br />work herein permitted. Prior to the start of construction, survey monuments that potentially may <br />be disturbed shall be located and referenced by a Licensed Land Surveyor, and a Corner Record <br />filed with the County Surveyor. Any Survey Monuments disturbed during the course of <br />construction shall be reestablished by a Licensed Land Surveyor and another Corner Record filed <br />with the County Surveyor. (Land Surveyors’ Act Section 8771) <br /> <br />9. All future maintenance of the portable traffic signal and related facilities within the County right-of - <br />way will require a San Joaquin County Encroachment Permit. <br /> <br />10. Trenches shall be maintained in a smooth and even condition to the satisfaction of the County <br />throughout the project limits at all times. <br /> <br />11. All trenches shall be completely backfilled or shored and plated at the end of each workday, and <br />the roadway restored to two-way traffic. If plating is to be used, a trench shoring and plating plan
The URL can be used to link to this page
Your browser does not support the video tag.