My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2020_PS-2003001 thru PS-2003500_-PS-2003367
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2020
>
PS-2003001 thru PS-2003500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2020_PS-2003001 thru PS-2003500_-PS-2003367
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2023 2:17:57 PM
Creation date
3/17/2023 2:15:51 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2003367
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2020
Notes2
S/S 6th St. 522' W/O D St.
Address
1602 E. Lafayette St., Stockton,CA 95205
Application
California Water Service
Type
Bell Holes
Supplemental fields
Cross Ref
PWP730077
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Note 1 <br />Min 6" Pavement -0�i 6" fi" Min <br />TYp) (TYp) <br />\z See Note 2 Below ., \ <br />3 0" Compact in 12" max \ 3'-0" <br />\� layers to a min relative �\ <br />? compaction of 95% ? <br />________ \� under pavement and -------- Var <br />Var—_----_ \ 90% outside pavement. <br />*,\ — \ Compact in 24" max j p �i OD+12" <br />\� layers to a min relative \ O <br />OD/2 \ compaction of 85%. <br />\ tea\ a\tea\ aV Compact in 6" layers <br />to a min relative <br />compaction of 90%. <br />10" Min 010" Min 10" Min 10" Min <br />+ 20" Min <br />NOTES: <br />1. New pavement shall be 1" thicker than existing pavement, minimum <br />of 0.25 Ft. New base shall be 1" thicker than existing base, min of 0.50 Ft. <br />2. Select native material or imported granular material as approved by the Director <br />of Public Works. Backfill with materials equal to or better than the existing <br />pavement and base in quality. <br />3. Relative compaction of materials shall be tested in accordance with <br />the State of California, Dept. of Transportation Testing Manuals, test <br />method No. California 216 or 231. <br />4. All existing pavement shall be neatly cut to line prior to trench excavation. <br />5. Jetting or ponding will be permitted within the street right—of—way with <br />a 3 year bond, when approved by the Director of Public Works. <br />6. When shown by soil composition and compactability, ninety percent (90%) <br />compaction may be used, when approved by the Director of Public Works. <br />7. Special bedding and backfill requirements may be shown on the plans or <br />specified in the special provisions. <br />^YYrv"w uy. <br />TYPICAL TRENCH BACKFILL r�a� <br />xo. Riwi.un De.ox oe 1 Dou <br />�- COUNTY OF SAN 7OAQUlN <br />D�AR'IxIDMI OPPIIBIIC WOItK9 <br />Working for YOU Dote: DEC 201+ Std. Dwg. No. R-21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.