Laserfiche WebLink
I . Department of Public Works <br />SAN�J O A Q V I N Kris Balaji, Director of Public Works <br />I_. COUNTY— 'V Fritz Buchman, Deputy Director/Development <br />r <br />'A,61r0[ness c)r'o 1V5 here. Alex Chetley, Interim Deputy DirectadEngineering <br />Wmicivg for YOU Jim Stone, Deputy Director/Operations <br />Krish Rhea, Managerof Strategic Initiatives <br />Acknowledgement of Monument Preservation <br />l BENJAMIN H. SANTOS a duly Licensed Land Surveyor or a Professional Engineer <br />(Please print) <br />authorized to perform Land Surveying in the State of California, Registration No. 9251 <br />hereby acknowledge and accept all responsibility for the monument preservation as required <br />per Section 8771(a -f) of the Business and Professions Code within the bounds of the <br />construction activity permitted by San Joaquin County Permit No X1908 East 12th St PS -2003369 <br />I further acknowledge that I am hereby responsible for the Acknowledgement of Monument <br />Preservation prior to final acceptance of the construction activity. <br />Signature <br />October 13, 2020 <br />Date <br />PS -MONUMENT PRESERVATION <br />1810 East Hazelton Avenue I Stockton, California 95205 1 T 209 468 3000 1 F 209 468 2999 <br />