Laserfiche WebLink
SCALE: 1"=40'12/3/20201 All proposed underground facilities must maintain a minimum five- foot horizontalseparation and one -foot vertical separation (at crossings) from all DOU facilities,measured edge of facility to edge of facility.23PLACE 635' OF NEW STRAND FROM POLE TO POLEDELASH & RELASH 7000' OF AERIAL FIBER FROM POLETO POLEPLACE (N) STRAP-OUT CASE AT TIE-INMATCHLINE: SEE SHEET 1-4 <br />R/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/W R/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WE PINE STN CURRY AVE53+0053+5054+0054+5055+0055+5056+0056+5057+0057+50 <br />58+00 <br />58+50 <br />59+00 <br />59+50 <br />60+00 <br />60+50 <br />61+00 <br />54+0756+32 <br />58+40 <br />60+40