Laserfiche WebLink
PROJECT DETAILS <br />REPLACE POLE, SECONDARY AND TX <br />INSTALL CONDUCTOR AND SET METERING FOR 200A & 320A 1Ø 120/240V SERVICE <br />APPLICANT INSTRUCTIONS <br />LOC 2: INSTALL 320A PANEL <br />PG&E ELECTRIC CREW INSTRUCTIONS <br />LOC 1: REPLACE 45' CL-5 POLE IN PLACE W/55' CL-1(1-PG&E RISER, 1-COMM RISER) <br />-POLE ADJACENT TO CONCRETE DRIVEWAY <br />INSTALL RAPTOR T-TAP FRAMING FOR PRIMARY W/CUTOUTS ON LOWER ARM <br />- NORTHERN SPAN IS SLACK <br />INSTALL 50kVA TX <br />REPLACE 3-4/0A SECONDARY W/ 4/0A TPX ACSR (SLACK SPAN) <br />REMOVE EXISTING SERVICE <br />INSTALL 4/0A TPX SERVICE <br />LOC 2: INSTALL CLEARANCE POLE <br />CONTINUE 4/0A TPX SERVICE AND SET METERING FOR 320A 120/240V SERVICE <br />LOC 3: REPLACE BRACKET WITH SPOOL AND MAKE CONNECTIONS TO 2-#2A TPX SERVICES