Laserfiche WebLink
COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />P.O. BOX 1810-1810 E. HAZELTON AVENUE Permit No: PS -2003431 <br />STOCKTON, CALIFORNIA 95201 Start Date: <br />(209) 468-3000 Exp. Date: <br />FAX # (209) 468-9324 <br />APN No: 05921045 <br />DRIVEWAY ENCROACHMENT PERMIT <br />To: RAMON MONTANEZFERNANDEZ <br />10979 N. MICKE GROVE <br />LODI, CA 95240 <br />Location: 10979 MICKE GROVE RD.; W/S OF MICKE GROVE RD. 615' N/O EIGHT MILE RD. <br />In compliance with your request of ,and subject to all the terms, conditions and restrictions written below or printed as general or special <br />provisions on any part of this form. <br />Permission is hereby granted to construct shown on <br />Permit Application No. PS -2003431 Quad: NW <br />Jobsite shall be kept in a safe condition at all times by removing daily any excess dirt or debris which might be a hazard to pedestrian and/or <br />vehicular traffic. Adequate lights, signs and barricades shall be placed and maintained by the Permittee for the protection of the public in <br />accordance with the current Caltrans Standard Specifications. <br />A(n) (SEE STAMP) SEE STAMP inside diameter per section 62 of the current Caltrans Standard Specifications, ALTERNATIVE PIPE <br />AND PIPE ARCH CULVERTS, shall be installed in roadside drainage ditch for drainage flow maintenance and shall be of sufficient length to <br />clear toe of approach fill or headwalls. <br />The entire area of driveway approach(es), include flares for turning and /or paved frontage(s), from the edge of roadway pavement to <br />right -of --way (front property) line shall be surfaced with a two inch (2") minimum of asphalt concrete over a (N/A) NOT APPLICABLE <br />minimum of compacted layer of three-quarter inch (3/4") maximum size aggregate base material (road gravel) conforming to Class 2 <br />Aggregate Base specified in Section 26 of the current Caltrans Standard Specification, or with a four inch (4") minimum ofportland cement <br />concrete. <br />If portlan <br />d cement concrete pavement is installed, expansion joints shall be provided at the edge of pavement and along properly line. Surface <br />grades of approaches) and/or to open ends of pipe. No ponding or puddles on pavement surface shall be allowed. <br />The Held Engineering Division of this office shall receive no less than forty-eight (48) hours notice prior to beginning of any work <br />within the County right -of --way. After completion of the work permitted herein, all debris, lumber, barricades or any excess <br />material shall be removed and the jobsite left in a neat workmanlike condition. The Permittee shall fill out and mail notice of <br />completion provided by Grantor. <br />Driveway(s) <br />shall be complete prior to occupancy of the residence, <br />but not to exceed expiration date. <br />FRTTZ BUCHMAN, Director <br />Department of Public Works <br />By V�"l."Of <br />. L��� <br />Permit section <br />FORMS: R-17, SS/WW <br />