My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2023_PS-2300501 thru PS-2301000_ - PS-2300778
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2023
>
PS-2300501 thru PS-2301000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2023_PS-2300501 thru PS-2301000_ - PS-2300778
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2023 8:40:58 AM
Creation date
3/24/2023 8:23:47 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2300778
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2023
Notes2
Both Sides of Hazelton Ave. 66' E/O Ventura Ave.
Address
1602 E. Lafayette St., Stockton,CA 95205
Application
California Water Service
Type
(2)-Bell Holes
Supplemental fields
Cross Ref
PWP730077
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
California MUTCD 2014 Edition Page 1117 <br />(FHWA's MUTCD 2009 Edition, including Revisions 1 & 2, as amended for use in California) <br />Tahlp AF-1011CA1- Maximum Snar.ina of Channeli7ina Devices <br />S ed Maximum Channelizing Devices Spacing <br />_ - <br />- <br />yet <br />-AO-- - -10- - <br />25 25 <br />50 12 <br />30 30 <br />60 15 <br />35 35 <br />70 17 <br />40 40 <br />80 20 <br />45 45 <br />90 22 <br />50 50 <br />100 25 <br />55 50 <br />100 25 <br />60 50 <br />100 25 <br />65 50 <br />100 25 <br />70 50 <br />100 25 <br />75 50 <br />100 25 <br />" Maximum channelizing device spacing for all speeds on one-lanellwo-way tapers is <br />20 feet. <br />Maximum channelizing device spacing for all speeds on downstream tapers is 20 <br />feet. <br />All other tapers are as shown. <br />" Use on intermediate and short-term projects for taper and tangent sections where <br />there are no pavement markings or where there is a conflict between existing <br />pavement markings and channelizing devices. <br />Chapter OF -Temporary Traffic Control Zone Devices <br />Part 6 - Temporary Traffic Control <br />November 7. 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.