Laserfiche WebLink
PROJECT SPECIFICATIONS: <br />1. <br />THESE PROJECT SPECIFICATIONS SHALL APPLY TO ALL IMPROVEMENTS AS SHOWN ON <br />THESE PLANS INCLUDING BUT NOT LIMITED TO ROUGH GRADING, UTILITY, <br />HARDSCAPE, PAVING AND BUILDING PAD CONSTRUCTION. <br />THE WORK TO BE PERFORMED CONSISTS OF THE FURNISHING OF ALL LABOR, METHODS <br />OR PROCESSES, IMPLEMENTS, TOOLS, MACHINERY, WATER AND MATERIALS NECESSARY <br />AND REQUIRED FOR COMPLETION OF THE WORK. <br />FOR THE PURPOSES OF THIS SPECIFICATION THE TERM "CONTRACTOR" SHALL MEAN <br />"ALL CONTRACTORS" UNLESS OTHERWISE QUALIFIED. <br />2.SPECIFICATIONS AND STANDARDS <br />ALL WORK TO BE DONE WITH THIS PROJECT SHALL COMPLY WITH THE STANDARD <br />SPECIFICATIONS AND STANDARD DETAILS OF THE FOLLOWING UNLESS SPECIFICALLY <br />NOTED OTHERWISE: <br />·SAN JOAQUIN COUNTY <br />IF ANY DEVIATION FROM THE CONSTRUCTION PLANS OR SPECIFICATIONS OR AGENCY <br />STANDARDS OR DETAILS IS MADE BY EITHER THE CONTRACTOR OR THE OWNER DURING <br />THE COURSE OF CONSTRUCTION WITHOUT THE PRIOR NOTIFICATION, CONSENT, AND <br />WRITTEN APPROVAL OF MACKAY & SOMPS, MACKAY & SOMPS IS NOT RESPONSIBLE FOR <br />THE RESULTS OF SUCH DEVIATIONS. <br />3.QUALITY CONTROL <br />ALL PUBLIC IMPROVEMENT WORK BY CONTRACTOR SHALL BE DONE UNDER THE <br />INSPECTION OF, AND TO THE SATISFACTION AND ACCEPTANCE OF THE COUNTY <br />ENGINEER. IN THE EVENT OF ANY DISPUTE ARISING AS TO THE INTERPRETATION OF <br />THE LOCAL AGENCIES' SPECIFICATIONS OR DETAILS OR THE CHARACTER OF THE WORK <br />DONE BY THE CONTRACTOR, THE DECISION OF THE COUNTY ENGINEER SHALL BE <br />CONCLUSIVE. <br />4.DISCREPANCIES <br />IF THE CONTRACTOR, IN THE COURSE OF THE WORK, FINDS ANY DISCREPANCY <br />BETWEEN THE PLANS AND PHYSICAL CONDITIONS IN THE FIELD, OR ANY ERRORS OR <br />OMISSION IN THE PLANS, IN THE LAYOUT OF SURVEY STAKES, AND/OR IN <br />INSTRUCTIONS GIVEN, HE SHALL IMMEDIATELY INFORM MACKAY & SOMPS CIVIL <br />ENGINEERS, INC. <br />MANY OF THE ERRORS EXPERIENCED DURING THE COURSE OF CONSTRUCTION ARE <br />EASILY DETECTABLE (AND CORRECTABLE WITH MINIMAL EXPENSE AND DISRUPTION) IF <br />COMMON SENSE AND GOOD CONSTRUCTION PRACTICES ARE FOLLOWED. MACKAY & SOMPS <br />IS NOT RESPONSIBLE FOR ERRANT CONSTRUCTION RESULTING FROM THE CONSTRUCTION <br />PROCESS PROCEEDING BLINDLY FROM STAKES AND/OR PLANS WITHOUT CROSS <br />REFERENCING BETWEEN THE TWO. THE CONTRACTOR SHALL CONDUCT ROUTINE CHECKS <br />PRIOR TO AND DURING CONSTRUCTION AND INSTALLATION OF IMPROVEMENTS AND <br />SHALL HAVE PLANS AVAILABLE AT THE JOB SITE AT ALL TIMES. CHECKS WILL <br />INCLUDE (BUT NOT BE LIMITED TO) THE FOLLOWING TYPES OF ACTIVITIES: <br />PLACING STRING LEVELS ON STRINGLINE CONTROLS TO CONFIRM PROPER SLOPE <br />BEFORE USING THEM FOR CONSTRUCTION. <br />A)USING STRAIGHT EDGE AND HAND LEVEL TO CONFIRM CROSS SLOPES AND <br />ADEQUACY OF STREET DRAINAGE PRIOR TO PLACING PAVEMENT. <br />B)SUBMITTING SHOP DRAWINGS OF FACTORY (OR FIELD) MANUFACTURED <br />FACILITIES WHICH CONTAIN CRITICAL DIMENSIONS OR OTHER CRITICAL <br />CHARACTERISTICS TO MACKAY & SOMPS OR OTHER CONSULTANTS FOR <br />ACKNOWLEDGMENT WELL IN ADVANCE OF CONSTRUCTION. <br />C)TO COMPARE WHAT IS BEING CONSTRUCTED IN THE FIELD TO WHAT IS SHOWN <br />ON THE PLANS. IMPROVEMENTS SHALL NOT BE CONSTRUCTED BY USING <br />CONSTRUCTION STAKES ALONE. <br />ANY TIME THE CONTRACTOR DOUBTS THE REASONABLENESS OR CORRECTNESS OF AN <br />ELEMENT IN THE PLANS OR FIELD CONTROL STAKING, THE CONTRACTOR SHALL <br />CONTACT MACKAY & SOMPS FOR CLARIFICATION OR CONFIRMATION. MACKAY & SOMPS <br />WILL ENDEAVOR TO RESPOND TO ANY SUCH INQUIRY MADE IN GOOD FAITH ON A <br />HIGHEST PRIORITY BASIS. ANY WORK DONE AFTER SUCH A DISCOVERY, UNTIL THE <br />PROBLEM HAS BEEN REMEDIED OR DISPELLED, WILL BE DONE AT THE CONTRACTOR'S <br />OWN RISK. <br />5.PERMITS, CONFORMANCE WITH LAWS <br />CONTRACTOR SHALL COMPLY WITH APPLICABLE LAWS, ORDINANCES, ORDERS, RULES, <br />AND REGULATIONS OF EVERY KIND RELATING TO THE PERFORMANCE OF THE WORK, AND <br />IF ANY PERMIT SHALL BE REQUIRED BY ANY LOCAL GOVERNMENTAL AGENCY OR BE <br />NECESSARY BY LAW, ORDINANCE, OR OTHER REGULATIONS, THE SAME SHALL BE <br />PROCURED BY CONTRACTOR AT THEIR OWN EXPENSE. <br />GENERAL NOTES: <br />1.THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONFIRMING EXISTING CONDITIONS <br />AND CAREFUL EXAMINATION OF THE PLANS AND SPECIFICATIONS. THE <br />SUBMISSION OF A BID SHALL BE CONCLUSIVE EVIDENCE THAT THE CONTRACTOR <br />HAS A COMPLETE UNDERSTANDING OF THE SCOPE OF WORK, MATERIALS REQUIRED, <br />AND QUALITY OF WORK REQUIRED TO COMPLETE THIS CONTRACT. <br />2.ALL CONSTRUCTION AND MATERIAL SHALL BE IN ACCORDANCE WITH LATEST <br />EDITION OF THE SAN JOAQUIN COUNTY IMPROVEMENT STANDARDS. CONTACT PUBLIC <br />WORKS CONSTRUCTION INSPECTION AT LEAST THREE (3) WORKING DAYS PRIOR TO <br />START OF ANY WORK TO ARRANGE FOR INSPECTION. <br />3.BASIS OF ELEVATION DATUM (SEE COVER SHEET). <br />4.THE EXISTING UTILITIES ARE PLOTTED FROM AVAILABLE RECORDS. THE <br />CONTRACTOR SHALL TAKE PRECAUTIONARY MEASURES TO PROTECT THESE <br />UTILITIES. THE CONTRACTOR SHALL NOT EXCAVATE UNTIL ALL UTILITY <br />AGENCIES AND COUNTY HAVE BEEN NOTIFIED AND HAVE THE OPPORTUNITY TO MARK <br />THEIR FACILITIES IN THE FIELD. CONTRACTOR SHALL LIABLE FOR ALL DAMAGES <br />INCURRED. <br />5.EXISTING UTILITIES SHALL NOT BE INTERRUPTED UNTIL THE UTILITY COMPANY <br />HAS PROVIDED ALTERNATIVE SERVICE FACILITIES. THE CONTRACTOR SHALL <br />COOPERATE AND COORDINATE THEIR WORK WITH THE APPROPRIATE AGENCIES AND <br />UTILITY COMPANIES. <br />6.ALL CONSTRUCTION STAKING FOR GRADING, CURB AND GUTTER, SIDEWALK, <br />SANITARY SEWER, STORM DRAINS, WATER LINES, FIRE HYDRANTS, ELECTROLIERS, <br />ETC. SHALL BE DONE UNDER THE DIRECTION OF A REGISTERED CIVIL ENGINEER <br />OR A LICENSED LAND\ SURVEYOR. <br />7.ALL AREAS UNDERGOING GRADING, AND ALL OTHER CONSTRUCTION ACTIVITIES <br />SHALL BE WATERED, OR OTHER DUST-PALLIATIVE MEASURES USED, TO PREVENT <br />DUST, AS CONDITIONS WARRANT. WATER TRUCKS SHALL BE AVAILABLE AT ALL <br />TIMES. THE CONTRACTOR SHALL PROVIDE A POINT OF CONTACT RESPONSIBLE FOR <br />DUST CONTROL WHO SHALL BE AVAILABLE 24 HOURS A DAY. <br />8.ALL LINES ABANDONED DURING CONSTRUCTION SHALL BE REMOVED. <br />9.EXISTING CURB, GUTTER AND SIDEWALKS WITHIN THE PROJECT LIMITS THAT ARE <br />DAMAGED OR DISPLACED, SHALL BE REPAIRED OR REPLACED PER COUNTY STANDARD <br />DETAILS. <br />10.NO TREES SHALL BE REMOVED UNLESS THEY ARE SHOWN AND NOTED TO BE REMOVED <br />ON THE IMPROVEMENT PLANS. ALL TREES CONFLICTING WITH GRADING, <br />UTILITIES, OR OTHER IMPROVEMENTS, OR OVERHANGING THE SIDEWALK OR <br />PAVEMENT TO FORM A NUISANCE OR HAZARD, SHALL BE TRIMMED AND PROPERLY <br />TREATED AND SEALED. THE DRIP LINE OF TREES TO BE SAVED WILL BE FENCED, <br />AND NO GRADING SHALL TAKE PLACE WITHIN THIS FENCED AREA. <br />11.ALL STREET MONUMENTS, LOT CORNER, BENCHMARKS, AND OTHER PERMANENT PIPE <br />OR MONUMENTS DISTURBED DURING THE PROCESS OF CONSTRUCTION SHALL BE <br />REPLACED BY A LICENSED CIVIL ENGINEER OR SURVEYOR PRIOR TO ACCEPTANCE <br />OF IMPROVEMENTS BY THE COUNTY. <br />12.EROSION CONTROL FACILITIES SHALL BE INSTALLED COMPLETE PRIOR TO GRADING <br />AND SHALL BE MAINTAINED. THE CONTRACTOR SHALL PROVIDE A CONTACT THAT <br />CAN BE REACHED 24 HOURS A DAY . THESE FACILITIES SHALL CONTROL AND <br />CONTAIN EROSION CAUSED SILT DEPOSITS AND PROVIDE FOR THE SAFE DISCHARGE <br />OF SILT-FREE STORM WATERS INTO EXISTING STORM DRAIN FACILITIES. <br />13.IF, DURING CONSTRUCTION, ARCHAEOLOGICAL REMAINS ARE ENCOUNTERED, <br />CONSTRUCTION IN THE VICINITY SHALL BE HALTED, AND ARCHAEOLOGIST <br />CONSULTED, AND THE COUNTY PUBLIC WORKS DEPARTMENT NOTIFIED. IF, IN THE <br />OPINION OF THE ARCHAEOLOGIST, THE REMAINS ARE SIGNIFICANT, MEASURES, AS <br />MAY BE REQUIRED BY THE PUBLIC WORKS DIRECTOR, SHALL BE TAKEN TO PROTECT <br />THEM. <br />14.WORK SHALL BE RESTRICTED TO WEEKDAYS BETWEEN 7:00 AM AND 7:00 PM AND <br />WEEKENDS 9:00 AM TO 5:00 PM. WORK WHICH REQUIRES ANY TRAFFIC LANE <br />CLOSURES OR RESTRICTING OF THE TRAVELED WAY SHALL BE LIMITED TO 9:00 AM <br />TO 3:30 PM IN THE COMMUTE DIRECTION AND 8:00 AM TO 4:30 PM IN THE <br />NON-COMMUTE DIRECTION. ALL LANE CLOSURES SHALL BE COORDINATED WITH THE <br />SCHOOL DISTRICT & COUNTY & WILL REQUIRE A FORMAL TRAFFIC CONTROL PLAN <br />BE PREPARED AT THE CONTRACTOR'S EXPENSE. <br />15.THE OVERTIME COST FOR INSPECTING WORK THAT REQUIRES COUNTY INSPECTION <br />AND IS PERFORMED BEFORE 8:00 AM, AFTER 5:00 PM, WEEKENDS, AND HOLIDAYS, <br />SHALL BE PRE-PAID BY THE CONTRACTOR OR OWNER BEFORE THE WORK IS <br />AUTHORIZED. <br />16.CONSTRUCTION EQUIPMENT WHICH OPERATES AT A NOISE LEVEL IN EXCESS OF 85 <br />DECIBELS (MEASURED ON THE A-WEIGHTED SCALE DEFINED IN ANSI S-1.4) AT A <br />DISTANCE OF 100 FEET FROM THE EQUIPMENT IS PROHIBITED. <br />17.THE CONTRACTOR SHALL KEEP EXCAVATIONS FREE FROM WATER DURING <br />CONSTRUCTION; STATIC WATER LEVEL SHALL BE DRAWN DOWN A MINIMUM OF 2 <br />FEET BELOW BOTTOM OF EXCAVATIONS TO MAINTAIN UNDISTURBED STATED OF <br />NATURAL SOILS AND ALLOW PLACEMENT OF ANY FILL TO SPECIFIED DENSITY. <br />DISPOSAL OF WATER SHALL NOT DAMAGE PROPERTY OR CREATE A PUBLIC <br />NUISANCE. GROUNDWATER IS EXTREMELY SHALLOW AND MAY BE ENCOUNTERED <br />DURING CONSTRUCTION. IF NEEDED, CONTRACTOR SHALL DETERMINE METHOD OF <br />DEWATERING AND PREPARE A DEWATERING PLAN FOR APPROVAL BY THE COUNTY <br />INCLUDING LOCATIONS FOR DISCHARGE/DISPOSAL, PERMITTING REQUIREMENTS, <br />ETC. <br />18.DISPOSAL OF WATER INTO THE COUNTY SANITARY SEWER SYSTEM IS STRICTLY <br />PROHIBITED. <br />19.DISPOSAL OF WATER INTO EXISTING STORM DRAIN SYSTEM MUST BE APPROVED IN <br />WRITING BY THE COUNTY ENGINEER. <br />20.CONTRACTOR SHALL MAINTAIN ALL STREETS, SIDEWALKS, AND ALL OTHER PUBLIC <br />RIGHT-OF-WAY IN A CLEAN, SAFE AND USABLE CONDITION THROUGHOUT THE <br />COURSE OF CONSTRUCTION. ALL SPILLS OF SOIL, ROCK, CONSTRUCTION DEBRIS, <br />ETC., SHALL BE REMOVED IMMEDIATELY FROM PUBLICLY OWNED PROPERTY. ALL <br />ADJACENT PROPERTY, PRIVATE OR PUBLIC, SHALL BE MAINTAINED IN A CLEAN, <br />SAFE AND USABLE CONDITION. THE CONTRACTOR SHALL PROVIDE FOR SAFE, <br />UNOBSTRUCTED ACCESS TO PRIVATE PROPERTY ADJACENT TO WORK THROUGHOUT THE <br />PERIOD OF CONSTRUCTION. <br />21.ALL TRASH, CONSTRUCTION DEBRIS AND MATERIALS SHALL BE CONTAINED WITHIN <br />THE CONSTRUCTION AREA UNTIL OFF-SITE DISPOSAL CAN BE ARRANGED. <br />22.THE CONTRACTOR SHALL KEEP ADJOINING PUBLIC STREETS AND PARKING AREAS <br />FREE AND CLEAN OF PROJECT DIRT, MUD AND MATERIALS DURING THE <br />CONSTRUCTION PERIOD. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CORRECTIVE <br />MEASURES AS DIRECTED BY THE PUBLIC WORKS INSPECTOR AT NO EXPENSE TO THE <br />COUNTY. <br />23.THE CONTRACTOR SHALL PROVIDE ALL SHORING, BRACING, SLOPING OR <br />PROVISIONS TO PROTECT WORKMAN FOR ALL EXCAVATIONS AS REQUIRED FOR THE <br />PROTECTION OF LIFE PROPERTY DURING CONSTRUCTION. SAID PROTECTION IS TO <br />BE DONE IN ACCORDANCE WITH THE REQUIREMENTS OF THE COUNTY'S DEPARTMENT <br />OF PUBLIC WORKS AND THE STATE OF CALIFORNIA REGULATIONS, AND AS PER THE <br />GEOTECHNICAL REPORT. <br />24.GEOTECHNICAL REPORT: ALL GRADING, TRENCHING, COMPACTION, & EARTHWORK <br />SHALL COMPLY WITH THE RECOMMENDATIONS AND REQUIREMENTS OF THE <br />GEOTECHNICAL REPORT FOR THE COUNTY OF SAN JOAQUIN. <br />25.THE CONTRACT DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED <br />STRUCTURE/SURFACE, THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION. <br />THE CONTRACTOR SHALL PROVIDE ALL MEASURES NECESSARY TO PROTECT THE <br />STRUCTURE/SURFACE DURING CONSTRUCTION. SUCH MEASURES SHALL INCLUDE, <br />BUT ARE NOT LIMITED TO, BRACING, SHORING OF LOADS DUE TO CONSTRUCTION <br />EQUIPMENT, ETC. OBSERVATION VISITS BY THE DESIGN TEAM SHALL NOT <br />INCLUDE INSPECTION, REVIEW, OR ACCEPTANCE OF THE ABOVE ITEMS. <br />26.PRIOR TO ANY WORK BEING PERFORMED, THE CONTRACTOR SHALL ATTEND A <br />PRE-CONSTRUCTION MEETING WITH THE COUNTY. THE CONTRACTOR SHALL PROVIDE <br />THE COUNTY AT LEAST 3 WORKING DAYS NOTICE TO SCHEDULE THE <br />PRE-CONSTRUCTION MEETING. THE CONTRACTOR SHALL ALSO NOTIFY THE PROJECT <br />CONTACTS LISTED ON COVER SHEET A MINIMUM OF 3 WORKING DAYS IN ADVANCE <br />OF SAID MEETING: <br />27.ANY DISTURBED OR NEWLY GRADED SOIL MUST BE HYDROSEEDED. <br />INSPECTION REQUIREMENTS <br />A.ANY IMPROVEMENTS FOR WHICH THE COUNTY WILL ASSUME MAINTENANCE <br />RESPONSIBILITY SHALL BE INSPECTED DURING CONSTRUCTION BY THE COUNTY <br />ENGINEER. EACH PHASE OF CONSTRUCTION SHALL BE INSPECTED AND <br />APPROVED PRIOR TO PROCEEDING TO SUBSEQUENT PHASES. <br />B.THE COUNTY SHALL BE GIVEN ADVANCE NOTICE (3 WORKING DAYS) OF <br />INITIAL CONSTRUCTION START-UP AND 48-HOUR NOTICE OF SPECIALTY <br />INSPECTION REQUIREMENTS NEEDED DURING THE PROJECT. <br />C.ANY IMPROVEMENTS CONSTRUCTED WITHOUT INSPECTION AS PROVIDED ABOVE <br />OR CONSTRUCTED CONTRARY TO THE ORDER OR INSTRUCTIONS OF THE COUNTY <br />ENGINEER WILL BE DEEMED AS NOT COMPLYING WITH STANDARD <br />SPECIFICATIONS AND WILL NOT BE ACCEPTED BY SAN JOAQUIN COUNTY FOR <br />MAINTENANCE PURPOSES. <br />D.THE CONSULTING ENGINEER SHALL PROVIDE THE COUNTY WITH A COPY OF ALL <br />CUT SHEETS. <br />E.ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH ACCEPTED WORKMANSHIP <br />PRACTICE, THE APPROVED PLANS, AND THESE IMPROVEMENT STANDARDS. ANY <br />WORK NOT ACCEPTED BY THE COUNTY SHALL BE REDONE UNTIL COMPLIANCE IS <br />ACHIEVED. DIRECTIONS GIVEN BY THE COUNTY RELATING TO QUALITY OF <br />MATERIALS AND WORKMANSHIP SHALL BE COMPLIED WITH PROMPTLY BY THE <br />CONTRACTOR. <br />F.ALL MATERIALS USED SHALL BE SUBJECT TO THE INSPECTION AND APPROVAL <br />OF THE DEPARTMENT AT ALL TIMES, AND SHALL NOT BE USED BEFORE BEING <br />INSPECTED AND APPROVED BY THE COUNTY. THE DEPARTMENT HAS THE RIGHT <br />TO REQUIRE ANY TESTING DEEMED NECESSARY TO ENSURE COMPLIANCE OF THE <br />MATERIALS WITH THE PLANS AND SPECIFICATIONS. FAILURE OR NEGLECT ON <br />THE PART OF THE DEPARTMENT TO CONDEMN OR REJECT WORK OR MATERIALS <br />NOT IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS SHALL NOT BE <br />CONSTRUED TO IMPLY THEIR ACCEPTANCE, SHOULD THEIR INFERIORITY <br />BECOME EVIDENT UP TO ONE YEAR AFTER ACCEPTANCE BY THE COUNTY. <br />MATERIALS REJECTED BY THE COUNTY SHALL BE PROMPTLY REMOVED FROM THE <br />JOB SITE. <br />G.PAVING AND SWALE WORK TO BE INSPECTED AND APPROVED BY SOILS <br />ENGINEER. <br />SPECIAL NOTICES AND PERMITS <br />1.CONTRACTOR SHALL BE IN RECEIPT OF COUNTY APPROVED PLANS PRIOR TO <br />CONSTRUCTION. <br />2.CONTRACTOR SHALL NOTIFY ALL UTILITY COMPANIES, AND GOVERNMENTAL OR <br />MUNICIPAL AGENCIES AFFECTED BY THE DEVELOPMENT PRIOR TO BEGINNING OF <br />WORK. <br />3.CONTRACTOR SHALL NOTIFY "UNDERGROUND SERVICE ALERT" (800-227-2660 OR <br />811) 48-HOURS IN ADVANCE BEFORE ANY DIGGING. <br />4.CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL EXISTING <br />MONUMENTS AND/OR OTHER SURVEY MONUMENTS AND SHALL NOTIFY SAN JOAQUIN <br />COUNTY SURVEYOR OF ANY DAMAGED OR REMOVED COUNTY, STATE OR FEDERAL <br />MONUMENTS. <br />5.CONTRACTOR SHALL CONDUCT THEIR OPERATION ENTIRELY OUTSIDE OF ANY "NO <br />GRADING" AREA. THESE AREAS SHALL BE CLEARLY DELINEATED IN THE FIELD <br />PRIOR TO CONSTRUCTION. <br />6.WHERE WORK IS BEING DONE IN AN OFFSITE EASEMENT, THE CONTRACTOR SHALL <br />NOTIFY THE PROPERTY OWNER 48-HOURS PRIOR TO COMMENCING WORK. <br />PROJECT SPECIFIC NOTES <br />1.PRIOR TO PLACING CURB AND GUTTER, SIDEWALK, ASPHALT CONCRETE, SUB-BASE, <br />OR BASE MATERIAL, ALL UNDERGROUND FACILITIES WITHIN THE RIGHT-OF-WAY <br />SHALL BE INSTALLED, BACKFILL COMPLETED, AND THE PUBLIC WORKS DEPARTMENT <br />NOTIFIED THAT THE UTILITY INSTALLATION HAS SATISFACTORILY PASSED <br />ACCEPTANCE TESTS BY EACH OF THE UTILITY COMPANIES HAVING FACILITIES <br />WITHIN THE WORK AREAS. <br />2.THE CONTRACTOR SHALL PROTECT ALL EXISTING MONUMENTS AND HAVE THE <br />ENGINEER TIE OUT BEFORE THE SETTING OF ALL NEW MONUMENTS. ALL SURVEY <br />MONUMENT WELLS SHALL BE FURNISHED AND INSTALLED BY CONTRACTOR AT <br />LOCATIONS SHOWN. DEVELOPER'S ENGINEER SHALL SET AND STAMP ALL <br />MONUMENTS AND FURNISH THE COUNTY ENGINEER WITH A COPY OF A TIE PLAT FOR <br />EACH MONUMENT. <br />3.ANY EXISTING IMPROVEMENTS THAT ARE DAMAGED DURING CONSTRUCTION SHALL BE <br />REMOVED, REPLACED, AND FULLY RESTORED TO IT'S ORIGINAL CONDITION AT THE <br />DEVELOPER'S COST. ALL WORK SHALL BE APPROVED BY THE COUNTY ENGINEER. <br />4.DEVELOPER/CONTRACTORS WORK SHALL BE IN ACCORDANCE WITH THE SAN JOAQUIN <br />VALLEY POLLUTION CONTROL DISTRICT (SJVAPCD) GUIDELINES, INCLUDING <br />SJVAPCD REGULATION VIII AND IMPLEMENT CONTROL MEASURES BASED ON <br />SJVAPCD'S COMPLIANCE ASSISTANCE BULLETIN FOR SHORT TERM IMPACTS. <br />SJVAPCD SHALL BE CONTACTED TO DISCUSS MITIGATION MEASURES AND IMPLEMENT <br />MEASURES FROM TABLE 6-4 OF THE GUIDE FOR ASSESSING AND MITIGATION AIR <br />QUALITY IMPACTS AS WELL. <br />5.ALTHOUGH NOT ANTICIPATED TO BE REQUIRED, IF NECESSARY, DEWATERING PLANS <br />FOR ALL TRENCHES SHALL BE SUBMITTED FOR APPROVAL BY THE COUNTY <br />ENGINEER. <br />6.ALL EXISTING UTILITIES INDICATED HEREON ARE BASED ON RECORD <br />INFORMATION. THEY ARE INTENDED TO SHOW APPROXIMATE LOCATION ONLY. IT <br />IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE LOCATION OF ALL <br />EXISTING UTILITIES PRIOR TO THE START OF CONSTRUCTION. <br />NOTIFICATION: <br />7.THE OFFICE OF MACKAY AND SOMPS (925-225-0690) SHALL BE NOTIFIED AT <br />LEAST TWO (2) WORKING DAYS IN ADVANCE OF THE NEED FOR CONSTRUCTION <br />STAKING. CONTRACTOR SHALL SCHEDULE THEIR EFFORTS TO ALLOW TIME AFTER <br />THE FIELD CREW ARRIVES AT THE SITE FOR THE STAKING NEEDS TO BE <br />ADEQUATELY FULFILLED PRIOR TO THE START OF CONSTRUCTION. <br />8.SHOULD IT APPEAR THAT THE WORK TO BE DONE OR ANY MATTER RELATIVE <br />THERETO IS NOT SUFFICIENTLY DETAILED OR EXPLAINED ON THESE PLANS, THE <br />CONTRACTOR SHALL CONTACT MACKAY & SOMPS AT 925-225-0690 FOR FURTHER <br />EXPLANATION. <br />9.IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO IMMEDIATELY NOTIFY THE <br />COUNTY INSPECTOR AND MACKAY & SOMPS UPON DISCOVERY OF ANY UNANTICIPATED <br />FIELD CONFLICTS. SPECIFIC DETAILS ARE SHOWN ON THESE PLANS FOR OFFSETS <br />AND CLOSE CROSSINGS THAT MAY BE NEEDED TO RESOLVE SUCH CONFLICTS. <br />10.CONTACT SOILS ENGINEER FOR COMPACTION TESTS AND REVIEW OF SUB SURFACE <br />CONDITIONS. SOILS ENGINEER WILL IDENTIFY ANY OVER EXCAVATION <br />REQUIREMENTS ALONG THE EXISTING ROADSIDE AND BBID DRAINAGE/IRRIGATION <br />DITCHES. <br />SAFETY: <br />11.THE CONTRACTOR AGREES THAT IN ACCORDANCE WITH GENERALLY ACCEPTED <br />CONSTRUCTION PRACTICES, CONTRACTOR SHALL ASSUME SOLE AND COMPLETE <br />RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF <br />CONSTRUCTION OF THE PROJECT, INCLUDING SAFETY OF ALL PERSONS AND <br />PROPERTY. THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED <br />TO NORMAL WORKING HOURS. <br />12.ALL TRENCHES SHALL BE SHORED AND PROTECTED IN ACCORDANCE WITH OSHA <br />REQUIREMENTS. <br />PROTECTION AND RESTORATION OF EXISTING FACILITIES: <br />13.CONTRACTOR SHALL MAINTAIN ACCESS TO ALL EXISTING CROSS STREETS AT ALL <br />TIMES DURING CONSTRUCTION UNLESS APPROVED OTHERWISE. <br />14.PRIOR TO CONNECTING TO THE EXISTING 48" STORM DRAIN, CONTRACTOR TO <br />HYDRO TEST ENTIRE PIPE TO 100 PSI FOR A PERIOD OF 2 HOURS. IF TEST <br />FAILS, CONTACT THE ENGINEER IMMEDIATELY. <br />15.EXISTING FENCES / BARRICADES DISTURBED BY CONSTRUCTION SHALL BE <br />RETURNED TO THEIR ORIGINAL CONDITION. CONTRACTOR SHALL PROVIDE <br />TEMPORARY FENCING WHERE NEEDED TO ENSURE THAT LIVESTOCK REMAINS <br />CONFINED TO WITHIN EXISTING BOUNDARIES. <br />16.THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF PUBLIC AND <br />PRIVATE PROPERTY ADJACENT TO THE LIMITS OF WORK AND SHALL EXERCISE DUE <br />CAUTION TO AVOID DAMAGE TO SUCH PROPERTY. <br />17.SAFE AND ADEQUATE PEDESTRIAN ZONES AND PUBLIC TRANSPORTATION STOPS, AS <br />WELL AS PEDESTRIAN CROSSINGS OF THE WORK AT INTERVALS NOT EXCEEDING 300 <br />FEET SHALL BE MAINTAINED UNLESS OTHERWISE APPROVED BY THE ENGINEER. <br />18.SAFE AND ADEQUATE PEDESTRIAN AND VEHICULAR ACCESS SHALL BE PROVIDED AND <br />MAINTAINED TO FIRE HYDRANTS, COMMERCIAL AND INDUSTRIAL ESTABLISHMENTS, <br />PUBLIC BUILDINGS, PARKING LOTS, AND ESTABLISHMENTS OF SIMILAR NATURE. <br />ACCESS TO THESE FACILITIES SHALL BE CONTINUOUS AND UNOBSTRUCTED UNLESS <br />OTHERWISE APPROVED BY THE ENGINEER. <br />19.TRAFFIC: <br />20.IF TEMPORARY LANE CLOSURES ARE REQUIRED FOR CONSTRUCTION OPERATIONS, <br />THE CONTRACTOR SHALL PREPARE A TRAFFIC CONTROL PLAN AND OBTAIN APPROVAL <br />FROM THE COUNTY BEFORE COMMENCING WORK. THE CONTRACTOR SHALL ALSO <br />PROVIDE FLAGGERS, CONES AND/OR BARRICADES AS NECESSARY TO CONTROL <br />TRAFFIC AND PREVENT HAZARDOUS CONDITIONS. <br />21.CONTRACTOR SHALL PROVIDE TRAFFIC CONTROL PER COUNTY SPECIFICATIONS <br />DURING CONSTRUCTION AND MAINTAIN TWO-WAY TRAFFIC FOR ACCESS TO EACH <br />BUSINESS AT THE END OF EACH DAY. <br />22.EXISTING DRIVEWAYS IMPACTED BY CONSTRUCTION SHALL BE REPLACED IN KIND. <br />COORDINATE WORK WITH PRIVATE PROPERTY OWNER.GENERAL NOTES / INDEX SHEEET2SAN JOAQUIN COUNTYSHEET:OF: <br />Plan File No. <br />Comp. File No. <br />5IMPROVEMENT PLANS19960WEST GRANT LINE ROADPHASE 3REVISIONSSAN JOAQUIN COUNTY