Planner:  Kevin Withrow, 510‐701‐8037DateActivityCleanup and de‐mobilize.4/27 ‐ 28:  Carbona 1101 ‐ between normal open sw 3795 on pole 7/09 and open jumpers east of 7/10 (install temp jumpers to keep transformer hot at 7/10)T‐line Clearance (north end of Corral Hollow):  Set new TSP 007/009 (100', B‐DV‐DE),  wood pole 007/008 (80' H4, B‐SV‐PJ) and dead end existing bundled 715 AAC in the back direction of 007/008 and ahead direction of 007/009;  set wood pole 007/010 (100' H6, B‐1‐VP) in place and transfer conductor;  install 2 spans of bundled 715 AAC between 007/008 and 007/009, dead end and make up jumpers; remove existing transmission bundled conductor between new TSP 007/009 to existing wood pole 007/009 and then to wood pole 007/008;  top existing wood pole 007/009 above distribution.Distribtution (south end of Corral Hollow):  Wood pole 007/019 ‐ install new tangent line arm, transfer cutout arm/cutouts/OD tx bank/ OH service/secondary riser to new pole (set in place);  TSP 007/020 ‐ transfer 3/0 AAC conductor to new TSP; remove idle 4AR tap to pole 008/001; remove span guy to strain pole.Tx 317246243975, 5 customers off pole 007/019; TX 317246243930 (4); Tx 317246743987 (1)5/1:  Carbona 1101 ‐ between UG riser switch 14949 and flying bells n/o of distribuion interset n/o of 7/19.Thursday 10/8 to Saturday 10/10T‐line Clearance (south end of Corral Hollow): Set TSP 007/020 (95', B‐DV‐DE‐PJ); set new wood pole 007/019 (95' H6, B‐1‐VP) in place; transfer and dead end conductor in the back and ahead direction on TSP 007/020; transfer conductor to new wood pole 007/019; remove span guy from existing wood pole 007/020 going across street to strain pole;  remove strain pole, top existing wood pole 0007/020 above communication level.Tesla ‐ Stockton Cogen Jct 115kv, Sw 119 at Thermal Energy Jct, Sw's 127 and 139 at Simpson Paper Jct. Tesla ‐ Stockton Cogen Jct 115kv, Sw 119 at Thermal Energy Jct, Sw's 127 and 139 at Simpson Paper Jct. Tx 317246744188, 3 customers off pole 007/010. 4/29:  Carbona 1101 ‐ between normal open sw 3795 on pole 7/09 and open jumpers east of 7/10Distribution: (north end of Corral Hollow): TSP 007/009‐ transfer 3/0 AAC 12kv conductor to gull alley arm; Wood pole 007/010 ‐ install new tangent line arm, transfer cutout arm/cutouts/OD tx bank/1/0 QPX OH service/secondary riser to new pole (set in place).74016342Tesla ‐ Stockton Cogen Jct 115kvCorral Hollow Road, TracyT‐line Clearance:  Tesla ‐ Stockton Cogen Jct 115kv, Sw 119 at Thermal Energy Jct, Sw's 127 and 139 at Simpson Paper Jct, Monday 10/05 ‐ Saturday 10/10.  Note ‐ Ripon Cogen will be affected.Material:  Pick up t‐line material and TSPs in Lodi prior to start of construction.  Wood poles will be jobsited.  Scope:  Relocate poles for city of Tracy road widening.  Work consists of the installation of 2 TSPs and foundations with associated framing; installation of 4 wood poles with associated framing and guying; removal of 4 wood poles with associated framing and guying and 1 strain pole; topping of 1 wood pole above the distribuiton;  installation of 2 spans of 715 AAC bundled conductor ( 75' and 213'); transfer of distribution underbuild. (T‐line conductor consists of bundled 715 AAC)Wednesday, 9/30  to Friday, 10/2Monday 10/5 to Wednesday 10/7Prep for clearance:  Mob to site;  frame and set wood pole 007/008A (80' H3, B‐SV‐PJ) with associated guying and anchor;  site poles, material and frame structures 007/008, 007/009, 007/010, 070/019 and 007/020; install anchor at 007/008; install flying bells between structures 7/18 and 7/19.Schedule: 5 ‐ 10 hour daysWeek of 9/7 or earlierNote:  1) 4ar 12 kv line going east from TSP 7/20 is idle and can be removed.  2)  Existing wood pole at structure 007/009 will still have distribution facilities on it, so top pole above the 12kv.  3) Wood poles 007/010 and 007/019 have secondary and/or phone risers, therefore requiring in place sets. 4) For work during clearance multiple crews required. 5)  For distribution clearance on southern end, flying bells are needed to be installed.Carbona 1101 for flying bellsNotificationFoundations: Mobilize to site and install TSP foundations at 7/09 (6.5' x 21' excavation)  and 7/20 (6.5' x 23' excavation) per drawing 113749.   Testing of concrete required.Carbona 1101 between normal open switch 3795 and existing flying bells at 7/10 for foundation at 7/9.Non‐testTx 317246744188, 3 customers off pole 007/010. Clearance