Laserfiche WebLink
6" Min <br />(Typ) <br />3'-0" <br />OD/2 <br />10" Min <br />See Note 1 Below <br />Existing <br />Pavement 6" <br />See Note 2 Below <br />Compact in 12" max— <br />layers to a min relative <br />compaction of 95% <br />under pavement and <br />90% outside pavement. <br />-Compact in 24" max— <br />layers to a min relative <br />compaction of 85%. <br />—Compact in 6" layers <br />to a min relative <br />compaction of 90%. <br />Irl <br />+ zu nein <br />+ 20" M i n <br />I —6" Min <br />(Typ) <br />�31-0" <br />Var <br />OD+12 <br />RIGID CONDUIT FLEXIBLE CONDUIT <br />10" Min <br />NOTES - <br />1 . <br />OTES:1. New pavement shall be 1" thicker than existing pavement, minimum <br />of 0.25 Ft. New base shall be 1" thicker than existing base, min of 0.50 Ft. <br />2. Select native material or imported granular material as approved by the Director <br />of Public Works. Backfill with materials equal to or better than the existing <br />pavement and base in quality. <br />3. Relative compaction of materials shall be tested in accordance with <br />the State of California, Dept. of Transportation Testing Manuals, test <br />method No. California 216 or 231. <br />4. All existing pavement shall be neatly cut to line prior to trench excavation. <br />5. Jetting or ponding will be permitted within the street right—of—way with <br />a 3 year bond, when approved by the Director of Public Works. <br />6. When shown by soil composition and compactability, ninety percent (90%) <br />compaction may be used, when approved by the Director of Public Works. <br />7. Special bedding and backfill requirements may be shown on the plans or <br />specified in the special provisions. <br />VApproved by: <br />IAL TRENCH BACKFILL 1 <br />V, TYP G <br />41Z No. Revision Description Date <br />COUNTY OF SAN JOAQUIN <br />yy,,..,,�� DEPARTMENT' OF PUBLIC WORKS r� <br />wo`�S for YOU Date: DEC 2014 Std. Dwg, No. R-29 <br />