Laserfiche WebLink
NOTES: <br />1. If the distance between cross—cuts are less then 150' the entire area between <br />corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br />2. The resurfacing requirements shall be in addition to County Standard Drawing No. <br />R-29. <br />3. Resurfacing for Bell Holes shall meet these requirements. If excavation occurs within <br />the shoulder or lane, only that area shall be resufaced as shown. <br />4. If cross—cutting is performed on Local Roads at intervals less then 150' a Seal <br />Coat for that half of the roadway containing the trench can be used in lieu of <br />resurfacing. Section 2-5.03 (B-2). <br />C � <br />O � <br />� r L <br />U � U <br />O C <br />O O <br />cU <br />N O <br />pL O <br />3 m <br />V) <br />Q <br />Paved Shoulder °' <br />U F <br />00 <br />St <br />3 t <br />� U <br />100 <br />4001000nMil 4 '_ <br />FORO C <br />7 <br />U <br />0 <br />O <br />U <br />• TRENCH CUTTING POLICY Approved by: <br />CROSS CUTTING OF <br />COUNTY ROADWAYS <br />No. Revision Description Date <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />Working for YOUDate: DEC 2014 IStd. Dwg. No. R-36 <br />