Laserfiche WebLink
6" Mi <br />(TYp) <br />3 <br />See Note 1 Below <br />Existing <br />6" Pavement 1 <br />T GU IVIIII <br />RIGID CONDUIT <br />See Note 2 Below <br />P in 12' max <br />s to a min rela <br />ction of 95% <br />:r pavement and <br />outside pavemei <br />Campo in 24" max <br />to a min relative <br />comp of 85%. <br />ipact in 6" layer. <br />min relative <br />paction of 90%. <br />177 <br />(. <br />3'—( <br />ive x� <br />-------- \ Var <br />p \i OD+1 <br />Min OD 10" t <br />OD <br />T LV Nllfl <br />FLEXIBLE CONDUIT <br />NOTES: <br />I New pavement shall be I thicker than existing pavement, minimum <br />of 0.25 Ft. New base shall be 1" thicker than existing base, min of 0.50 Ft, <br />2. Select native material or imported granular material as approved by the Director <br />of Public Works. Backfill with materials equal to or better than the existing <br />pavement and base in quality. <br />3. Relative compaction of materials shall be tested in accordance with <br />the State of California, Dept. of Transportation Testing Manuals, test <br />method No. California 216 or 231. <br />4. All existing pavement shall be neatly cut to line prior to trench excavation. <br />5. Jetting or ponding will be permitted within the street right—of—way with <br />a 3 year bond, when approved by the Director of Public Works. <br />6. When shown by soil composition and compactability, ninety percent (90%) <br />compaction may be used, when approved by the Director of Public Works. <br />7. Special bedding and backfill requirements may be shown on the plans or <br />specified in the special provisions. <br />TYPICAL TRENCH BAC��ILL <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />Date: DEC 2014 <br />Min <br />YP) <br />2,1 <br />lin <br />Dwg. No. R-29 <br />...;;5 <br />\\ <br />Corr <br />\ Jaye <br />\i <br />\\ <br />or \\ <br />__ _ <br />- - <br />----- <br />compo <br />\� undl <br />90% <br />Com <br />\� layers <br />\\ corn <br />Con <br />/22 <br />TT <br />to c <br />corn <br />Min <br />OD <br />10" <br />OD <br />T GU IVIIII <br />RIGID CONDUIT <br />See Note 2 Below <br />P in 12' max <br />s to a min rela <br />ction of 95% <br />:r pavement and <br />outside pavemei <br />Campo in 24" max <br />to a min relative <br />comp of 85%. <br />ipact in 6" layer. <br />min relative <br />paction of 90%. <br />177 <br />(. <br />3'—( <br />ive x� <br />-------- \ Var <br />p \i OD+1 <br />Min OD 10" t <br />OD <br />T LV Nllfl <br />FLEXIBLE CONDUIT <br />NOTES: <br />I New pavement shall be I thicker than existing pavement, minimum <br />of 0.25 Ft. New base shall be 1" thicker than existing base, min of 0.50 Ft, <br />2. Select native material or imported granular material as approved by the Director <br />of Public Works. Backfill with materials equal to or better than the existing <br />pavement and base in quality. <br />3. Relative compaction of materials shall be tested in accordance with <br />the State of California, Dept. of Transportation Testing Manuals, test <br />method No. California 216 or 231. <br />4. All existing pavement shall be neatly cut to line prior to trench excavation. <br />5. Jetting or ponding will be permitted within the street right—of—way with <br />a 3 year bond, when approved by the Director of Public Works. <br />6. When shown by soil composition and compactability, ninety percent (90%) <br />compaction may be used, when approved by the Director of Public Works. <br />7. Special bedding and backfill requirements may be shown on the plans or <br />specified in the special provisions. <br />TYPICAL TRENCH BAC��ILL <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />Date: DEC 2014 <br />Min <br />YP) <br />2,1 <br />lin <br />Dwg. No. R-29 <br />177 <br />(. <br />3'—( <br />ive x� <br />-------- \ Var <br />p \i OD+1 <br />Min OD 10" t <br />OD <br />T LV Nllfl <br />FLEXIBLE CONDUIT <br />NOTES: <br />I New pavement shall be I thicker than existing pavement, minimum <br />of 0.25 Ft. New base shall be 1" thicker than existing base, min of 0.50 Ft, <br />2. Select native material or imported granular material as approved by the Director <br />of Public Works. Backfill with materials equal to or better than the existing <br />pavement and base in quality. <br />3. Relative compaction of materials shall be tested in accordance with <br />the State of California, Dept. of Transportation Testing Manuals, test <br />method No. California 216 or 231. <br />4. All existing pavement shall be neatly cut to line prior to trench excavation. <br />5. Jetting or ponding will be permitted within the street right—of—way with <br />a 3 year bond, when approved by the Director of Public Works. <br />6. When shown by soil composition and compactability, ninety percent (90%) <br />compaction may be used, when approved by the Director of Public Works. <br />7. Special bedding and backfill requirements may be shown on the plans or <br />specified in the special provisions. <br />TYPICAL TRENCH BAC��ILL <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />Date: DEC 2014 <br />Min <br />YP) <br />2,1 <br />lin <br />Dwg. No. R-29 <br />T LV Nllfl <br />FLEXIBLE CONDUIT <br />NOTES: <br />I New pavement shall be I thicker than existing pavement, minimum <br />of 0.25 Ft. New base shall be 1" thicker than existing base, min of 0.50 Ft, <br />2. Select native material or imported granular material as approved by the Director <br />of Public Works. Backfill with materials equal to or better than the existing <br />pavement and base in quality. <br />3. Relative compaction of materials shall be tested in accordance with <br />the State of California, Dept. of Transportation Testing Manuals, test <br />method No. California 216 or 231. <br />4. All existing pavement shall be neatly cut to line prior to trench excavation. <br />5. Jetting or ponding will be permitted within the street right—of—way with <br />a 3 year bond, when approved by the Director of Public Works. <br />6. When shown by soil composition and compactability, ninety percent (90%) <br />compaction may be used, when approved by the Director of Public Works. <br />7. Special bedding and backfill requirements may be shown on the plans or <br />specified in the special provisions. <br />TYPICAL TRENCH BAC��ILL <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />Date: DEC 2014 <br />Min <br />YP) <br />2,1 <br />lin <br />Dwg. No. R-29 <br />