LINETYPES
<br />ars sar/ ea
<br />VIEW 011111,
<br />—
<br />erg
<br />PL
<br />es
<br />C/L
<br />Miss
<br />PUP
<br />PUBLIC UTILITY EASEMENT
<br />(EXIST.)
<br />EXISTING
<br />ROW
<br />RIGHT OFWAY
<br />FOC
<br />FACE OFCURB
<br />SD
<br />EXISTING STORM DRAIN
<br />MIN
<br />MINIMUM
<br />SS
<br />EXISTING SANITARY SEWER
<br />MAX
<br />MAXIMUM
<br />T
<br />EXISTING TELEPHONE
<br />CDT
<br />CONDUIT
<br />W
<br />EXISTING WATER
<br />m
<br />BACK OFWALK
<br />m
<br />EXISTING ELECTRIC
<br />DOW
<br />FRONTOF WALK
<br />IRR
<br />EXISTING IRRIGATION
<br />EOP
<br />EDGE OF PAVEMENT
<br />G
<br />EXISTING GAS
<br />®
<br />EXISTING COMCAST PEDESTAL
<br />ADPPPX/I BTIC)NIC
<br />COMCAST
<br />COMCAST
<br />PL
<br />PROPERTY LINE
<br />C/L
<br />CENTERLINE
<br />PUP
<br />PUBLIC UTILITY EASEMENT
<br />(EXIST.)
<br />EXISTING
<br />ROW
<br />RIGHT OFWAY
<br />FOC
<br />FACE OFCURB
<br />SD
<br />EXISTING STORM DRAIN
<br />MIN
<br />MINIMUM
<br />SS
<br />EXISTING SANITARY SEWER
<br />MAX
<br />MAXIMUM
<br />T
<br />EXISTING TELEPHONE
<br />CDT
<br />CONDUIT
<br />W
<br />EXISTING WATER
<br />BOW
<br />BACK OFWALK
<br />E
<br />EXISTING ELECTRIC
<br />DOW
<br />FRONTOF WALK
<br />IRR
<br />EXISTING IRRIGATION
<br />EOP
<br />EDGE OF PAVEMENT
<br />G
<br />EXISTING GAS
<br />®
<br />EXISTING COMCAST PEDESTAL
<br />SYMBOLS
<br />6.
<br />®
<br />NEW COMCAST POWER SUPPLY
<br />A
<br />TRANSFORMER
<br />`,100
<br />NEW COMCAST LOW PROFILE
<br />PROPOSED TRENCH/ R/SW ROUTE
<br />1.
<br />8
<br />POWER SUPPLY W/ METER
<br />�y�
<br />STREETLIGHT
<br />Q
<br />NEW COMCAST VAULT
<br />CALL TOLL FREE
<br />TRAFFIC SIGNAL COMBINATION
<br />3.
<br />NEW COMCAST PEDESTAL
<br />,,++,,
<br />V
<br />FIRE HYDRANT
<br />SPECIFIED OTHERWISE.
<br />BORE PIT
<br />Q
<br />MONUMENT
<br />NEW RISER ATTACHED TO POLE
<br />®
<br />CATCH BASIN
<br />EXISTING POLE
<br />SD
<br />STORM DRAIN MANHOLE
<br />EXISTING COMCASTVAULT
<br />5.
<br />DEVIATIONS FROM THE ENGINEERED ROUTE REQUIRES A PROJECT MANAGER AND RIGHT-OF-WAY
<br />®W
<br />WATER MANHOLE
<br />®
<br />EXISTING COMCAST PEDESTAL
<br />EXISTING SANITARY SEWER
<br />6.
<br />WHERE PERMITS FROM STATE, COUNTY, CITY, RAILROAD OR GOVERNMENT AGENCIES ARE
<br />EXISTING IRRIGATION VAULT
<br />SS
<br />SANITARY SEWER MANHOLE
<br />�®
<br />EXISTING UTILITY VAULT/PEDESTAL
<br />®
<br />SEWER CLEAN OUT
<br />©®
<br />GAS/WATERVALVE
<br />EXISTING FENCELINE
<br />ELECTRIC MANHOLE
<br />THE PROJECT MANAGER WILL NOTIFY BUILDING MANAGEMENT WHEN WORK WILL BEGIN ON
<br />TREE/BUSHES
<br />®
<br />UNIDENTIFIED MANHOLE
<br />PH
<br />POTHOLE
<br />W�
<br />WATER METER
<br />OO
<br />SNOWSHOE
<br />ROW LINE
<br />B.
<br />THE PROJECT MANAGER IS TO BE NOTIFIED BY THE CONTRACTOR 24 HOURS PRIOR TO
<br />STREET SIGN
<br />©
<br />GAS METER
<br />9. THE PROJECT MANAGER WILL RESERVE THE RIGHT TO INSPECT AT ANYTIME THE WORK BEING
<br />PERFORMED BY THE CONTRACTOR. IF PROJECT MANAGER DETERMINES THAT THE WORK IS NOT
<br />BEING PERFORMED TO MINIMUM QUALITY STANDARDS, THEN THE CONTRACTOR SHALL PROVIDE
<br />REWORK AT HIS OWN COST.
<br />10. ANY CHANGE IN PROJECT SCOPE, INCLUDING BUT NOT LIMITED TO, CONDUIT LENGTH, CONDUIT
<br />PATH, AERIAL PATH ETC., MUST BE APPROVED BY THE PROJECT MANAGER.
<br />11. ALL CORI N G/CONSTRUCTION THAT WILL CAUSE NOISE AND/OR VIBRATION SHALL BE DONE WITHIN
<br />ALLOWED (9AM-3PM) BUSINESS HOURS.
<br />12. ANY AND ALL UNDERGROUND UTILITIES ENCOUNTERED ARE THE RESPONSIBILITY OF THE
<br />CONTRACTOR TO LOCATE, PROTECT, AND REPAIR, IF DAMAGED.
<br />13. ALL FOOTAGES ARE BASED ON FIELD GATHERED MEASUREMENTS, AS SUCH SOME VARIANCE
<br />SHOULD BE ANTICIPATED. ADJUSTAS NEEDED.
<br />FIBER PLACEMENT NOTES
<br />1. CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES 46
<br />HOURS PRIOR TO CONSTRUCTION ACTIVITY
<br />SEE LOCAL DIRECTORY FOR CONTACT TELEPHONE NUMBER OF
<br />LOCAL CALL BEFORE YOU DIG AGENCY.
<br />2. CONTRACTOR SHALL RECORD SEQUENCE # OF FIBER CABLE AT
<br />EVERY WORK POLE, MANHOLE, FIBRE STORAGE LOOP
<br />AND TAIL LOCATION. CONTRACTOR TO PROVIDE PROJECT
<br />MANAGER WITH SEQUENCE NUMBERS AT PROJECT
<br />COMPLETION.
<br />3. SLACK LOOP AND SNOWSHOE STORAGE LOCATIONS SHALL BE
<br />DETERMINED ON CONSTRUCTION DRAWINGS, HOWEVER,
<br />REEL LENGTHS OF FIVE HUNDRED FEET (500') OR LESS ON LARGE
<br />COUNT FIBER OR THREE HUNDRED (300') OR LESS
<br />ON SMALL COUNT FIBER ARE DIFFICULTTO USE AND SHOULD BE
<br />PLACED AS FSL'S, NOT CUTAND RETURNED.
<br />4. FIBER OPTIC IDENTIFICATION TAGS SHALL BE PLACED AT EVERY
<br />WORK POLE, MANHOLE, FIBER, STORAGE LOOPS, SPLICE
<br />CASES AND WHERE INDICATED BY PROJECT MANAGER. TAGS
<br />NEED TO BE PLACED SO AS TO BE READ FROM THE GROUND.
<br />5. CABLE LUBRICATION SHALL BE USED TO REDUCE PULLING
<br />TENSION. LUBRICANTS MUST NOT CONTAIN ANY PETROLEUM
<br />PRODUCTS.
<br />6. A 100 FOOT FIBER COIL MUST REMAIN IN ALL VAULTS UNLESS
<br />OTHERWISE NOTED.
<br />7. ALL BURIED INFRASTRUCTURE MUST BE ACCOMPANIED WITH
<br />WARNING TAPE ANDA TRACER WIRE, AT RISER POLES THE
<br />LOCATE WIRE SHALL BE ACCESSIBLE ATTHE BASE OF THE RISER.
<br />B.ALL RISERS WILL BE CAPPED AT ALL TIMES.
<br />9.ALL FIBER SHALL BE MARKEDASTO DIRECTION IN EACH VAULT.
<br />RED -NORTH, GREEN -SOUTH, YELLOW -EAST, AND
<br />BLUE -WEST, DO NOTTAPE FIBER CABLES TOGETHER IN RISER.
<br />DISCLAIMER
<br />13. ALL BURIED CONDUIT/CABLE WILL BE PLACED AT 36" MINIMUM COVER. SITE HAS POTENTIAL FOR
<br />1. IT IS THE RESPONSIBILITY OF THE CONSTRUCTION CONSTRUCTOR
<br />GENERAL NOTES:
<br />PROPOSED BORE ROUTE
<br />`,100
<br />BEGIN. NO UNDERGROUND INSTALLATION REPRESENTED WITHIN
<br />PROPOSED TRENCH/ R/SW ROUTE
<br />1.
<br />ALL VAULTS/ HANDHOLES TO BE EQUIPPED WITH SECURITY LIDS WITH LOCKING BOLTS.
<br />NEW AERIAL ROUTE
<br />2,
<br />GROU NO RESTORATION/RIGHT-OF-WAY SHALL BE RESTORED TO ORIGINAL OR BETTER CONDITION
<br />NEW AERIAL STRAND
<br />CALL TOLL FREE
<br />EXISTING COMCAST ROUTE
<br />3.
<br />ALL 90 DEGREE BENDS IN CONDUIT CONSTRUCTION WILL BE A MINIMUM OF 36" RADIUS UNLESS
<br />EXISTING TELEPHONE SYSTEM
<br />Son Diego, 92108-1694
<br />(949 )250-0004 X£AX (949)250-0008
<br />SPECIFIED OTHERWISE.
<br />EXISTING ELECTRICAL SYSTEM
<br />4.
<br />BURIED FIBER OPTIC WARNING SIGNS SHALL BE PLACED AT EACH SIDE OF ALL ROAD CROSSINGS
<br />EXISTING GAS SYSTEM
<br />AT CULVERTS, DITCHES AND IN A STRAIGHT LINE OF SIGHT SPACING OF APPROXIMATELY 500 FEET
<br />EXISTING TV SYSTEM
<br />EXISTING IRRIGATION SYSTEM
<br />5.
<br />DEVIATIONS FROM THE ENGINEERED ROUTE REQUIRES A PROJECT MANAGER AND RIGHT-OF-WAY
<br />OWNER OR CARETAKER APPROVAL PRIOR TO CONSTRUCTION.
<br />EXISTING JOINT TRENCH
<br />EXISTING SANITARY SEWER
<br />6.
<br />WHERE PERMITS FROM STATE, COUNTY, CITY, RAILROAD OR GOVERNMENT AGENCIES ARE
<br />REQUIRED, ALL WORK PERFORMED WILL COMPLY WITH THESE AGENCIES STANDARD
<br />EXISTING STORM DRAIN
<br />SPECIFICATIONS.
<br />EXISTING WATER LINE
<br />EXISTING FENCELINE
<br />7.
<br />THE PROJECT MANAGER WILL NOTIFY BUILDING MANAGEMENT WHEN WORK WILL BEGIN ON
<br />ROADWAVCENTER LINE
<br />BUILDING. CONTRACTOR TO COORDINATE ROOM ACCESS AND WORK START AND STOP TIMES
<br />WITH BUILDING MANAGEMENT.
<br />PROPERTY LINE
<br />ROW LINE
<br />B.
<br />THE PROJECT MANAGER IS TO BE NOTIFIED BY THE CONTRACTOR 24 HOURS PRIOR TO
<br />CONSTRUCTION. SEE COMPANY CONTACT LIST FOR CONTACT NAME(s) AND TELEPHONE
<br />EASEMENT LINE
<br />NUMBER(s).
<br />EOP/FOC/S/W
<br />9. THE PROJECT MANAGER WILL RESERVE THE RIGHT TO INSPECT AT ANYTIME THE WORK BEING
<br />PERFORMED BY THE CONTRACTOR. IF PROJECT MANAGER DETERMINES THAT THE WORK IS NOT
<br />BEING PERFORMED TO MINIMUM QUALITY STANDARDS, THEN THE CONTRACTOR SHALL PROVIDE
<br />REWORK AT HIS OWN COST.
<br />10. ANY CHANGE IN PROJECT SCOPE, INCLUDING BUT NOT LIMITED TO, CONDUIT LENGTH, CONDUIT
<br />PATH, AERIAL PATH ETC., MUST BE APPROVED BY THE PROJECT MANAGER.
<br />11. ALL CORI N G/CONSTRUCTION THAT WILL CAUSE NOISE AND/OR VIBRATION SHALL BE DONE WITHIN
<br />ALLOWED (9AM-3PM) BUSINESS HOURS.
<br />12. ANY AND ALL UNDERGROUND UTILITIES ENCOUNTERED ARE THE RESPONSIBILITY OF THE
<br />CONTRACTOR TO LOCATE, PROTECT, AND REPAIR, IF DAMAGED.
<br />13. ALL FOOTAGES ARE BASED ON FIELD GATHERED MEASUREMENTS, AS SUCH SOME VARIANCE
<br />SHOULD BE ANTICIPATED. ADJUSTAS NEEDED.
<br />FIBER PLACEMENT NOTES
<br />1. CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES 46
<br />HOURS PRIOR TO CONSTRUCTION ACTIVITY
<br />SEE LOCAL DIRECTORY FOR CONTACT TELEPHONE NUMBER OF
<br />LOCAL CALL BEFORE YOU DIG AGENCY.
<br />2. CONTRACTOR SHALL RECORD SEQUENCE # OF FIBER CABLE AT
<br />EVERY WORK POLE, MANHOLE, FIBRE STORAGE LOOP
<br />AND TAIL LOCATION. CONTRACTOR TO PROVIDE PROJECT
<br />MANAGER WITH SEQUENCE NUMBERS AT PROJECT
<br />COMPLETION.
<br />3. SLACK LOOP AND SNOWSHOE STORAGE LOCATIONS SHALL BE
<br />DETERMINED ON CONSTRUCTION DRAWINGS, HOWEVER,
<br />REEL LENGTHS OF FIVE HUNDRED FEET (500') OR LESS ON LARGE
<br />COUNT FIBER OR THREE HUNDRED (300') OR LESS
<br />ON SMALL COUNT FIBER ARE DIFFICULTTO USE AND SHOULD BE
<br />PLACED AS FSL'S, NOT CUTAND RETURNED.
<br />4. FIBER OPTIC IDENTIFICATION TAGS SHALL BE PLACED AT EVERY
<br />WORK POLE, MANHOLE, FIBER, STORAGE LOOPS, SPLICE
<br />CASES AND WHERE INDICATED BY PROJECT MANAGER. TAGS
<br />NEED TO BE PLACED SO AS TO BE READ FROM THE GROUND.
<br />5. CABLE LUBRICATION SHALL BE USED TO REDUCE PULLING
<br />TENSION. LUBRICANTS MUST NOT CONTAIN ANY PETROLEUM
<br />PRODUCTS.
<br />6. A 100 FOOT FIBER COIL MUST REMAIN IN ALL VAULTS UNLESS
<br />OTHERWISE NOTED.
<br />7. ALL BURIED INFRASTRUCTURE MUST BE ACCOMPANIED WITH
<br />WARNING TAPE ANDA TRACER WIRE, AT RISER POLES THE
<br />LOCATE WIRE SHALL BE ACCESSIBLE ATTHE BASE OF THE RISER.
<br />B.ALL RISERS WILL BE CAPPED AT ALL TIMES.
<br />9.ALL FIBER SHALL BE MARKEDASTO DIRECTION IN EACH VAULT.
<br />RED -NORTH, GREEN -SOUTH, YELLOW -EAST, AND
<br />BLUE -WEST, DO NOTTAPE FIBER CABLES TOGETHER IN RISER.
<br />DISCLAIMER
<br />13. ALL BURIED CONDUIT/CABLE WILL BE PLACED AT 36" MINIMUM COVER. SITE HAS POTENTIAL FOR
<br />1. IT IS THE RESPONSIBILITY OF THE CONSTRUCTION CONSTRUCTOR
<br />ROCK THAT WOULD PREVENT THE ABILITY TO PROVIDE THE MINIMUM COVER. IN CASES WHERE
<br />TO VERIFY ALL RIGHT OF WAY BEFORE CONSTRUCTION IS TO
<br />`,100
<br />BEGIN. NO UNDERGROUND INSTALLATION REPRESENTED WITHIN
<br />14. IF THE MINIMUM COVER CANNOT BE ACHIEVED, THE CONDUIT SHALL BE PLACED INA SCH 40 EMT SLEEVE
<br />THESE PLAN SHEETS IS PROPOSED OUTSIDE OF THE RIGHT OF
<br />OR APPROVED EQUIVALENT.
<br />WAY.
<br />15. WATER,SEWER, STORM SEWER AND EASEMENT LOCATIONS ARE BASED OFF OF CITY MAPS,
<br />NOT FIELD VERIFIED.
<br />16. BORING OF AC PAVING IS REQUIRED ATALL LOCATIONS AS INDICATED ON PLANS.
<br />17. AT NO TIME SHALL CURBS, GUTTERS OR HANDICAP BE DISTURBED.
<br />16. DOOR HANGERS ARE TO BE PLACED A MINIMUM OF 72 HOURS PRIOR TO START OF CONSTRUCTION
<br />19. PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL PLACE MESSAGE BOARDS STATING LANE
<br />CLOSURES, AND DELAYS MINIMUM WEEK IN ADVANCE. LOCATION OF THE MESSAGE BOARD SHALL BE
<br />COORDINATED WITH THE CITY INSPECTOR ATTHE PRE -CONSTRUCTION MEETING.
<br />20. LANE CLOSURES CANNOT EXCEED MORE THAN 300 FT. ATA TIME. FOR SAFETY PURPOSES THERE
<br />SHALL BE ONLY ONE CLOSURE ATA TIME MORE FLAGGERS WILL BE NECESSARY TO HELP VEHICLES AND
<br />PEDESTRIANS IN THE WORK ZONES DURING THE LANE CLOSURES.
<br />THIS IS AN COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIAL
<br />DESIGN: REV DESCRIPTION DATE
<br />DRAWN BY:
<br />APPROVED:
<br />APPROVED:
<br />APPROVED:
<br />2. THE UNDERGROUND ROUTE DEPICTED IS PRELIMINARY AND
<br />WILL/MAY VARY ONCE UTILITIES HAVE
<br />BEEN FIELD LOCATED.
<br />3. ANCHORING FOR THE AERIAL CONSTRUCTION IS TYPICALLY
<br />DETERMINED DURING CONSTRUCTION AND IS COLLECTED IN THE
<br />AS -BUILT PHASE.
<br />LEGENDS
<br />PROJ#:JB1110301
<br />CONSTRUCTION TYPE: OVERLASH
<br />COUNTY: SAN JOAQUIN
<br />DRAWN BY: RACHI TOMER
<br />COMCAST CONTACT: DARREN WATSON TEL NO. :925-596-1449
<br />IMPORTANT NOTICE
<br />PLANS PREPARED BY
<br />`,100
<br />o
<br />Government sued requires a
<br />Section er 4216/4217 of the Number
<br />Dig ti Alert Identification of Number to be Issued before s
<br />X w H LA
<br />"Permit to ExcowW will be wild For your Dig Alert I.D.
<br />A CONGRUEX'COMPANY
<br />CALL TOLL FREE
<br />on
<br />9095 Rio Son Diego Dr. Ste 165
<br />COMCAST
<br />48 HOURS BEFORE YOU DIG
<br />UNDERGROUND SERMCE ALERT
<br />1-800-227-2600
<br />Son Diego, 92108-1694
<br />(949 )250-0004 X£AX (949)250-0008
<br />THIS IS AN COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIAL
<br />DESIGN: REV DESCRIPTION DATE
<br />DRAWN BY:
<br />APPROVED:
<br />APPROVED:
<br />APPROVED:
<br />2. THE UNDERGROUND ROUTE DEPICTED IS PRELIMINARY AND
<br />WILL/MAY VARY ONCE UTILITIES HAVE
<br />BEEN FIELD LOCATED.
<br />3. ANCHORING FOR THE AERIAL CONSTRUCTION IS TYPICALLY
<br />DETERMINED DURING CONSTRUCTION AND IS COLLECTED IN THE
<br />AS -BUILT PHASE.
<br />LEGENDS
<br />PROJ#:JB1110301
<br />CONSTRUCTION TYPE: OVERLASH
<br />COUNTY: SAN JOAQUIN
<br />DRAWN BY: RACHI TOMER
<br />COMCAST CONTACT: DARREN WATSON TEL NO. :925-596-1449
<br />
|