Laserfiche WebLink
Special Conditions for ENCROACHMENT PERMIT -2-ROCHE, TRUSTEE OF THE DAVID S. ROCHE TRUST's expense. (Streets and Highways Code Section 1463) 10. All future maintenance of the pipeline and related facilities within the County right-of-way will require a San Joaquin County Encroachment Permit. 11. No trenching. 12. No paving. 13. Class II Aggregate Base shoulder backing is required from the edge of pavement, a minimum of 4-inches-thick by 4-feet wide. 14. Contractor shall establish existing roadway and drainage grades within the construction area. Any repair to roadways and adjacent areas shall match existing grades. Any proposed grade changes shall receive prior approval from County. 15. County roads shall be kept clean from mud and debris at all times along the access points and work zone areas during entire project. All standard roadway striping and signage shall be clearly visible, maintained and restored throughout the construction zone during and after the project. 16. In addition to standard dust control measures, streets shall be maintained in a clean condition, free of dirt, mud and debris during construction activities. The contractor shall provide daily, or as needed, streetsweeping using a modern mechanical or vacuum-assisted street sweeper. 17. The contractor shall not conduct construction operations in rain or heavy fog conditions.