My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2017_PS-1700000 thru PS-1700500_ - PS-1700475
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2017
>
PS-1700000 thru PS-1700500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2017_PS-1700000 thru PS-1700500_ - PS-1700475
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2023 8:40:41 AM
Creation date
4/11/2023 8:38:16 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1700475
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2017\PS-1701001 thru PS-1701500
Year2
2017
Notes2
Gawne Rd. 6,500 W/O Escalon Bellota Rd.
Address
PO Box 5255, Modesto,CA 95352
Application
IIW Farming Inc.
Type
Bore (over 12 inch Dia)
Supplemental fields
Cross Ref
PWP7110005
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Special Conditions for ENCROACHMENT PERMIT -2-ROCHE, TRUSTEE OF THE DAVID S. ROCHE TRUST's expense. (Streets and Highways Code Section 1463) 10. All future maintenance of the pipeline and related facilities within the County right-of-way will require a San Joaquin County Encroachment Permit. 11. No trenching. 12. No paving. 13. Class II Aggregate Base shoulder backing is required from the edge of pavement, a minimum of 4-inches-thick by 4-feet wide. 14. Contractor shall establish existing roadway and drainage grades within the construction area. Any repair to roadways and adjacent areas shall match existing grades. Any proposed grade changes shall receive prior approval from County. 15. County roads shall be kept clean from mud and debris at all times along the access points and work zone areas during entire project. All standard roadway striping and signage shall be clearly visible, maintained and restored throughout the construction zone during and after the project. 16. In addition to standard dust control measures, streets shall be maintained in a clean condition, free of dirt, mud and debris during construction activities. The contractor shall provide daily, or as needed, streetsweeping using a modern mechanical or vacuum-assisted street sweeper. 17. The contractor shall not conduct construction operations in rain or heavy fog conditions.
The URL can be used to link to this page
Your browser does not support the video tag.