My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2017_PS-1700501 thru PS-1701000_ - PS-1700672
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2017
>
PS-1700501 thru PS-1701000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2017_PS-1700501 thru PS-1701000_ - PS-1700672
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2023 9:41:06 AM
Creation date
4/11/2023 9:38:38 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1700672
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2017\PS-1700501 thru PS-1701000
Year2
2017
Notes2
Lammers Rd. 3000' S/O Valpico Rd.
Address
6121 Bollinger Canyon Road, San Ramon,CA
Application
Pacific Gas & Electric - San Ramon
Type
Trench
Supplemental fields
Cross Ref
PWP730052
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2-5.0 TRENCH CUT POUCV General Requirements A. Resurfacing requirements specified in this policy are in addition to the trench resurfacing requirements specified by Couni.y Standard Drawing No. R-29. B. For the purpose of this policy, "Surfacing Age" is defined as the age of the most recently completed roadway surfacing, including construction, reconstruction, or major overlay. C. Where the application of--seai coats is required~ a Type II Slurry Seal wlll be used in accordance with State Standard Specifications, Section 37-2. D. The permittee must post a one-year maintenance bond or cash deposit, in an amount specified by the Department. E. All pavement markirigs destroyed or obliterated must be replcices-in kind by the permittee. Typical pavement markings include, but are not limited to, lane lines, centerlines, stop and stop ahead legends, limit lines, raised pavement markers, and miscellaneous delir.eators. F. The permittee is responsible for Survey Monuments disturbed by trenching and is required-to file a corner record and to reestablish them using a Licensed tand Surveyor after the trench restoration is completed. G. Functional classification maps and Public Works Project Adve1iising Schedules are references for this pollcy. H. To facilitate scheduling and planning, Public Works staff will make available the most current Project Adve1iising-Schedule at the monthly Utility Coordination Meeting and make it available to the public, at the Permits Counter, in January each year. 2-5.02 Collectors, Arterials and Expressways A. Surfacing Age less than Three (3) Years: No pavement cuts. Exceptions may be approved in accordance with Section 2-5.04 EXCEPTIONS. B. Surfacing Age Three (3) Years and Over: 1. Longitudinal Trench Cutting in Paved Shoulder 41
The URL can be used to link to this page
Your browser does not support the video tag.