My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2018_PS-1802001 thru PS-1802500_ - PS-1802326 rider#2 2-18-20
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2018
>
PS-1802001 thru PS-1802500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2018_PS-1802001 thru PS-1802500_ - PS-1802326 rider#2 2-18-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2023 10:31:11 AM
Creation date
4/11/2023 9:48:55 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1802326
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2018\PS-1802001 thru PS-1802500
Year2
2018
Notes2
N/S of Nile Ave. Between Airport Way and Union Rd.
Address
PO Box 930, Stockton,CA 95201
Application
Pacific Gas & Electric-Stockton
Type
Pole Replacement;New Pole Instal
Supplemental fields
Cross Ref
PWP730052
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
COUNTY OF SAINT JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />P.O. BOX 1810-1810 E. HAZELTON AVENUE <br />STOCKTON, CALIFORNIA 95201 <br />(209) 468-3000 <br />FAX # (209) 468-9324 <br />E10TC]L�.®ACIII�IENT PERIVI[IT <br />To: PACIFIC GAS &ELECTRIC - STOCICTON <br />PO BOX 930 <br />STOCKTON, CA 95201 <br />Encroachment T e: <br />Pole Replacement New Pole Install Aerial Work <br />Location: <br />N/S OF NILE AVE. BETWEEN AIRPORT WAY AND UNION RD. <br />Permit No: PS4802326 <br />Date Issued: 06/25/2018 <br />Start Date: 07/20/2018 <br />Exp. Date: <br />Project No: <br />Quad: SE <br />Ol/15/2019 <br />PWP730052 <br />Extended To: 07/15/2020 <br />LTE/CR/PM NO:31209286 <br />Iii DER W 2 <br />e! Z /a 20 <br />In compliance with your request of 06/25/2018 ,permission is hereby granted to do work in County right -of --way as shown on attached <br />application and subject to all the terms, conditions and restrictions written below or printed as general or special provisions on any part of this <br />form. See reverse side and attached sheet, if any. <br />Trench excavations for service connections will not be permitted within ten feet (10') ofpavement centerline unless otherwise approved by the <br />Director. Surface of trench patches shall snatch in kind and be smooth and even with that of abutting surface. Special attention shall be given <br />to depth of utilities through roadside area in anticipation of future drainage facilities, road profile and/or frontage development. All <br />underground utility facilities are to be established and accurately dimensioned on sketches from surveyed centerline of road right of way, or <br />from right of way (border) lines. <br />Permittee shall call the Department of Public Works, Field Engineering Division (Permit Inspections) at (209)9534421 at least <br />forty-eight hours prior to beginning any work within the County right of way. All work performed under this permit shall conform to <br />the rules and regulations pertaining to safety established by the California Division of Industrial Safety and Cal -OSHA. <br />The jobsite shall be kept in a safe condition at all times by the daily removal of any excess dirt or debris which <br />might be a hazard to either <br />pedestrian or automobile traffic. All necessary traffic convenience and warning devices and personnel shall be provided, placed and <br />maintained by and at the sole expense of the Permittee in accordance with the latest edition of the CALTRANS Manual of Traffic Control. <br />After completion of the work permitted herein, all debris, hunber, barricades, or any excess material shall be removed and the jobsite left <br />in a <br />neat worlananlilce manner. hmnediately following completion of construction permitted herein, Permittee shall fill out and mail notice of <br />completion (see attached post card) provided by Grantor. <br />Comments: <br />Traffic Control Per MUTCD*****See Attached "Special Conditions"***** <br />FORMS: SS/WW, R-29 <br />Est. Permit Fee: $1,315.00 <br />WHITE <br />GOLDENROD <br />YELLOW <br />PINK <br />-Permittee <br />-PWD Central File <br />Field Inspection <br />-Permit Section <br />KRIS BALAJI, Director <br />of Public Works <br />
The URL can be used to link to this page
Your browser does not support the video tag.