Laserfiche WebLink
NOTES <br />1. If the distance between cross—cuts are less then 150' the entire area between <br />corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br />2. The resurfacing requirements shall be in addition to County Standard Drawing No. <br />R-29. <br />3. Resurfacing for Bell Holes shall meet these requirements. If excavation occurs within <br />the shoulder or lane, only that area shall be resufaced as shown. <br />4. If cross—cutting is performed on Local Roads at intervals less then 150' a Seal <br />Coat for that half of the roadway containing the trench can be used in lieu of <br />resurfacing. Section 2-5.03 (B-2). <br />Paved Shoulder - <br />7 <br />U <br />L <br />VVITRENCH CUTTING POLICY ,;OL: , CROSS CUTTING OF '' <br />COUNTY ROADWAYS No. Revision Descri ton Date <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />Working fur YOU Date; DEC 2014 Std. Dwg. No. R-$6