My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2019_PS-1901501 thru PS-1902000_ - PS-1901782
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2019
>
PS-1901501 thru PS-1902000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2019_PS-1901501 thru PS-1902000_ - PS-1901782
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2023 3:32:19 PM
Creation date
4/11/2023 3:26:11 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1901782
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2019\PS-1901501 thru PS-1902000
Year2
2019
Notes2
N/S of West Ripon Rd. 450' E/O Mohler Rd.
Address
PO Box 930, Stockton,CA 95201
Application
Pacific Gas & Electric-Stockton
Type
Bell Holes (2); Trench
Supplemental fields
Cross Ref
PWP730052
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
See <br />Min 6" P <br />See Note 2 Below <br />Compact in 12" max— <br />layers to a min relative <br />i compaction of 95% <br />under pavement and <br />90% outside pavement. <br />OD/2 \\ \ <br />r r\\\\r\\ \\ <br />0" Min OD 10" Min <br />OD <br />i20" M <br />Note 1 Below <br />Existing <br />6" avement 1 6" —6" Min <br />Ty (TYp) <br />1 <br />NOTES: <br />n <br />RIGID CONDUIT <br />Compact in 24" <br />layers to a min <br />compaction of <br />max — <br />relative <br />85%. <br />Compact in 6" layers <br />to a min relative <br />compaction of 90%. <br />10" Min <br />3'..0" <br />t---------</ Var <br />20" Min <br />FLEXIBLE CONDUIT <br />12" <br />1 <br />1. New pavement shall be 1" thicker than existing pavement, minimum <br />of 0.25 Ft. New base shall be 1" thicker than existing base, min of 0.50 Ft. <br />2. Select native material or imported granular material as approved by the Director <br />of Public Works. Backfill with materials equal to or better than the existing <br />pavement and base in quality. <br />3. Relative compaction of materials shall be tested in accordance with <br />the State of California, Dept. of Transportation Testing Manuals, test <br />method No. California 216 or 231. <br />4. All existing pavement shall be neatly cut to line prior to trench excavation. <br />5. Jetting or ponding will be permitted within the street right—of—way with <br />a 3 year bond, when approved by the Director of Public Works. <br />6. When shown by soil composition and compactability, ninety percent (90%) <br />compaction may be used, when approved by the Director of Public Works. <br />7. Special bedding and backfill requirements may be shown on the plans or <br />specified in the special provisions. <br />Working far YOU <br />TYPICAL TRENCH BACKFILL <br />No. Revision Description Date <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />Date: DEC 2014 Std. Dwg. No. R-29
The URL can be used to link to this page
Your browser does not support the video tag.