My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2019_PS-1901501 thru PS-1902000_ - PS-1901782
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2019
>
PS-1901501 thru PS-1902000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2019_PS-1901501 thru PS-1902000_ - PS-1901782
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2023 3:32:19 PM
Creation date
4/11/2023 3:26:11 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1901782
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2019\PS-1901501 thru PS-1902000
Year2
2019
Notes2
N/S of West Ripon Rd. 450' E/O Mohler Rd.
Address
PO Box 930, Stockton,CA 95201
Application
Pacific Gas & Electric-Stockton
Type
Bell Holes (2); Trench
Supplemental fields
Cross Ref
PWP730052
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SPECIAL PROVISIONS <br />Winter Weather Utility Work <br />1. SUPERVISION: The utility company (permittee) shall furnish full-time supervision of all work to insure <br />compliance with the permit provision. <br />2. START OF WORK: No work within the County right-of-way shall be started until the utility company <br />representative has made an evaluation of weather conditions and has determined the work can be <br />accomplished under the provisions of the permit. <br />3. CLEAN PAVEMENT: Dirt and mud shall not be deposited on the pavement outside the area of work, <br />and if inadvertently tracked onto the road travel way shall be removed immediately. <br />4. DAILY RESTORATION: Private driveways and road intersections shall be restored daily. <br />5. WEATHER -TIGHT CONDITIONS: All trenches shall be filled and compacted, ditches and other <br />drainage facilities regarded and opened, and the entire work area restored to weather -tight condition prior to <br />any rain. <br />X:\E CRGACFM NMGenetalProvisions(Ere,r chment P1,,et8)AWinter weather emvlsmnsaoex
The URL can be used to link to this page
Your browser does not support the video tag.