My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2019_PS-1903501 thru PS-1904000_ - PS-1903655
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2019
>
PS-1903501 thru PS-1904000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2019_PS-1903501 thru PS-1904000_ - PS-1903655
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2023 4:44:56 PM
Creation date
4/11/2023 4:41:30 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1903655
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2019
Notes2
N/S of West Ripon Rd. 821' W/O Highland Ave.
Address
PO Box 3031, Modesto,CA 95353
Application
Pacific Gas & Electric-Modesto
Type
Underground Service Install in (E)
Supplemental fields
Cross Ref
PWP730052
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SPECIAL PROVISIONS <br />Winter Weather Utility Work <br />1. SUPERVISION: The Utility company (permittee) shall furnish filll-time supervision of all wort{ to Insure <br />compliance with the permit provision. <br />2. START OI+ WORK: No wort{ within the County right -of --way shall be started until the utility company <br />representative has made an evaluation of weather conditions and has determined the work can be <br />accomplished under the provisions of the permit. <br />3. CLEAN PAVEMENT: Dirt and mud shall not be deposited on the pavement outside the area of wort{, <br />and if inadvertently tracked onto the road travel way shall be removed immediately. <br />4. DAILY RESTORATION: Private chiveways and road intersections shall be restored daily. <br />5. WEATHER -TIGHT CONDITIONS: All trenches shall be filled and compacted, ditches and other <br />drainage facilities regarded and opened, and the entire work area restored to weathertight condition prior to <br />any ram. <br />X:\ENCROACH�IENTS1Gencral Provisions (Encroechntenl Permits)\Winter 1VenlBer Provisions.dacx <br />
The URL can be used to link to this page
Your browser does not support the video tag.